Skip to main content

A real analysis, unedited

Supply of bone substitutes and other tissues for ASEPEYO hospitals

Asepeyo, Mutua Colaboradora con la Seguridad Social n.º 151 · Spain · notice on TED, documents from Spain's Public Sector Procurement Platform. Supply of bone substitutes, bone cements, collagen matrices and other tissues to Asepeyo's hospitals in Coslada, Sant Cugat and Cartuja, in 11 lots. Read by Lucius on 16 Nov 2026; every line below is the product's output on the buyer's own pack, in Spanish; each quote is shown in English with the Spanish original under it.

642
Requirements
92
High severity
104
Medium
571
Cited verbatim
76/100
Risk score
26 Nov 2026
Closes
€1,661,077 est. value
Budget

Bid or skip is scored against your own company profile when you upload, so no verdict word appears here.

Key dates, from the pack

  1. Clarification request deadlineAt least 12 days before the end of the bid submission periodp. 17
  2. Clarification response deadlineAt least 6 days before the end of the bid submission period (4 days if urgent)p. 17
  3. Expected contract start date (Lots 1, 2, 3, 5, 8)1/4/2027p. 4
  4. Expected contract start date (Lots 4, 6, 7, 9, 10, 11)1/10/2027p. 4

Requirements by risk type

  • Commercial169 · 15
  • Compliance162 · 24
  • Legal97 · 22
  • Technical80 · 7
  • Financial73 · 15
  • Delivery35 · 4
  • Administrative12 · 3
  • Quality12 · 1
  • Schedule1
  • Scope1 · 1

Bar = rows of that type; the red part is high severity.

The requirement map, all 642 rows

Grouped by response section, high severity first. ✓ = quote verified word for word against the source.

Legal & Litigation120 rows · 25 high

  1. High

    Contract may be terminated on specific contractual termination grounds defined in Annex X (details in omitted pages 5-45).Legal

    Annex X Specific grounds for contractual terminationp. 3✓

    Spanish original

    Anexo X Causas específicas de resolución contractual

    contract termination exposure on specific breach grounds

  2. High

    Breaches during contract performance are subject to the contractual penalties set out in Annex VIII (specific amounts/triggers in omitted pages 5-45).Commercial

    Annex VIII Penaltiesp. 3✓

    Spanish original

    Anexo VIII Penalidades

    financial penalty exposure for performance breaches

  3. High

    If actual needs within the contract period exceed the maximum budgetary cap, the contract shall be terminated without generating any right to compensation for either party.Legal

    In the event that, within the term of the contract, the actual requirements exceed the indicated amount, the contract shall be terminated, without said termination generating any rights to compensation for either party.p. 10✓

    Spanish original

    En el caso de que, dentro de la vigencia del contrato, las necesidades reales fuesen superiores a la cantidad indicada, se procederá a la resolución del contrato, sin que dicha rescisión genere derechos indemnizatorios para ninguna de las partes.

    contract termination without compensation if cap is exceeded

  4. High

    Reaching the award amount prior to expiry of the contract duration constitutes grounds for early contract termination.Legal

    Likewise, it shall be grounds for termination of the contract if the award amount is reached prior to the expiration of the duration term of the contractp. 10✓

    Spanish original

    Igualmente, será causa de resolución del contrato que se alcance el importe de adjudicación antes del vencimiento del plazo de duración del contrato

    early termination upon exhausting award amount before expiry

  5. High

    Reaching the budget foreseen for a contract extension before its expiry, if extensions are exercised, also constitutes grounds for early contract termination.Legal

    or if the amount planned for the contract extension is reached prior to its expiration, in the event that the planned extension or extensions are exercised.p. 10✓

    Spanish original

    o que se alcance el importe previsto para la prórroga del contrato antes de su vencimiento, en caso de que la prórroga o prórrogas previstas se ejerciten.

    early termination upon exhausting extension budget before expiry

  6. High

    Termination of the contract due to early exhaustion of the award or extension amount shall not entitle the contractor to any compensation.Legal

    The termination of the contract on these grounds shall also not give rise to any compensation whatsoever for the successful bidder.p. 10✓

    Spanish original

    La resolución del contrato por esta causa tampoco dará lugar a indemnización alguna para el adjudicatario.

    no contractor indemnification upon early budget exhaustion termination

  7. High

    The contract will also terminate early if the award amount is reached before expiry of the contract term or if the extension budget is reached before expiry of exercised extensions.Legal

    it shall be grounds for termination of the contract if the award amount is reached before the expiry of the duration of the contract or if the amount planned for the extension of the contract is reached before its expiryp. 10✓

    Spanish original

    será causa de resolución del contrato que se alcance el importe de adjudicación antes del vencimiento del plazo de duración del contrato o que se alcance el importe previsto para la prórroga del contrato antes de su vencimiento

    early termination upon award or extension cap exhaustion

  8. High

    In addition to the penalties set out in Clause 20.3 of the PCAP, specific contractual penalties are foreseen.Legal

    In addition to those provided for in clause 20.3 of the specific administrative clauses sheet, the following penalties are foreseen:p. 17✓

    Spanish original

    Además de las previstas en la cláusula 20.3 del pliego de cláusulas administrativas particulares, se prevén las siguientes penalidades:

    contractual penalties apply per Clause 20.3

  9. High

    Specific contractual penalties are foreseen as detailed in Annex VIII.Legal

    Yes, they are foreseen (see Annex VIII)p. 17✓

    Spanish original

    Sí se prevén (vid. Anexo VIII)

    contractual penalties apply per Annex VIII

  10. High

    Failure by the proposed awardee to cure defects within the three-working-day deadline is deemed a withdrawal of its bid, moving to the next ranked bidder.Legal

    If not remedied within the required period, the Board or the contracting authority will understand that the bidder withdraws its offer, proceeding in that case to request the same documentation from the following bidderp. 29✓

    Spanish original

    De no subsanarse en el plazo requerido, la Mesa o el órgano de contratación entenderán que el licitador retira su oferta, procediéndose en ese caso a recabar la misma documentación al licitador siguiente

    deemed bid withdrawal and loss of contract award

  11. High

    If the contract is not formalized within the Art. 153.3 LCSP deadline due to causes attributable to the contractor, ASEPEYO may forfeit the guarantee.Financial

    When, for reasons attributable to the contractor, the contract has not been formalized within the period indicated in art. 153.3 of the LCSP, the Mutua may resolve to forfeit the definitive guaranteep. 31✓

    Spanish original

    Cuando por causas imputables al contratista no se hubiese formalizado el contrato dentro del plazo indicado en el art. 153.3 de la LCSP, la Mutua podrá acordar la incautación de la garantía definitiva

    guarantee forfeiture penalty for delayed formalization

  12. High

    Clause 17.1: Awarded companies are liable for any direct or indirect damages suffered by the Mutua resulting from breach of confidentiality and data protection obligations.Legal

    The successful bidder companies shall be liable for any direct or indirect damages and losses suffered by the Mutua as a result of the breach of this confidentiality and data protection obligation.p. 33✓

    Spanish original

    Las empresas adjudicatarias serán responsables de cualesquiera de los daños y perjuicios directos o indirectos sufridos por la Mutua como resultado del incumplimiento de la presente obligación de confidencialidad y de protección de datos.

    uncapped liability for direct and indirect damages

  13. High

    Clause 18.2: Contract is executed at the contractor's sole risk and venture.Commercial

    The contract shall be executed at the contractor's risk and venturep. 35✓

    Spanish original

    El contrato se ejecutará a riesgo y ventura del contratista

    contractor bears all commercial execution risk

  14. High

    Clause 18.2: Contractor must indemnify all damages caused to Asepeyo and third parties arising from contract execution activities, unless directly and immediately caused by a Mutua order.Legal

    it shall be the contractor's responsibility to indemnify all damages caused both to Asepeyo and to third parties as a consequence of the actions required for the execution of the contractp. 35✓

    Spanish original

    será de cuenta del contratista indemnizar todos los daños que se causen tanto a Asepeyo como a terceros como consecuencia de las actuaciones que requieran la ejecución del contrato

    uncapped indemnification of buyer and third-party damages

  15. High

    Clause 19: Contractor is liable for any consequences to the Mutua or third parties caused by omissions, errors, inadequate methods, or incorrect conclusions during execution.Legal

    as well as for the consequences that may arise for the Mutua or for third parties from omissions, errors, inappropriate methods, or incorrect conclusions in the performance of the contract.p. 36✓

    Spanish original

    así como de las consecuencias que se deduzcan para la Mutua o para terceros de las omisiones, errores, métodos inadecuados o conclusiones incorrectas en la ejecución del contrato.

    broad liability for errors, omissions, and third-party consequences

  16. High

    Clause 20.3.1: Breach of any designated main or complementary task is penalized by withholding payment of pending invoices, without prejudice to contract termination.Commercial

    Non-compliance by the winning company with any of the designated main and complementary tasks shall be penalized by not paying outstanding invoices, without prejudice to termination of the contract being agreed.p. 37✓

    Spanish original

    El incumplimiento por parte de la empresa adjudicataria de cualquiera de las tareas principales y complementarias designadas será penalizado no abonándose las facturas pendientes de pago, sin perjuicio que se acuerde la resolución del contrato.

    non-payment of pending invoices and termination for breach

  17. High

    Clause 20.3.1: Contracting authority may impose penalties under Article 192 LCSP for breach or defective performance of tender terms or applicable laws.Legal

    for non-compliance or defective compliance with what is established in the specifications or in applicable current provisions, it may impose penalties in the manner and conditions established in Article 192 of the LCSP.p. 37✓

    Spanish original

    por incumplimiento o cumplimiento defectuoso de lo establecido en los pliegos o en disposiciones vigentes aplicables, podrá imponer sanciones en la forma y condiciones establecidas en el artículo 192 de la LCSP.

    financial sanctions for breach or defective performance

  18. High

    Clause 20.3.1: Contracting authority may establish additional contract-specific penalties in Annex VIII of the administrative clauses.Commercial

    to impose penalties different from those in the preceding paragraphs, it may establish them in Annex VIII of the specific administrative clauses.p. 37✓

    Spanish original

    imponer unas penalidades distintas a las de los párrafos anteriores, podrá establecerlas en el Anexo VIII del pliego de cláusulas administrativas particulares.

    contract-specific penalties defined in Annex VIII

  19. High

    Clause 20.3.1: Penalties are imposed by resolution of the contracting authority upon the contract manager's report and are immediately enforceable.Legal

    Penalties shall be imposed by decision of the contracting authority, which shall be immediately enforceable, adopted upon proposal of the contract manager, who must issue the corresponding report.p. 37✓

    Spanish original

    Las penalidades se impondrán por acuerdo del órgano de contratación, que será inmediatamente ejecutivo, adoptado a propuesta del responsable del contrato, que deberá emitir el correspondiente informe.

    penalties immediately enforceable by buyer decision

  20. High

    Clause 20.3.2: Delays in service delivery or timed obligations incur a daily penalty proportional to the award amount under Article 193 LCSP.Commercial

    shall result in the imposition of a penalty on the winning company, per day of delay, equivalent to the corresponding proportional part of the award amount.p. 37✓

    Spanish original

    darán lugar a la imposición de una penalización a la empresa adjudicataria, por día de demora, equivalente a la parte proporcional que corresponda del importe de la adjudicación.

    daily delay liquidated damages proportional to award value

  21. High

    Clause 20.3.4: Asepeyo reserves the right to pursue legal remedies if the contractor fails to pay an imposed penalty.Legal

    Asepeyo reserves the right to use the appropriate legal means in the event that the company fails to fulfill its payment obligation.p. 38✓

    Spanish original

    Asepeyo se reserva el derecho a utilizar los medios legales que correspondan en caso de que la empresa incumpla su obligación de pago.

    legal enforcement for unpaid contractual penalties

  22. High

    Clause 24.6: Subcontractor payment reporting and timely payment obligations are essential contract execution conditions whose breach triggers legal consequences.Legal

    These obligations are considered essential conditions in the execution of the contract, and failure to comply with them will result in the consequences provided for by the legal system.p. 40✓

    Spanish original

    Estas obligaciones se consideran condiciones esenciales en la ejecución del contrato, y su incumplimiento dará lugar a las consecuencias previstas por el ordenamiento jurídico.

    breach of essential condition risks contract termination or sanctions

  23. High

    Clause 27.2.f: Breach of the principal obligation of the contract is grounds for termination.Legal

    Breach of the principal obligation of the contract.p. 41✓

    Spanish original

    El incumplimiento de la obligación principal del contrato.

    breach of main obligation triggers termination

  24. High

    Clause 27.2.f: Breach of other essential obligations designated as such in the tender documents triggers termination when statutory requirements are met.Legal

    The breach of the remaining essential obligations shall likewise be grounds for termination of the contract, provided that the latter have been classified as such in the specifications or in the corresponding descriptive document, when both legally established requirements are met.p. 41✓

    Spanish original

    Serán, asimismo causas de resolución del contrato, el incumplimiento de las restantes obligaciones esenciales siempre que estas últimas hubiesen sido calificadas como tales en los pliegos o en el correspondiente documento descriptivo, cuando concurran los dos requisitos establecidos legalmente.

    breach of essential obligations triggers termination

  25. High

    Clause 27.2.g: Impossibility of executing the service under initially agreed terms when modification under Articles 204 and 205 is not possible triggers termination.Legal

    The impossibility of executing the provision under the terms initially agreed upon, when it is not possible to modify the contract pursuant to Articles 204 and 205p. 41✓

    Spanish original

    La imposibilidad de ejecutar la prestación en los términos inicialmente pactados, cuando no sea posible modificar el contrato conforme a los artículos 204 y 205

    contract terminated if performance impossible without modification

  26. Medium

    Contractor must comply with confidentiality, data protection, ASEPEYO's code of conduct, and criminal risk prevention obligations under Clause 17 (details in omitted pages 5-45).Compliance

    17. Confidentiality, data protection, compliance with the code of conduct and prevention of criminal risksp. 2✓

    Spanish original

    17. Confidencialidad, protección de datos, cumplimiento del código de conducta y prevención de riesgos penales

    mandatory data protection, ethics, and criminal compliance obligations

  27. Medium

    Contract assignment and subcontracting are restricted/regulated under Clause 24 (details in omitted pages 5-45).Legal

    24. Assignment of the contract and subcontractingp. 2✓

    Spanish original

    24. Cesión del contrato y subcontratación

    restrictions on subcontracting and assignment of contract

  28. Medium

    Contractor must comply with the mandatory Special Execution Conditions established in Annex VI (details in omitted pages 5-45).Compliance

    Annex VI Special conditions of performancep. 3✓

    Spanish original

    Anexo VI Condiciones especiales de ejecución

    mandatory special contract execution conditions

  29. Medium

    Planned contractual modifications (20% budget margin per lot) are governed by Annex IX (specific triggers/conditions in omitted pages 5-45).Commercial

    Annex IX Foreseen contractual modificationsp. 3✓

    Spanish original

    Anexo IX Modificaciones contractuales previstas

    scope/volume modification provisions up to 20%

  30. Medium

    Planned contract modifications of 20% are reserved across all lots totaling €80,578.75 excl. VAT (€88,776.07 incl. VAT), exposing the supplier to up to 20% scope/volume variations under Annex IX.Commercial

    €80,578.75p. 4

    Spanish original

    80.578,75 €

    20% contract modification reserve affects volume predictability

  31. Medium

    The contract foresees planned modifications up to 20%, valued at €80,578.75 excluding VAT (€88,776.07 including VAT).Commercial

    €80,578.75p. 4

    Spanish original

    80.578,75 €

    contract allows planned scope modifications up to 20%

  32. Medium

    Section 5.2.5: For any subsequent claim, the contractor must present the duly signed order delivery note.Legal

    For any subsequent claim, the successful bidder must present the duly signed order delivery note.p. 9✓

    Spanish original

    Para cualquier reclamación posterior, la empresa adjudicataria deberá presentar el albarán de entrega del pedido debidamente firmada.

    claims barred without presenting duly signed delivery note

  33. Medium

    Bidders must comply with applicable environmental, social, labor, and subcontracting obligations; below-market pricing or prices breaching Article 201 of the LCSP cannot be justified.Compliance

    d) Compliance with applicable obligations regarding environmental, social, or labor matters, and subcontracting, with below-market prices or those that fail to comply with the provisions of Article 201 of the LCSP not being justifiable.p. 11✓

    Spanish original

    d) El respeto de obligaciones que resulten aplicables en materia medioambiental, social o laboral, y de subcontratación, no siendo justificables precios por debajo de mercado o que incumplan lo establecido en el artículo 201 de la LCSP.

    mandatory social/environmental/labor compliance and bar on below-market pricing

  34. Medium

    In addition to the modifications set out in Clause 25 of the PCAP, specific contract modifications are foreseen under Article 204 LCSP.Commercial

    In addition to those provided for in clause 25 of the specific administrative clauses sheet, the following modifications are foreseen:p. 16✓

    Spanish original

    Además de las previstas en la cláusula 25 del pliego de cláusulas administrativas particulares, se prevén las siguientes modificaciones:

    contract subject to foreseen scope modifications per Clause 25

  35. Medium

    Foreseen contract modifications under Article 204 LCSP apply as specified in Annex IX.Commercial

    Yes, they are foreseen (see Annex IX)p. 16✓

    Spanish original

    Sí se prevén (vid. Anexo IX)

    contract subject to foreseen modifications per Annex IX

  36. Medium

    Clause 6.2: Multi-year contract execution is subject to the suspensive condition of adequate and sufficient budgetary credit in future fiscal years.Financial

    In the event that the contract commits subsequent financial years, its execution for said financial years shall be subject to the condition precedent of the existence of adequate and sufficient credit to guarantee the obligations arising from the contract in the corresponding financial year.p. 22✓

    Spanish original

    En caso que el contrato comprometa ejercicios posteriores, la ejecución del mismo para dichos ejercicios quedará sometida a la condición suspensiva de existencia de crédito adecuado y suficiente para garantizar las obligaciones derivadas del contrato en el ejercicio correspondiente.

    future-year performance contingent on budget credit availability

  37. Medium

    Clause 6.3: Advance-processed tender awards are subject to the suspensive condition of adequate and sufficient budgetary credit.Financial

    Likewise, in files processed in advance, the award shall be subject to the condition precedent of the existence of adequate and sufficient credit to guarantee the obligations arising from the contract in the corresponding financial year.p. 22✓

    Spanish original

    Igualmente, en los expedientes que se tramiten anticipadamente, la adjudicación quedará sometida a la condición suspensiva de existencia de crédito adecuado y suficiente para garantizar las obligaciones derivadas del contrato en el ejercicio correspondiente.

    contract award contingent on budgetary credit availability

  38. Medium

    Clause 9: Committed solvency resources may only be replaced for unforeseeable reasons, with equivalent solvency and prior ASEPEYO authorization.Legal

    It may only replace them, due to unforeseeable circumstances, with other means that demonstrate equivalent solvency and with the corresponding authorization from Asepeyo.p. 23✓

    Spanish original

    Sólo podrá sustituirlos, por causas imprevisibles, por otros medios que acrediten solvencia equivalente y con la correspondiente autorización de Asepeyo.

    strict restriction and approval needed to replace committed resources

  39. Medium

    Clause 10.4: Submitting a bid constitutes unconditional acceptance of all tender clauses and conditions without reservation.Legal

    their submission implies unconditional acceptance by the economic operator of the content of all such clauses or conditions, without any reservation or qualification whatsoever.p. 24✓

    Spanish original

    su presentación supone la aceptación incondicionada por el empresario del contenido de la totalidad de dichas cláusulas o condiciones, sin salvedad o reserva alguna.

    unconditional acceptance of all tender terms without reservation

  40. Medium

    The awardee must sign the confidentiality and personal data access agreement or data processor contract, which forms an integral part of the contract.Legal

    the confidentiality and access to personal data agreement or the data processor contract, which shall be signed by the successful tenderer, being considered for all purposes an integral part of the contract.p. 31✓

    Spanish original

    el acuerdo de confidencialidad y acceso a datos de carácter personal o el contrato de encargado de tratamiento, que serán firmados por el adjudicatario, considerándose a todos los efectos parte integrante del contrato.

    binding data processor and confidentiality agreement execution

  41. Medium

    Clause 17.1: Awardee and assigned personnel must maintain professional secrecy over all information, documents, and matters accessed during the contract term.Legal

    The successful bidder and the personnel in charge of carrying out the tasks shall maintain professional secrecy regarding all information, documents, and matters to which they have access or knowledge during the term of the contractp. 33✓

    Spanish original

    La empresa adjudicataria y el personal encargado de la realización de las tareas guardarán secreto profesional sobre todas las informaciones, documentos, y asuntos a los que tengan acceso o conocimiento durante la vigencia del contrato

    standard professional secrecy duty, low risk

  42. Medium

    Clause 17.1: Contractor and personnel must not publish or transfer data learned through contract execution, with the obligation surviving after contract expiry.Legal

    being obliged not to make public or dispose of any data they become aware of as a consequence of or by reason of its execution, even after the end of the contractual term.p. 33✓

    Spanish original

    estando obligados a no hacerlos públicos o enajenar cuantos datos conozcan como consecuencia o con ocasión de su ejecución, incluso después de finalizar el plazo contractual.

    standard post-contractual secrecy obligation, low risk

  43. Medium

    Clause 17.1: If handling personal data files in performing the service, contractor must comply with Spanish Data Protection Law (LOPD, Ley Orgánica 3/2018), EU GDPR (Regulation (EU) 2016/679), and implementing regulations.Compliance

    must comply with the current legislation on the protection of personal data in accordance with the provisions of Organic Law 3/2018, of December 5, on the Protection of Personal Data and guarantee of digital rightsp. 33✓

    Spanish original

    deberá cumplir con la legislación vigente en materia de protección de datos de carácter personal conforme a lo dispuesto en la Ley Orgánica 3/2018, de 5 de diciembre, de Protección de Datos Personales y garantía de los derechos digitales

    statutory data protection compliance, low risk

  44. Medium

    Clause 17.2: Awardee must adhere to Asepeyo's Code of Conduct, strictly comply with ASEPEYO's Criminal Risk Prevention Manual, and refrain from any prohibited conduct therein.Compliance

    The awarded company must adhere to Asepeyo's code of conduct and commit to strict compliance with the Criminal Risk Prevention Manual approved by ASEPEYOp. 33✓

    Spanish original

    La empresa adjudicataria deberá adherirse al código de conducta de Asepeyo y comprometerse al estricto cumplimiento Manual de Prevención de Riesgos Penales aprobado por ASEPEYO

    standard ethics and anti-crime compliance, low risk

  45. Medium

    The awardee must not disclose or transfer data or documents provided by ASEPEYO (or copies), even for storage, to third parties for any non-essential use.Legal

    not to disclose or transfer data, even for their preservation, or documents provided by the Mutua or copies thereof, to third parties, for any other use not provided for as necessary for the performance of the supplyp. 33✓

    Spanish original

    a no revelar o ceder datos, ni aún para su conservación, o documentos proporcionados por la Mutua o copia de los mismos, a terceros, para cualquier otro uso no previsto como necesario para el desempeño del suministro

    strict third-party data transfer and storage restriction

  46. Medium

    If handling personal data under the contract, the awardee must comply with EU Regulation (EU) 2016/679 (GDPR).Compliance

    and Regulation (EU) 2016/679 of the European Parliament and of the Council of 27 April 2016 on the protection of natural persons with regard to the processing of personal datap. 33✓

    Spanish original

    y el Reglamento (EU) 2016/679 del Parlamento Europeo y del Consejo de 27 de abril de 2016 relativo a la protección de las personas físicas en lo que respecta al tratamiento de datos personales

    mandatory statutory GDPR data protection compliance

  47. Medium

    Clause 18.1: Under Article 29 LCSP, contract extension is decided unilaterally by the contracting authority and is mandatory for the contractor without tacit consent.Commercial

    In accordance with art. 29 of the LCSP, the extension of the contract shall be agreed upon by the contracting authority and shall be mandatory for the economic operator, without it being possible to occur through the tacit consent of the parties.p. 35✓

    Spanish original

    De acuerdo con el art. 29 de la LCSP la prórroga del contrato se acordará por el órgano de contratación y será obligatoria para el empresario sin que pueda producirse por el consentimiento tácito de las partes.

    unilateral mandatory contract extension binding contractor

  48. Medium

    Clause 19: Contractor must comply with all special contract execution conditions listed in Annex VI.Compliance

    The contractor must comply with the special conditions of performance listed in Annex VIp. 36✓

    Spanish original

    El contratista deberá cumplir con las condiciones especiales de ejecución que se relacionan en el anexo VI

    mandatory special execution conditions in external annex

  49. Medium

    Clause 24.3 c): Subcontracts differing from the bid (different entities or scope) cannot be concluded until 20 days after submitting notice and justifications unless authorized earlier without objection.Legal

    they may not be entered into until twenty days have elapsed from the time the notification was sent and the justifications referred to in letter a) of this section were provided, unless they had previously been expressly authorizedp. 39✓

    Spanish original

    no podrán celebrarse hasta que transcurran veinte días desde que se hubiese cursado la notificación y aportado las justificaciones a que se refiere la letra a) de este apartado, salvo que con anterioridad hubiesen sido autorizados expresamente

    20-day waiting period and objection risk for un-nominated subcontracts

  50. Medium

    Clause 24.3 c): The 20-day waiting period and authorization regime also apply if subcontractors were identified in the bid only by their professional profile.Legal

    This regime will also apply if the subcontractors were identified in the tender through the description of their professional profile.p. 39✓

    Spanish original

    Este régimen será igualmente aplicable si los subcontratistas hubiesen sido identificados en la oferta mediante la descripción de su perfil profesional.

    20-day approval restriction when using profile-only bid designations

  51. Medium

    Clause 24.4: Under Article 202.4 LCSP, subcontractors are obliged to comply with the special contract execution conditions required in the tender.Compliance

    In accordance with the provisions of Article 202.4 of the LCSP, the subcontractor shall be obliged to comply with the special execution conditions required in these specifications.p. 39✓

    Spanish original

    De conformidad con lo establecido en el artículo 202.4 de la LCSP, el subcontratista estará obligado a cumplir las condiciones especiales de ejecución exigidas en el presente pliego.

    mandatory flow-down of special execution conditions to subcontractors

  52. Medium

    Clause 24.3.c: Unscheduled subcontracts may start before 20 days only if expressly authorized earlier and provided the contracting body has not notified its opposition within that period.Legal

    unless they had previously been expressly authorized, provided that the contracting authority has not notified its opposition thereto within this period.p. 39✓

    Spanish original

    salvo que con anterioridad hubiesen sido autorizados expresamente, siempre que el órgano contratante no hubiese notificado dentro de este plazo su oposición a los mismos.

    contracting authority holds veto over new subcontractors

  53. Medium

    Clause 24.7: Mandatory payment verification and penalties under Article 217 LCSP apply to works and services contracts exceeding EUR 5 million with >= 30% subcontracting.Legal

    The verification actions and the imposition of penalties for breach provided for in Art. 217 of the LCSP will be mandatory for the contracting authority in works contracts and in services contractsp. 40✓

    Spanish original

    Las actuaciones de comprobación y de imposición de penalidades por el incumplimiento previstas en el art. 217 de la LCSP, serán obligatorias para el órgano de contratación, en los contratos de obras y en los contratos de servicios

    statutory penalty regime for subcontractor late payment where applicable

  54. Medium

    Clause 26.2: Contract suspension extends the contract duration by the suspension period only if both parties agree.Commercial

    The suspension of the contract shall only entail the extension of its duration for the period of suspension if both parties so agree.p. 40✓

    Spanish original

    La suspensión del contrato solo conllevará la ampliación de la duración del mismo por el periodo de suspensión, si ambas partes así lo acuerdan.

    no automatic term extension after buyer-ordered suspension

  55. Medium

    Clause 29.1: Parties expressly submit any disputes on interpretation or execution to the Courts of the provincial capital where the tender is held, waiving their own jurisdiction.Legal

    the parties expressly submit to the Courts and Tribunals of the capital of the province where the tender is held, waiving any own jurisdiction that may correspond to either of them.p. 42✓

    Spanish original

    las partes se someten expresamente a los Juzgados y Tribunales de la capital de la provincia en que se celebre la licitación, con renuncia del fuero propio que pueda corresponder a cualquiera de ellas.

    mandatory submission to provincial capital courts waiving own forum

  56. Medium

    Clause 30: Special appeal must be filed at the Contracting Body registry or the Central Administrative Court of Contractual Appeals within 15 working days.Legal

    The appeal must be filed in the registry of the Contracting authority or with the Central Administrative Tribunal of Contractual Appeals within a period of fifteen business days.p. 44✓

    Spanish original

    El recurso deberá interponerse en el registro del Órgano de contratación o en el Tribunal Administrativo Central de Recursos Contractuales en el plazo de quince días hábiles.

    strict 15-working-day appeal deadline

  57. Low

    Contract is governed by the applicable public procurement legal regime specified in Clause 2 (details in omitted pages 5-45).Legal

    2. Legal regime applicable to the procurementp. 2✓

    Spanish original

    2. Régimen jurídico aplicable a la contratación

    routine reference to governing procurement legal regime

  58. Low

    Awarded bidder must execute the formal contract document per Clause 16 (details in omitted pages 5-45).Legal

    16. Contract formalization documentp. 2✓

    Spanish original

    16. Documento de formalización del contrato

    routine contract execution formality

  59. Low

    Contractor is bound by general contractor obligations specified in Clause 19 (details in omitted pages 5-45).Compliance

    19. Obligations of the contractorp. 2✓

    Spanish original

    19. Obligaciones del contratista

    routine general contractor performance obligations

  60. Low

    ASEPEYO retains supervisory and contract control powers as specified in Clause 20 (details in omitted pages 5-45).Legal

    20. Powers of Asepeyop. 2✓

    Spanish original

    20. Facultades de Asepeyo

    routine contracting authority oversight powers

  61. Low

    Conditions for contract suspension are governed by Clause 26 (details in omitted pages 5-45).Legal

    26. Suspension of the contractp. 2✓

    Spanish original

    26. Suspensión del contrato

    standard contract suspension provisions

  62. Low

    Disputes are subject to the jurisdiction designated in Clause 29 (details in omitted pages 5-45).Legal

    29. Jurisdictionp. 2✓

    Spanish original

    29. Jurisdicción

    routine legal jurisdiction clause

  63. Low

    Challenges and administrative appeals against the tender documentation are governed by Clause 30 (details in omitted pages 5-45).Legal

    30.- Regime of appeals against the documentation governing the procurementp. 2✓

    Spanish original

    30.- Régimen de recursos contra la documentación que rige la contratación

    routine tender challenge and appeals procedure

  64. Low

    Initial contract duration is 1 year from the stipulated date, with two optional 12-month annual extensions.Commercial

    The duration of the contract shall be one (1) year from the date stipulated therein, with the possibility of two (2) extensions of one annual period (12 months) eachp. 3✓

    Spanish original

    La duración del contrato será de un (1) año desde la fecha que se estipule en el mismo, con posibilidad de dos (2) prórrogas de una anualidad (12 meses) cada una

    standard contract duration and extension terms

  65. Low

    An independently executable third extension applies depending on planned start date (12 months for Lots 1, 2, 3, 5, 8 starting 1/4/2027; 6 months for Lots 4, 6, 7, 9, 10, 11 starting 1/10/2027).Commercial

    a third extension whose duration will depend on the scheduled contract start date - as can be seen in the following table -, executable independently:p. 3✓

    Spanish original

    una tercera prórroga cuya duración va a depender de la fecha de inicio del contrato prevista - según puede verse en el siguiente cuadro -, ejecutables independientemente:

    standard variable extension structure

  66. Low

    The contract includes three extensions: two 12-month annual extensions and a third extension whose duration depends on the planned contract start date (Section G.3).Commercial

    Duration: two (2) extensions of one year (12 months) each and a third extension whose duration will depend on the scheduled contract start datep. 13✓

    Spanish original

    Duración: dos (2) prórrogas de una anualidad (12 meses) cada una y una tercera prórroga cuya duración va a depender de la fecha de inicio del contrato prevista

    routine contract extension structure

  67. Low

    Payment terms and methods are governed by Section 6 (Invoicing and Payment Conditions) of the Technical Specifications (PPT) (Section H.2).Commercial

    Others: See Section "6.- INVOICING AND PAYMENT CONDITIONS" of the PPT.p. 13✓

    Spanish original

    Otros: Ver Apartado “6.- FACTURACIÓN Y CONDICIONES DE PAGO” del PPT.

    cross-reference to payment terms

  68. Low

    Payments shall be made by bank transfer against presentation of the invoice or invoices (Section H.2).Financial

    Payments will be made by bank transfer upon submission of the invoice or invoices.p. 13✓

    Spanish original

    Los pagos se realizarán por transferencia bancaria contra presentación de la factura o facturas.

    standard bank transfer payment method

  69. Low

    Subcontracting is permitted within the limits established by the LCSP.Legal

    Subcontracting is permitted within the limits established by the LCSP.p. 16✓

    Spanish original

    Se permite la subcontratación con los límites que establece la LCSP.

    routine statutory subcontracting permission

  70. Low

    Special conditions of contract execution apply as described in Annex VI.Compliance

    Described in Annex VI.p. 19✓

    Spanish original

    Descritas en Anexo VI.

    cross-reference to special execution conditions in Annex VI

  71. Low

    The contract is classified as a supply contract under Article 16 LCSP and holds the status of a private contract under Article 26 LCSP.Legal

    The contract to which this document refers is classified as a supply contract, in accordance with the provisions of Article 16 of the LCSP, and has the status of a private contractp. 20✓

    Spanish original

    El contrato al que se refiere el presente pliego se califica como contrato de suministro, de conformidad con lo establecido en el artículo 16 de la LCSP, y tiene la condición de contrato privado

    routine statutory contract classification

  72. Low

    Contract preparation and award are governed by the LCSP and its implementing regulations, with administrative or private law applying supplementarily.Legal

    with regard to its preparation and award, it shall be governed by the LCSP and its implementing provisions,p. 20✓

    Spanish original

    en lo que se refiere a su preparación y adjudicación, se regirá por la LCSP y sus disposiciones de desarrollo,

    routine statutory governing law for tender phase

  73. Low

    The effects and termination of the contract are governed by private law.Legal

    As for their effects and termination, these shall be governed by private law.p. 20✓

    Spanish original

    En cuanto a sus efectos y extinción, éstos se regirán por el derecho privado.

    routine private law regime for contract execution and termination

  74. Low

    Rules in Title I of Book II of the LCSP regarding contract modifications apply to this contract.Legal

    Nevertheless, the rules contained in Title I of Book II on contract modification shall apply to these contracts.p. 20✓

    Spanish original

    No obstante, serán de aplicación a estos contratos las normas contenidas en el Título I del Libro II, sobre modificación de los contratos.

    routine statutory application of modification rules

  75. Low

    Clause 2.2: Technical specifications, formal contract, PCAP, and annexes are mandatory contractual documents.Legal

    The following documents are mandatory and of a contractual nature: the technical specifications document and its annexes, the document itself in which the contract is formalised, these specific administrative clauses and their annexesp. 21✓

    Spanish original

    Obligatoriamente tienen carácter contractual los siguientes documentos: el pliego de prescripciones técnicas y sus anexos, el propio documento en el que se formalice el contrato, el presente pliego de cláusulas administrativas particulares y sus anexos

    routine contractual hierarchy term, low risk

  76. Low

    Clause 2.2: Any accepted bidder improvements are incorporated as a binding annex to the contract.Legal

    any improvements that may be submitted, where applicable, which shall be incorporated as an annex theretop. 21✓

    Spanish original

    las mejoras que puedan presentarse, en su caso, que serán incorporadas como anexo al mismo

    standard contractual incorporation of offered improvements

  77. Low

    Clause 2.2: Confidentiality and personal data access agreement or data processor contract is contractually binding where applicable.Compliance

    as well as the confidentiality and access to personal data agreement or the data processor contract, where applicable.p. 21✓

    Spanish original

    así como el acuerdo de confidencialidad y acceso a datos de carácter personal o el contrato de encargado de tratamiento, en su caso.

    standard data protection and confidentiality clause

  78. Low

    Clause 2.3: Contractor must comply with current labor and tax legislation for personnel employed in contract execution.Compliance

    The contractor is obliged, with respect to the personnel employed in the execution of the contract, to comply with the provisions in force, especially in matters of labour and tax legislationp. 21✓

    Spanish original

    El empresario queda obligado, con respecto al personal que emplee en la ejecución del contrato, al cumplimiento de las disposiciones vigentes, especialmente en materia de legislación laboral y fiscal

    routine statutory labor and tax compliance

  79. Low

    Clause 2.3: Contractor must comply with new labor and tax regulations enacted during contract execution.Compliance

    and compliance with those that may be enacted during the execution thereof.p. 21✓

    Spanish original

    el cumplimiento de las que puedan promulgarse durante la ejecución del mismo.

    standard obligation to follow laws enacted mid-contract

  80. Low

    Clause 3.1: Estimated contract value includes possible extensions under Section G and modifications under Annex IX.Commercial

    Said estimated value shall include, where anticipated, the possible extensions indicated in section G of the schedule of characteristics and the possible contractual modifications provided for in Annex IXp. 21✓

    Spanish original

    Dicho valor estimado incluirá, en el supuesto de que se prevean, las posibles prórrogas señaladas en el apartado G del cuadro de características y las posibles modificaciones contractuales previstas en el Anexo IX

    standard contract scope for extensions and modifications

  81. Low

    A tender cannot be declared void if at least one proposal is admissible under the tender criteria.Legal

    A tender cannot be declared void when there is any offer or proposal that is admissible in accordance with the criteria set out in the specifications.p. 30✓

    Spanish original

    No podrá declararse desierta una licitación cuando exista alguna oferta o proposición que sea admisible de acuerdo con los criterios que figuren en el pliego.

    protective procedural award rule, low risk

  82. Low

    If the contract is not awarded within the specified deadlines, bidders are entitled to withdraw their proposal and recover any provisional guarantee.Financial

    If the award is not made within the indicated deadlines, tenderers shall be entitled to withdraw their tender and to the return of the provisional guarantee, if any.p. 31✓

    Spanish original

    De no producirse la adjudicación dentro de los plazos señalados, los licitadores tendrán derecho a retirar su proposición y a la devolución de la garantía provisional, de existir.

    bidder withdrawal right on delayed award, low risk

  83. Low

    The contract is perfected upon formalization under Art. 36.1 LCSP after award notification/publication and proof that the definitive guarantee has been constituted.Legal

    The contract is perfected upon its formalization, in accordance with article 36.1 of the LCSP, once the award of the contract has been notified and published, prior proof that the definitive guarantee has been constituted.p. 31✓

    Spanish original

    El contrato se perfecciona con la formalización del mismo, conforme al artículo 36.1 de la LCSP, una vez notificada y publicada la adjudicación del contrato, previa justificación de haber quedado constituida la garantía definitiva.

    routine contract perfection procedure, low risk

  84. Low

    Copies of this PCAP, the Technical Specifications (PPT), and any authorized improvements must be annexed to the formalized contract.Legal

    To the contract that is formalized, there shall be attached, at least, as an annex: a copy of these specifications; a copy of the technical specifications; and the improvements that, where applicable, have been authorizedp. 31✓

    Spanish original

    Al contrato que se formalice se unirán, al menos, como anexo: un ejemplar del presente pliego; un ejemplar del pliego de prescripciones técnicas; y de las mejoras que, en su caso, se hayan autorizado

    routine contract annexation requirement, low risk

  85. Low

    Contract formalization cannot take place before 15 working days have elapsed since award notification to bidders and candidates.Legal

    The formalization of the contract may not take place before 15 business days have elapsed from the notification of the award to the bidders and candidates.p. 32✓

    Spanish original

    La formalización del contrato no podrá efectuarse antes de que transcurran 15 días hábiles desde la notificación de adjudicación a los licitadores y candidatos.

    routine statutory standstill period, low risk

  86. Low

    Confidentiality does not prevent disclosure of non-confidential contract parts, contractors and subcontractors, and essential parts of the offer.Legal

    nor may it prevent the disclosure of non-confidential parts of the concluded contracts, the companies with which contracts and subcontracts have been entered into, and in any case, the essential parts of the tenderp. 32✓

    Spanish original

    tampoco podrá impedir la divulgación de partes no confidenciales de los contratos celebrados, las empresas con las que se ha contratado y subcontratado y en todo caso, las partes esenciales de la oferta

    routine public contract transparency rule, low risk

  87. Low

    Clause 17.1: Contractor must respect the confidentiality of information accessed during contract execution designated as confidential or confidential by nature.Legal

    The contractor must respect the confidential nature of that information to which it has access by reason of the execution of the contractp. 33✓

    Spanish original

    El contratista deberá respetar el carácter confidencial de aquella información a la que tenga acceso con ocasión de la ejecución del contrato

    routine confidentiality obligation, low risk

  88. Low

    Clause 17.1: Awardee must maintain strict confidentiality and not disclose or transfer Mutua-provided data, documents, or copies (including personal data) to third parties for unapproved purposes.Legal

    The successful bidder undertakes to maintain strict confidentiality and not to disclose or transfer data, even for their conservation, or documents provided by the Mutua or copies thereof, to third partiesp. 33✓

    Spanish original

    El adjudicatario se compromete a mantener estricta confidencialidad y a no revelar o ceder datos, ni aún para su conservación, o documentos proporcionados por la Mutua o copia de los mismos, a terceros

    standard third-party non-disclosure clause, low risk

  89. Low

    Clause 17.1: Awardee (natural or legal person) must sign the confidentiality and data protection documents annexed to the tender.Compliance

    The successful bidder, whether an individual or a legal entity, must sign the documents regarding confidentiality and data protection that are annexed to these specifications.p. 33✓

    Spanish original

    La empresa adjudicataria, se trate de persona física o jurídica, deberá suscribir los documentos que en materia de confidencialidad y protección de datos se anexan al presente pliego.

    routine contractual form execution, low risk

  90. Low

    Clause 18.1: Contract duration may be extended before expiry if foreseen in Section G, provided contract terms remain unchanged and competition considered maximum duration.Commercial

    The duration of the contract may be extended, if so provided in section G of the characteristics table, before the execution period ends and provided that its characteristics remain unaltered during the extension periodp. 35✓

    Spanish original

    La duración del contrato podrá prorrogarse, si así se prevé en el apartado G del cuadro de características, antes que finalice el plazo de ejecución y siempre que sus características permanezcan inalterables durante el periodo de la prórroga

    conditional contract extension framework, low risk

  91. Low

    Clause 19: Contractor must comply with all applicable labor, social security, and occupational risk prevention regulations.Compliance

    The contractor is obliged to comply with the current provisions regarding labor, social security and occupational risk prevention matters.p. 36✓

    Spanish original

    El contratista está obligado al cumplimiento de las disposiciones vigentes en materia laboral, de seguridad social y prevención de riesgos laborales.

    statutory labor and safety compliance, low risk

  92. Low

    Clause 19: Contractor must keep confidential any non-public or non-notorious data or background related to the contract acquired during execution.Legal

    The contractor shall be obliged to maintain secrecy with respect to any data or background information that, not being public or well-known, are related to the subject matter of the contract, and of which it becomes aware on the occasion thereof.p. 36✓

    Spanish original

    El contratista tendrá la obligación de guardar sigilo respecto a los datos o antecedentes que, no siendo públicos o notorios, estén relacionados con el objeto del contrato, de los que tenga conocimiento con ocasión del mismo.

    routine confidentiality obligation, low risk

  93. Low

    Clause 20.2: If contractor or dependent personnel commit acts or omissions perturbing performance, contracting authority may demand specific corrective measures.Legal

    the contracting authority may require the adoption of specific measures to achieve or restore good order in the performance of what has been agreed.p. 37✓

    Spanish original

    el órgano de contratación podrá exigir la adopción de medidas concretas para conseguir o restablecer el buen orden en la ejecución de lo pactado.

    standard contract supervision authority, low risk

  94. Low

    Clause 24.1: Contract assignment to a third party is only allowed if the assignor's technical or personal qualities were not a determining factor for the award.Legal

    The rights and obligations of the contract may be assigned by the contractor to a third party provided that the technical or personal qualities of the assignor were not the determining reason for its awardp. 38✓

    Spanish original

    Los derechos y obligaciones del contrato podrán ser cedidos por el contratista a un tercero siempre que las cualidades técnicas o personales del cedente no hayan sido razón determinante para su adjudicación

    standard contract assignment condition, low risk

  95. Low

    Clause 24.1: Any contract assignment requires the assignee to meet initial solvency criteria and receive prior express authorization from the Mutua.Legal

    that the assignee meets the solvency requirements initially required for the provision of the contract and that the contracting Mutua expressly authorizes it in advance.p. 38✓

    Spanish original

    que el cesionario cumpla con los requisitos de solvencia inicialmente requeridos para la prestación del contrato y que la Mutua contratante lo autorice expresamente y con carácter previo.

    routine buyer consent and solvency rule for assignment, low risk

  96. Low

    Clause 24.2: Contractor may subcontract partial supply performance to third parties subject to the tender terms and Articles 215 to 217 LCSP.Legal

    The contractor may arrange with third parties for the partial performance of the supply subject to what is provided for in these specifications and in compliance with the provisions of Articles 215 to 217 of the LCSP.p. 39✓

    Spanish original

    El contratista podrá concertar con terceros la realización parcial del suministro con sujeción a lo que disponga el presente pliego y con sometimiento a lo establecido en los artículos 215 a 217 de la LCSP.

    optional subcontracting permission under LCSP, low risk

  97. Low

    Clause 25.1: Contract modifications are governed by the rules contained in Articles 203 to 207 LCSP.Legal

    The rules contained in Articles 203 to 207 regarding contract modification shall apply to this contractp. 40✓

    Spanish original

    Serán de aplicación al presente contrato las normas contenidas en los artículos 203 a 207 sobre modificación de los contratos

    standard statutory contract modification rules, low risk

  98. Low

    Clause 25.2: Post-award, contracting authority may only introduce foreseen modifications under Article 204 LCSP specified in Annex IX of the tender.Legal

    Once the contract has been executed, the contracting authority may only introduce those modifications that, pursuant to Art. 204 LCSP, are provided for in Annex IX of these specifications.p. 40✓

    Spanish original

    Una vez perfeccionado el contrato, el órgano de contratación sólo podrá introducir aquellas modificaciones que, de acuerdo con el art. 204 LCSP, estén previstas en el Anexo IX del presente pliego.

    standard foreseen modification limit, low risk

  99. Low

    Clause 25.2: Foreseen contract modifications must be formalized through an agreement signed by the Contracting Authority.Compliance

    Said modifications shall be formalized by means of an agreement signed by the Contracting Authority.p. 40✓

    Spanish original

    Dichas modificaciones se formalizarán mediante un acuerdo firmado por el Órgano de Contratación.

    routine formalization procedure, low risk

  100. Low

    Clause 25.3: Modifications not foreseen in the tender are governed by Article 205 LCSP.Legal

    In those cases in which the modification is not provided for in these Specifications, it shall be governed by the provisions of Art. 205 of the LCSP.p. 40✓

    Spanish original

    En aquellos supuestos en los que la modificación no se encuentre prevista en el presente Pliego, se regirá por lo establecido en el art. 205 de la LCSP.

    statutory rule for unforeseen modifications, low risk

  101. Low

    Clause 25.4: Unforeseen contract modifications must be formalized via a contract addendum signed by both parties after Contracting Authority approval.Legal

    Unforeseen modifications of the contract must be formalized by means of an annex document to the contract, which must be signed by the parties following approval by the Contracting Authority.p. 40✓

    Spanish original

    Las modificaciones no previstas del contrato deberán formalizarse mediante documento anexo al contrato que deberá ser firmado por las partes previa aprobación por el Órgano de Contratación.

    routine contract addendum formalization, low risk

  102. Low

    Clause 26.1: If the Mutua orders contract suspension, minutes recording the reasons and factual execution status must be drawn up.Legal

    If the Mutua decides to suspend the contract, minutes shall be drawn up recording the circumstances that motivated it and the factual situation in the execution thereof.p. 40✓

    Spanish original

    Si la Mutua acordase la suspensión del contrato, se levantará un acta en la que se consignarán las circunstancias que la han motivado y la situación de hecho en la ejecución de aquél.

    routine suspension documentation requirement, low risk

  103. Low

    Clause 27.1: The contract terminates upon fulfillment or by formal Resolution.Legal

    The contract shall terminate by its fulfillment or by termination.p. 41✓

    Spanish original

    El contrato se extinguirá por su cumplimiento o por Resolución.

    standard contract expiry clause

  104. Low

    Clause 27.2.a: Death or supervening incapacity of an individual contractor or extinction of corporate personality triggers termination, subject to Article 98 succession rules.Legal

    The death or supervening incapacity of the individual contractor or the extinction of the legal personality of the contracting company, without prejudice to the provisions of Article 98 regarding the succession of the contractor.p. 41✓

    Spanish original

    La muerte o incapacidad sobrevenida del contratista individual o la extinción de la personalidad jurídica de la sociedad contratista, sin perjuicio de lo previsto en el artículo 98 relativo a la sucesión del contratista.

    standard legal personality termination event

  105. Low

    Clause 27.2.c: Mutual agreement between Asepeyo and the contractor is a cause for contract termination.Legal

    Mutual agreement between Asepeyo and the contractor.p. 41✓

    Spanish original

    El mutuo acuerdo entre Asepeyo y el contratista.

    routine mutual termination option

  106. Low

    Clause 27.2.h: Grounds for termination specifically indicated for each contract category in the LCSP also apply.Legal

    Those specifically designated for each category of contract in this Law.p. 41✓

    Spanish original

    Las que se señalen específicamente para cada categoría de contrato en esta Ley.

    standard statutory termination incorporation

  107. Low

    Clause 27.3: Upon termination by mutual agreement, parties' rights are governed by validly stipulated private law provisions.Legal

    When the termination is due to mutual agreement, the rights of the parties shall conform to what has been validly stipulated in the rules of private law.p. 42✓

    Spanish original

    Cuando la resolución obedezca a mutuo acuerdo, los derechos de las partes se acomodará a lo válidamente estipulado en las normas de derecho privado.

    standard private law governance for mutual termination

  108. Low

    Clause 27.3: Mutual agreement termination may occur only if no other termination cause attributable to the contractor or the Mutua exists.Legal

    Termination by mutual agreement may only take place when no other ground for termination attributable to the contractor or to the Mutua concurs.p. 42✓

    Spanish original

    La resolución por mutuo acuerdo sólo podrá tener lugar cuando no concurra otra causa de resolución imputable al contratista o a la Mutua.

    standard limitation on mutual termination

  109. Low

    Clause 29.2: Civil jurisdiction is competent to resolve disputes relating to the effects, performance, and termination of the contract.Legal

    The civil jurisdictional order shall be competent to resolve disputes arising between the parties in relation to the effects, compliance, and termination of this contract.p. 42✓

    Spanish original

    El orden jurisdiccional civil será el competente para resolver las controversias que surjan entre las partes en relación con los efectos, cumplimiento y extinción del presente contrato.

    standard statutory civil court allocation

  110. Low

    Clause 29.2: Contentious-administrative jurisdiction governs matters arising from contract preparation, award, and modification.Legal

    The contentious-administrative jurisdictional order shall be responsible for hearing matters raised in relation to preparation, award, and modification.p. 42✓

    Spanish original

    Corresponderá al orden jurisdiccional contencioso-administrativo el conocimiento de las cuestiones que se susciten en relación con la preparación, adjudicación y modificación.

    standard statutory administrative court allocation

  111. Low

    Clause 29.2: Contentious-administrative jurisdiction hears appeals against resolutions issued by appeal bodies under Article 45 LCSP.Legal

    The contentious-administrative jurisdictional order shall hear appeals filed against resolutions issued by the appeal resolution bodies provided for in Article 45 of the LCSP.p. 43✓

    Spanish original

    El orden jurisdiccional contencioso – administrativo conocerá de los recursos interpuestos contra las resoluciones que se dicten por los órganos de resolución de recursos previstos en el artículo 45 de la LCSP.

    standard judicial review rule for procurement appeals

  112. Low

    Clause 30: Administrative and technical specifications may optionally be challenged via the special procurement appeal under Article 44 LCSP.Legal

    This Specification and the technical specifications may be appealed optionally by means of the special appeal of Article 44 LCSP.p. 44✓

    Spanish original

    El presente Pliego y el de prescripciones técnicas podrán ser recurridos potestativamente mediante el recurso especial del artículo 44 LCSP.

    optional statutory appeal right

  113. Low

    Clause 30: Tender notices, specifications, and contractual documents establishing bidding conditions are subject to special appeal under Article 44.2 LCSP.Legal

    The tender announcements, the specifications, and the contractual documents that establish the conditions that must govern the procurement.p. 44✓

    Spanish original

    Los anuncios de licitación, los pliegos y los documentos contractuales que establezcan las condiciones que deban regir la contratación.

    lists appealable tender documents

  114. Low

    Clause 30: Procedural acts deciding directly/indirectly on award, preventing continuation, or causing defenselessness or irreparable harm are appealable.Legal

    The procedural steps taken in the award procedure, provided that they decide directly or indirectly on the award, determine the impossibility of continuing the procedure, or cause defencelessness or irreparable damage to legitimate rights or interests.p. 44✓

    Spanish original

    Los actos de trámite adoptados en el procedimiento de adjudicación, siempre que estos decidan directa o indirectamente sobre la adjudicación, determinen la imposibilidad de continuar el procedimiento o produzcan indefensión o perjuicio irreparable a derechos o intereses legítimos.

    lists appealable procedural decisions

  115. Low

    Clause 30: Admission or exclusion decisions, including exclusion of abnormally low bids under Article 149 LCSP, are subject to special appeal.Legal

    the admission or rejection of tenders, including tenders that are rejected for being abnormally low as a result of the application of Article 149.p. 44✓

    Spanish original

    la admisión o exclusión de ofertas, incluidas las ofertas que sean excluidas por resultar anormalmente bajas como consecuencia de la aplicación del artículo 149.

    clarifies appealability of abnormally low bid exclusions

  116. Low

    Clause 30: Contract award decisions are subject to the special procurement appeal.Legal

    Award decisions.p. 44✓

    Spanish original

    Los acuerdos de adjudicación.

    lists appealable award decisions

  117. Low

    Clause 30: Modifications breaching Articles 204 and 205 LCSP that should have triggered a new tender are subject to special appeal.Legal

    Modifications based on non-compliance with the provisions of Articles 204 and 205 of this Law, on the grounds that the modification should have been the subject of a new award.p. 44✓

    Spanish original

    Las modificaciones basadas en el incumplimiento de lo establecido en los artículos 204 y 205 de la presente Ley, por entender que la modificación debió ser objeto de una nueva adjudicación.

    lists appealable unlawful contract modifications

  118. Low

    Clause 30: Statutory note stating Article 44.1 LCSP appealable acts apply to services contracts with an estimated value exceeding 100,000 EUR.Legal

    Said acts and decisions must refer to service contracts whose estimated value exceeds one hundred thousand euros, pursuant to the provisions of Article 44.1 of the LCSP.p. 44✓

    Spanish original

    Dichos actos y decisiones deben ir referidos a los contratos de servicios cuyo valor estimado supere los cien mil euros, según lo establecido en el artículo 44.1 de la LCSP.

    statutory value threshold for special appeal

  119. Low

    Appeal deadline calculation against procedural acts in the award procedure or acts resulting from a negotiated procedure without publicity.Legal

    award procedure or against an act resulting from the application of the negotiated procedure without prior publication, the calculation shall commence from the day following that on which knowledge of the possible infringement was acquired.p. 45✓

    Spanish original

    procedimiento de adjudicación o contra un acto resultante de la aplicación del procedimiento negociado sin publicidad, el cómputo se iniciará a partir del día siguiente a aquel en que se haya tenido conocimiento de la posible infracción.

    standard statutory appeal computation rule, low risk

  120. Low

    Appeal deadline calculation for contract modifications allegedly violating Articles 204 and 205 LCSP.Legal

    Articles 204 and 205 of the LCSP, on the grounds that the modification should have been subject to a new award, from the day following that on which it was published on the Contracting Party Profile.p. 45✓

    Spanish original

    artículos 204 y 205 de la LCSP, por entender que la modificación debió ser objeto de una nueva adjudicación, desde el día siguiente a aquel en que se haya publicado en el Perfil de contratante.

    standard statutory appeal computation rule, low risk

Administrative119 rows · 14 high

  1. High

    Bidders must submit an offer for all elements comprising the lot or lots they bid on.Compliance

    Bidding companies must submit a tender for all the items comprising the lot or lots for which they tender.p. 3✓

    Spanish original

    Las empresas licitadoras deberán presentar oferta para todos los elementos que compongan el lote o los lotes que oferten.

    incomplete lot bid causes exclusion

  2. High

    If a product in a lot is obsolete and cannot be offered, the bidder must justify it via a responsible declaration confirming no similar substitute exists on the market.Compliance

    In the event that a product comprising the lot has become obsolete and cannot be offered, it must be adequately justified by means of a statement of compliance, indicating that there is no similar product on the market to replace it.p. 4✓

    Spanish original

    En caso que un producto que componga el lote haya quedado obsoleto y no se pueda ofertar, se deberá justificar adecuadamente mediante una declaración responsable, indicando que no existe en el mercado un producto similar que lo sustituya.

    requires formal declaration to avoid lot exclusion

  3. High

    Bids must be submitted in searchable original PDF format (not scanned), except bidder-completed forms which must be submitted in Excel format.Administrative

    Tenders must be submitted in original searchable pdf format (not scanned documents), except for documents to be completed by the bidder, which must be submitted in excel format.p. 5✓

    Spanish original

    Las ofertas deberán presentarse en formato pdf original (no documentos escaneados) que permita la búsqueda, excepto los documentos a cumplimentar por el licitador, que deberán presentarse en formato excel.

    strict electronic format requirement (no scanned PDFs)

  4. High

    Bidders are not required to submit original documents under Article 28 LPACAP unless exceptionally required by applicable regulations.Compliance

    tenderers shall not be required to submit original documents, unless, exceptionally, the applicable regulatory framework establishes otherwise,p. 18✓

    Spanish original

    no se exigirá a los licitadores la presentación de documentos originales, salvo que, con carácter excepcional, la normativa reguladora aplicable establezca lo contrario,

    routine exemption from submitting originals

  5. High

    Clause 10.1: Submitting more than one proposal (outside permitted variants/improvements) causes non-admission of all bids signed by the bidder.Compliance

    The violation of this rule shall result in the non-admission of all proposals signed by the bidder.p. 24✓

    Spanish original

    La infracción de esta norma dará lugar a la no admisión de todas las propuestas suscritas por el licitador o licitadora.

    strict single-proposal rule causing rejection of all bids

  6. High

    Clause 10.2: Offers submitted after the deadline are automatically excluded from the tender.Compliance

    Those offers submitted after the deadline shall be automatically excluded from the tender.p. 24✓

    Spanish original

    Aquellas ofertas presentadas fuera de plazo quedarán automáticamente excluidas de la licitación.

    firm submission deadline with automatic exclusion

  7. High

    Clause 11.1: Bids must be submitted in two closed envelopes numbered 1 and 2 when only formula-based criteria apply.Compliance

    Proposals shall be submitted in TWO sealed envelopes, according to the content specified in clause 12 of this specification, marked with numbers 1 and 2, in the event that only criteria subject to formulas are included.p. 24✓

    Spanish original

    Las proposiciones se presentarán en DOS sobres cerrados, según el contenido especificado en la cláusula 12 del presente pliego, señalados con los números 1 y 2, en caso que se incluyan únicamente criterios sometidos a fórmula.

    routine two-envelope submission structure

  8. High

    Clause 11.3: Both envelopes and Annex II identification data must be submitted electronically to the address in Section Q.Compliance

    The submission of the two envelopes and the Identifying Data of the company participating in the tender (Annex II) shall be carried out using electronic means at the electronic address indicated in section Q of the characteristics tablep. 25✓

    Spanish original

    La presentación de los dos sobres y los Datos identificativos de la empresa participante en la licitación (Anexo II) se llevará a cabo utilizando medios electrónico en la dirección electrónica indicada en el apartado Q del cuadro de características

    routine electronic submission channel requirement

  9. High

    Clause 11.3: Electronic submissions must be addressed to the Chair of the Contracting Board.Compliance

    addressed to the Presidency of the Contracting Board,p. 25✓

    Spanish original

    dirigidos a la Presidencia de la Mesa de Contratación,

    routine submission addressing instruction

  10. High

    Clause 11.3: Failing to transmit the full offer within 24 hours after the electronic fingerprint causes the bid to be deemed withdrawn.Compliance

    If this second transmission is not carried out within the indicated period, the offer shall be considered to have been withdrawn.p. 25✓

    Spanish original

    De no efectuarse esta segunda remisión en el plazo indicado, se considerará que la oferta ha sido retirada.

    strict 24-hour completion window or bid deemed withdrawn

  11. High

    Clause 12: Bids with omissions, errors, or cross-outs preventing clear understanding of essential points will not be accepted.Compliance

    Those proposals that contain omissions, errors, or erasures that prevent clear understanding of what is deemed fundamental to evaluate the offer shall not be accepted.p. 25✓

    Spanish original

    No se aceptarán aquellas proposiciones que tengan omisiones, errores o tachaduras que impidan conocer claramente lo que se estime fundamental para considerar la oferta.

    rejection risk for unclear omissions, errors, or cross-outs

  12. High

    Clause 13.1: Material defects in Envelope 1 must be cured within 3 business days of certified email notice, under penalty of definitive exclusion.Compliance

    shall communicate this by certified email to the tenderer, so that within a period not exceeding three working days it may correct the error, under warning of definitive exclusion of the tenderer that does not correct the corresponding defects within the granted period.p. 27✓

    Spanish original

    lo comunicará mediante correo electrónico certificado al licitador, para que en un plazo no superior a tres días hábiles subsane el error, bajo apercibimiento de exclusión definitiva del licitador que en el plazo concedido no subsane los defectos correspondientes.

    definitive exclusion if defects uncured within 3 business days

  13. High

    Clause 13.2: Rejected bids are excluded from award and their Envelope 2 files will not be opened.Compliance

    Offers corresponding to rejected proposals will be excluded from the contract award procedure and the envelopes containing them may not be opened.p. 28✓

    Spanish original

    Las ofertas que correspondan a proposiciones rechazadas quedarán excluidas del procedimiento de adjudicación del contrato y los sobres que las contengan no podrán ser abiertos.

    routine procedural rule for rejected proposals

  14. High

    Clause 13.3: Proposals inconsistent with admitted documentation, exceeding base budget, or substantially altering the model will be rejected.Compliance

    If any proposal were not in accordance with the examined and admitted documentation, exceeded the base tender budget, substantially varied the established template,p. 28✓

    Spanish original

    Si alguna proposición no guardase concordancia con la documentación examinada y admitida, excediese del presupuesto base de licitación, variara sustancialmente el modelo establecido,

    rejection risk for inconsistency, budget breach, or template alteration

  15. Medium

    Bids will be evaluated and scored according to the award criteria in Annex XI (weightings and scoring in omitted pages 5-45).Commercial

    Annex XI Award criteriap. 3✓

    Spanish original

    Anexo XI Criterios de adjudicación

    weighted/scored tender evaluation criteria

  16. Medium

    Requested samples must be labeled with the bidder's company name, the corresponding lot, and the specific product.Administrative

    They must be identified with the name of the bidding company, the lot to which it belongs, and the corresponding product.p. 6✓

    Spanish original

    Deberán venir identificadas con el nombre de la empresa licitadora, el lote al que pertenece y el producto correspondiente.

    standard sample labeling requirement

  17. Medium

    The contract is subject to harmonized EU regulation (SARA) and awarded to the bid offering the best quality-price ratio under multiple award criteria.Commercial

    Contract subject to harmonized regulation and awarded to the tender with the best price-quality ratio subject to multiple award criteria.p. 11✓

    Spanish original

    Contrato sujeto a regulación armonizada y adjudicado a la oferta con la mejor relación calidad precio sometida a varios criterios de adjudicación.

    weighted multi-criteria quality-price evaluation

  18. Medium

    The contractor must state on each invoice or certificate the contract reference number provided by ASEPEYO once signed and registered in its database (Section H.2).Administrative

    the successful bidder must indicate on the corresponding invoice or certification the contract reference number that ASEPEYO will provide to the successful bidding company once it has been signed and registered in its database.p. 14✓

    Spanish original

    el adjudicatario deberá indicar en la factura o certificación correspondiente el número de referencia del contrato que ASEPEYO facilitará a la empresa adjudicataria una vez firmado y registrado el mismo en su base de datos.

    routine invoicing reference requirement

  19. Medium

    Additional information will only be provided if bidders request it at least 12 days prior to the deadline for submitting bids or requests to participate.Compliance

    provided that they have requested it at least 12 days before the expiry of the deadline for the submission of tenders or requests to participate.p. 17✓

    Spanish original

    a condición de que la hubieren pedido al menos 12 días antes del transcurso del plazo de presentación de las proposiciones o de las solicitudes de participación.

    firm clarification request deadline 12 days prior to submission

  20. Medium

    Electronic notifications are deemed rejected with the legal effects of Article 43.2 of Law 39/2015 if 10 calendar days pass after availability without accessing their content.Legal

    The period to consider the electronic notification rejected with the effects provided for in Article 43.2 of Law 39/2015, shall be ten calendar days from the making available of the notificationp. 19✓

    Spanish original

    El plazo para considerar rechazada la notificación electrónica con los efectos previstos en el artículo 43.2 de la Ley 39/2015, será de diez días naturales desde la puesta en marcha a disposición de la notificación

    deemed legal rejection after 10 calendar days unaccessed

  21. Medium

    The contract is tendered under an open, harmonized (SARA) procedure and awarded to the offer presenting the best quality-price ratio per Annex XI criteria.Commercial

    its procurement is announced, through the open procedure, subject to harmonised regulation, whose award method shall be by means of the tender presenting the best price-quality ratio based on the award criteria indicated in Annex XIp. 20✓

    Spanish original

    se convoca su contratación, por el procedimiento abierto, sujeto a regulación armonizada, cuya forma de adjudicación será mediante la oferta que presente la mejor relación calidad precio en base a los criterios de adjudicación señalados en el Anexo XI

    weighted/scored award criteria per Annex XI

  22. Medium

    Clause 8: Award will follow Section D procedure and award criteria specified in Annex XI.Commercial

    shall be awarded in accordance with the procedure established in section D of the schedule of characteristics; all in accordance with the award criteria indicated in Annex XI of this specification.p. 22✓

    Spanish original

    se adjudicarán de acuerdo con el procedimiento establecido en el apartado D del cuadro de características; todo ello, con arreglo a los criterios de adjudicación señalados en el Anexo XI del presente pliego.

    award governed by formal Annex XI evaluation criteria

  23. Medium

    Clause 10.2: Deadlines are computed based on official Spanish peninsular date and time.Compliance

    For the purposes of calculating deadlines, the official mainland date and time shall be taken into account.p. 24✓

    Spanish original

    A efectos del cómputo de plazos se tomará en cuenta la fecha y la hora oficial peninsular.

    standard time zone rule for deadline calculation

  24. Medium

    Clause 11.3: Submissions are due before 14:00 on the date stated in the OJEU and Public Sector Procurement Platform notice.Compliance

    before fourteen hours on the day indicated in the publication of the competition notice in the Official Journal of the European Union and on the Public Sector Contracting Platform.p. 25✓

    Spanish original

    antes de las catorce horas del día que se señale en la publicación del anuncio del concurso en el Diario Oficial de las Unión Europea y en la Plataforma de contratación del Sector Público.

    firm 14:00 electronic submission cutoff deadline

  25. Medium

    Clause 13.2: Offer evaluation is conducted according to criteria quantifiable solely by applying formulas (Envelope 2).Commercial

    The evaluation of the offers will be carried out according to the criteria quantifiable through the mere application of formulas (envelope no. TWO).p. 27✓

    Spanish original

    La evaluación de las ofertas se realizará conforme a los criterios cuantificables mediante la mera aplicación de fórmulas (sobre nº DOS).

    award scored strictly via formula-based evaluation criteria

  26. Medium

    Clause 13.2: Envelope 2 documentation is evaluated in accordance with the criteria expressed in Annex XI.Commercial

    The documentation contained in these envelopes will be evaluated according to the criteria set out in Annex XI.p. 28✓

    Spanish original

    La documentación contenida en estos sobres será evaluada conforme a los criterios expresados en el Anexo XI.

    routine reference to Annex XI scoring criteria

  27. Medium

    Defects, errors, or omissions in the proposed awardee's required documentation must be cured within three working days of receiving the cure notice.Compliance

    so that they may remedy them within a period of three working days counted from the day following receipt of the request for remediation.p. 29✓

    Spanish original

    para que los subsane en el plazo de tres días hábiles a contar desde el siguiente al de la recepción del requerimiento de subsanación.

    firm 3-working-day cure deadline

  28. Medium

    Bidders must designate technical/commercial secrets and confidential offer information as confidential at the time of bid submission to prevent disclosure.Legal

    they may not disclose the information provided by the economic operators that the latter have designated as confidential at the time of submitting their tender; this nature affects, in particular, technical or trade secretsp. 32✓

    Spanish original

    no podrán divulgar la información facilitada por los empresarios que éstos hayan designado como confidencial en el momento de presentar su oferta; este carácter afecta, en particular, a los secretos técnicos o comerciales

    trade secrets risk disclosure if not marked at submission

  29. Medium

    Clause 24.3 a): Bidders intending to subcontract must specify in their bid the portion to subcontract, its value, and the subcontractors' name or professional solvency profile.Compliance

    Tenderers must indicate in the tender the part of the contract they intend to subcontract, stating its amount, and the name or business profilep. 39✓

    Spanish original

    Los licitadores deberán indicar en la oferta la parte del contrato que tengan previsto subcontratar, señalando su importe, y el nombre o el perfil empresarial

    mandatory bid-stage subcontracting disclosure requirement

  30. Medium

    Clause 30: Appeal procedure must be initiated in writing within 15 working days.Compliance

    The appeal procedure shall be initiated by means of a brief that must be filed within a period of fifteen working days.p. 44✓

    Spanish original

    El procedimiento de recurso se iniciará mediante escrito que deberá presentarse en el plazo de quince días hábiles.

    strict 15-working-day written filing deadline

  31. Low

    Lot 1 Declaration: Bidder must acknowledge applicable requirements and obligations regarding worker protection and working conditions.Compliance

    of the conditions, requirements and obligations regarding protection and working conditions that are requiredp. 1✓

    Spanish original

    de las condiciones, requisitos y obligaciones sobre protección y condiciones de trabajo que se exigen

    routine statutory labor compliance acknowledgment

  32. Low

    Lot 1 Declaration: Bidder must sign and commit to executing the supply in strict compliance with the Administrative and Technical Specifications.Compliance

    undertaking to execute it in strict compliance with the Administrative Specifications and Technical Specifications that are to govern the award and execution thereofp. 1✓

    Spanish original

    comprometiéndose a su ejecución con estricta sujeción a los Pliegos de Cláusulas Administrativas y de Prescripciones Técnicas que han de regir la adjudicación y ejecución del mismo

    routine tender compliance commitment

  33. Low

    Bidder must acknowledge the tender notice published in PLACSP and OJEU (DOUE) and provide its publication date.Compliance

    having been informed of the announcement published in PLACSP and the OJEUp. 1✓

    Spanish original

    enterado del anuncio publicado en PLACSP y DOUE

    routine administrative acknowledgment, low risk

  34. Low

    Lot 1 Technical Matrix: Bidder must complete the compliance table (Yes/No and Observations) for every technical specification row.Compliance

    To be completed by the bidderp. 1✓

    Spanish original

    A cumplimentar por el licitador

    routine bid form completion requirement

  35. Low

    Bidders must submit proposals in the format and manner required under Clause 11 (details in omitted pages 5-45).Compliance

    11. Manner of submission of proposalsp. 2✓

    Spanish original

    11. Forma de presentación de las proposiciones

    routine submission format requirement

  36. Low

    Proposals must contain all mandatory envelopes and documentation stipulated in Clause 12 (details in omitted pages 5-45).Compliance

    12. Content of the proposalsp. 2✓

    Spanish original

    12. Contenido de las proposiciones

    routine bid envelope content specification

  37. Low

    Submitted documentation examination and proposal evaluation procedures are governed by Clause 13 (details in omitted pages 5-45).Compliance

    13. Examination of documentation and appraisal of proposals.p. 2✓

    Spanish original

    13. Examen de la documentación y valoración de las proposiciones.

    routine bid review and evaluation procedure

  38. Low

    Awarded bidders must submit the mandatory post-award documentation listed in Annex IV.Compliance

    Annex IV. Documentation to be submitted by the awardee companiesp. 3✓

    Spanish original

    Anexo IV. Documentación a presentar por las empresas adjudicatarias

    routine post-award documentation submission

  39. Low

    Subcontracting Responsible Declaration (Annex IV.2.bis) must be submitted when subcontracting applies.Compliance

    Annex IV.2.bis. Responsible Statement on subcontractingp. 3✓

    Spanish original

    Anexo IV.2.bis. Declaración Responsable subcontratación

    routine subcontracting declaration form

  40. Low

    If requested, bidders must submit a site visit certificate using the template in Annex IV.5.Compliance

    Annex IV.5 Template of visit certificate, in case it is requestedp. 3✓

    Spanish original

    Anexo IV.5 Modelo de certificado de visita, en caso que se solicite

    conditional site visit certificate if requested

  41. Low

    Rules governing whether alternative bids/variants are admitted or prohibited are set out in Annex III (omitted from excerpt).Compliance

    Annex III Admission of variantsp. 3✓

    Spanish original

    Anexo III Admisión de variantes

    administrative rule on admissibility of variants

  42. Low

    Contracting authority is ASEPEYO's Subdirección General Sanitaria, published via the Contracting Authority Profile (Perfil de Contratante).Administrative

    Health Subdirectorate General (Contractor Profile)p. 4✓

    Spanish original

    Subdirección General Sanitaria (Perfil de Contratante)

    routine administrative identification of contracting body

  43. Low

    The procurement is divided into 11 distinct lots, each with dedicated budgets, VAT rates, renewal schedules, planned modifications, and maximum ceilings.Commercial

    11 lots are envisaged:p. 4✓

    Spanish original

    Se prevén 11 lotes:

    routine lot structure for tender submission

  44. Low

    Bidders are not obligated to submit bids for all lots (checked No).Commercial

    Is it mandatory to bid for all lots?p. 5✓

    Spanish original

    ¿Es obligatorio presentarse a todos los lotes?

    flexible lot participation rule with no all-lot mandate

  45. Low

    There is no limit on the maximum number of lots for which bidding companies may submit proposals (checked No hay límite).Commercial

    Maximum number of lots to which bidding companies may submit tenders:p. 5✓

    Spanish original

    Número máximo de lotes a los que se pueden presentar las empresas licitadoras:

    unrestricted lot bidding limit

  46. Low

    At the Contracting Board's request in accordance with the PCAP, samples of tendered products may be requested.Delivery

    At the request of the Contracting Board, in accordance with the provisions of the Specific Administrative Clauses Sheet, samples of the tendered products may be requested.p. 6✓

    Spanish original

    A requerimiento de la Mesa de Contratación, de acuerdo con lo previsto en el Pliego de Cláusulas Administrativas Particulares, se podrán solicitar muestras de los productos licitados.

    conditional sample submission upon request

  47. Low

    Requested samples will be used during the evaluation process and will not be returned once evaluation concludes.Commercial

    The requested samples will be used during the evaluation process and will not be returned upon its conclusion.p. 6✓

    Spanish original

    Las muestras solicitadas serán utilizadas durante el proceso de evaluación y no serán devueltas al finalizar el mismo.

    non-returnable evaluation samples

  48. Low

    Contractor must provide contract coordinator details and commercial contact data (contact persons, phones, and order email address).Delivery

    The contractor company must provide the information of the coordinator and the commercial data necessary for the execution of the contract (contact persons and telephone numbers, as well as the email address to which orders should be sent, etc.).p. 7✓

    Spanish original

    La empresa contratista deberá aportar la información del coordinador y los datos comerciales necesarios para la ejecución del contrato (personas y teléfonos de contacto, así como la dirección de correo donde remitir los pedidos, etc.).

    routine operational contact details

  49. Low

    Section 5.3: Non-consignment orders will be placed in writing and sent via email.Delivery

    Orders shall be placed in writing and sent via email.p. 10✓

    Spanish original

    Los pedidos se realizarán por escrito y se enviarán vía correo electrónico.

    routine written email order process

  50. Low

    Budgetary processing is classified as anticipated (Anticipada) rather than ordinary current-year processing.Compliance

    ☒ Earlyp. 10

    Spanish original

    ☒ Anticipada

    routine administrative budgetary classification

  51. Low

    Following evaluation of justifications by the Contracting Board and technical advisors, the contracting body decides on the Board's proposal whether to accept the financial offer.Compliance

    the contracting authority, upon proposal from the Board, shall proceed to accept or reject the submitted economic offer.p. 11✓

    Spanish original

    el órgano de contratación, a propuesta de la Mesa, procederá a aceptar o no la oferta económica presentada.

    procedural review of abnormal bid justification

  52. Low

    The procurement is conducted via an open tendering procedure (Abierto).Compliance

    Openp. 11

    Spanish original

    Abierto

    standard open procurement procedure

  53. Low

    The tender uses ordinary (non-urgent) administrative processing.Compliance

    Ordinaryp. 12

    Spanish original

    Ordinaria

    standard administrative processing timeline

  54. Low

    The payment method and invoice format produced by the contractor must comply with applicable regulations (Section H.2).Compliance

    The method of payment as well as the invoice template to be prepared by the successful bidder shall be carried out in accordance with current regulations.p. 13✓

    Spanish original

    La forma de pago así como el modelo de factura a realizar por parte del adjudicatario se realizará de acuerdo con la normativa vigente.

    routine regulatory invoicing requirement

  55. Low

    All invoices must comply with Article 6 of Royal Decree 1496/2003 of 28 November governing invoicing obligations (Section H.2).Compliance

    In any case, the invoice must comply with the provisions of Article 6 of RD 1496/2003 of November 28, approving the Regulation governing invoicing obligationsp. 13✓

    Spanish original

    En todo caso, la factura deberá cumplir con lo dispuesto en el artículo 6 del RD 1496/2003 de 28 de noviembre, por el que se aprueba el Reglamento por el que se regulan las obligaciones de facturación

    standard statutory invoicing rule

  56. Low

    All invoices must comply with Law 25/2013 of 27 December on electronic invoicing and the public-sector invoice accounting register (Section H.2).Compliance

    with the provisions of Law 25/2013, of December 27, on the promotion of electronic invoicing and the creation of the accounting register of invoices of the Public Sector.p. 13✓

    Spanish original

    con lo dispuesto en la Ley 25/2013, de 27 de diciembre, de impulso de la factura electrónica y creación del registro contable de facturas del Sector Público.

    standard electronic invoicing compliance

  57. Low

    Failure to include the required contract reference number on an invoice will result in the invoice being returned (Section H.2).Financial

    Failure to include the aforementioned reference number on the invoice will result in its return.p. 14✓

    Spanish original

    La no inclusión del número de referencia citado en la factura dará lugar a la devolución de la misma.

    standard administrative invoice rejection rule

  58. Low

    Invoices must designate Asepeyo, Mutua Colaboradora con la Seguridad Social, núm. 151 as the contracting entity (Section H.3).Administrative

    Contracting entity: Asepeyo, Mutua Colaboradora con la Seguridad Social, no. 151p. 14✓

    Spanish original

    Entidad contratante: Asepeyo, Mutua Colaboradora con la Seguridad Social, núm. 151

    routine mandatory invoice field

  59. Low

    Invoices must designate Hospital de día Cartuja ASEPEYO as the recipient / responsible directorate (Section H.3).Administrative

    Recipient (Responsible Department): Hospital de día Cartuja ASEPEYOp. 14✓

    Spanish original

    Destinatario (Dirección Responsable): Hospital de día Cartuja ASEPEYO

    routine mandatory invoice field

  60. Low

    Invoices must designate Dirección Financiera as the accounting office (Oficina contable) (Section H.3).Administrative

    Body with accounting competencies (Accounting office): Dirección Financierap. 14✓

    Spanish original

    Órgano con competencias en materia de contabilidad (Oficina contable): Dirección Financiera

    routine mandatory invoice field

  61. Low

    Invoices must indicate file reference number CP00122/2026 (Section H.3).Administrative

    File no.: CP00122/2026p. 14✓

    Spanish original

    Núm de expediente: CP00122/2026

    routine mandatory invoice field

  62. Low

    Pursuant to Articles 140 and 141 of Law 9/2017 (LCSP), bidders must submit only the specified documents in Envelope 1 (SOBRE 1) (Section I.1).Compliance

    In accordance with the provisions of Articles 140 and 141 of Law 9/2017 of 8 November on Public Sector Contracts (LCSP), bidding companies must only submit the following documentation in ENVELOPE 1:p. 14✓

    Spanish original

    De acuerdo con lo establecido en el art. 140 y 141 de la Ley 9/2017 de 8 de noviembre de Contratos del Sector Público (LCSP), las empresas licitadoras únicamente deberán presentar la siguiente documentación en el SOBRE 1:

    standard envelope submission requirement

  63. Low

    Variant or alternative bids are not admitted under Section K.1 (Article 142 LCSP).Compliance

    Not admittedp. 15

    Spanish original

    No se admiten

    routine prohibition on variant bids

  64. Low

    The contractor must notify in writing via ASEPEYO's Electronic Tendering Portal after contract award or at latest upon commencement of execution of its intention to subcontract.Compliance

    The contractor must communicate in writing through the ASEPEYO ELECTRONIC TENDER PORTAL, after the award of the contract or, at the latest, at the start of its performance, the intention to subcontract,p. 16✓

    Spanish original

    El contratista deberá comunicar por escrito a través del PORTAL DE LICITACIÓN ELECTRÓNICA de ASEPEYO tras la adjudicación del contrato o a más tardar, al inicio de la ejecución del mismo, la intención de subcontratar,

    routine administrative subcontracting notification

  65. Low

    The subcontracting notice must specify the portion of the services to be subcontracted and the identity, contact details, and legal representative(s) of the subcontractor.Compliance

    indicating: the part of the provision intended to be subcontracted and the identity, contact details, and legal representative(s) of the subcontractor,p. 16✓

    Spanish original

    indicando: parte de la prestación que se pretende subcontratar y la identidad, datos de contacto y representante/s legal del subcontratista,

    routine subcontractor disclosure requirement

  66. Low

    A Contracting Board (Mesa de Contratación) is established under Article 326 LCSP with the designated chair, members, legal member, and secretary listed in Section M.Compliance

    The Contracting Board shall be composed of the following persons:p. 16✓

    Spanish original

    La Mesa de Contratación estará compuesta por las siguientes personas:

    routine procedural governance information

  67. Low

    Contracting authorities will provide requested additional information on the tender documents at the latest 6 days before the bid submission deadline.Compliance

    The contracting authorities shall provide to all interested parties in the tender procedure, no later than 6 days before the end of the deadline set for the submission of tenders,p. 17✓

    Spanish original

    Los órganos de contratación proporcionarán a todos los interesados en el procedimiento de licitación, a más tardar 6 días antes de que finalice el plazo fijado para la presentación de ofertas,

    routine clarification response timeline

  68. Low

    For files declared urgent, the authority's deadline to provide additional information in open or restricted harmonized supply contracts is reduced from 6 days to at latest 4 days before bid submission.Compliance

    In files that have been classified as urgent, the deadline of at least six days before the end of the deadline set for the submission of tenders shall be 4 daysp. 17✓

    Spanish original

    En los expedientes que hayan sido calificados de urgentes, el plazo de seis días a más tardar antes de que finalice el plazo fijado para la presentación de ofertas será de 4 días

    routine statutory urgent-procedure clarification timeline

  69. Low

    All technical, economic, and administrative inquiries regarding this tender must be submitted solely and exclusively through the Public Sector Procurement Platform (questions and answers tab).Compliance

    Queries, whether technical, economic, or administrative, concerning this tender must be submitted solely and exclusively through the Public Sector Procurement Platform,p. 17✓

    Spanish original

    Las consultas, tanto técnicas, económicas como administrativas, referentes a la presente licitación deberán realizarse única y exclusivamente a través de la Plataforma de Contratación del Sector Público,

    routine exclusive Q&A communication channel

  70. Low

    To submit tender inquiries, the bidder must register on the Public Sector Procurement Platform.Compliance

    To this end, the tenderer must register on the Public Sector Procurement Platform.p. 17✓

    Spanish original

    Para ello el licitador deberá registrarse en la Plataforma de Contratación del Sector Público.

    routine platform registration requirement for Q&A

  71. Low

    Bidders may optionally request pertinent information on applicable tax, environmental, employment protection, gender equality, OHS, and disability hiring obligations from the listed public agencies.Compliance

    Tenderers may request the relevant information regarding the obligations that may be applicable to the services provided during the performance of the contract concerning taxation, environmental protectionp. 17✓

    Spanish original

    Los licitadores podrán solicitar la información pertinente sobre las obligaciones que pudieran ser aplicables a los servicios prestados durante la ejecución del contrato relativas a la fiscalidad, a la protección del medio ambiente

    optional statutory information resource for bidders

  72. Low

    Bids and requests to participate must be submitted using electronic means pursuant to the Fifteenth Additional Provision of the LCSP.Compliance

    The submission of tenders and requests to participate shall be carried out using electronic means, in accordance with the provisions of the fifteenth additional provision of the LCSP.p. 18✓

    Spanish original

    La presentación de ofertas y solicitudes de participación se llevará a cabo utilizando medios electrónicos, de conformidad con lo indicado en la disposición adicional decimoquinta de la LCSP.

    routine mandatory electronic bid submission

  73. Low

    Bids must be submitted via ASEPEYO's Electronic Tendering Portal at https://contratacion.asepeyo.es.Compliance

    To this end, tenders must be submitted on the ASEPEYO ELECTRONIC TENDER PORTAL.p. 18✓

    Spanish original

    A tal efecto, se deberán presentar las ofertas en el PORTAL DE LICITACIÓN ELECTRÓNICA de ASEPEYO.

    routine submission portal specification

  74. Low

    Copies submitted by bidders in this procurement procedure shall have legal effect solely within the scope of this procedure.Legal

    Copies provided by tenderers to this procurement procedure shall be valid exclusively within the scope thereof.p. 18✓

    Spanish original

    Las copias que aporten los licitadores al presente procedimiento de contratación tendrán eficacia, exclusivamente, en el ámbito del mismo.

    routine procedural scope limit on copies

  75. Low

    Notifications under the Fifteenth Additional Provision may be served via enabled electronic address or electronic appearance.Compliance

    Notifications may be made by means of an authorized electronic address or by electronic appearance.p. 18✓

    Spanish original

    Las notificaciones se podrán realizar mediante dirección electrónica habilitada o mediante comparecencia electrónica.

    routine electronic notification procedure

  76. Low

    Deadlines running from a notification are calculated from the date of dispatch or notice of electronic appearance if the act is published on the Contractor Profile the same day.Compliance

    Time limits to be counted from the notification shall be computed from the date of sending thereof or of the notice of notification, if it were by electronic appearance,p. 19✓

    Spanish original

    Los plazos a contar desde la notificación se computarán desde la fecha de envío de la misma o del aviso de notificación, si fuera mediante comparecencia electrónica,

    routine notification deadline calculation rule

  77. Low

    If the notified act is not published on the Contractor Profile the same day, deadlines are calculated from receipt of notification by the interested party.Compliance

    Otherwise, time limits shall be computed from the receipt of the notification by the interested party.p. 19✓

    Spanish original

    En caso contrario los plazos se computarán desde la recepción de la notificación por el interesado.

    routine fallback notification deadline calculation

  78. Low

    Notifications or requests for additional or supplementary information from ASEPEYO may be sent to the email address provided by bidders in Annex II.Compliance

    any notification or request for additional or complementary information required by ASEPEYO may be made to the email address provided for these cases by the tenderers.p. 19✓

    Spanish original

    cualquier notificación o solicitud de información adicional o complementaria que requiera ASEPEYO podrá efectuarse a la dirección de correo electrónico facilitada para estos casos por los licitadores.

    routine use of bidder email address from Annex II

  79. Low

    Email notifications and information requests sent by ASEPEYO comply with Article 28 of Law 11/2007 on electronic public service access.Legal

    Notifications or other requests for additional or complementary information sent by ASEPEYO by email comply with the terms established in Article 28 of Law 11/2007, of 22 June,p. 19✓

    Spanish original

    Las notificaciones o demás solicitudes de información adicional o complementaria remitidas por ASEPEYO por correo electrónico cumplen con los términos establecidos en el artículo 28 de la Ley 11/2007, de 22 de junio,

    routine statutory validity of email notifications

  80. Low

    Contract Manager powers under Article 62 LCSP shall be exercised by [name withheld], Manager of Hospital de día Cartuja ASEPEYO.Compliance

    In accordance with the provisions of art. 62 of the LCSP, note that the powers of the person responsible for the contract shall be exercised by [name withheld], manager of the Cartuja ASEPEYO Day Hospital.p. 19✓

    Spanish original

    Conforme con lo dispuesto en el art. 62 de la LCSP, indicar que las facultades del responsable del contrato serán ejercidas por [name withheld], gerente del Hospital de día Cartuja ASEPEYO.

    routine designation of Contract Manager

  81. Low

    Tender file processing type follows the specification in Section D of the Characteristics Table.Compliance

    with the procurement file processing specified in section D of the characteristics table.p. 20✓

    Spanish original

    con tramitación expediente de contratación especificada en el apartado D del cuadro de características.

    routine procedural cross-reference

  82. Low

    Section B of the Characteristics Table may limit the number of lots a bidder may tender for and the maximum number of lots a single bidder may be awarded.Commercial

    If so established in section B of the characteristics table, the number of lots for which a tender may be submitted and the maximum number of lots that may be awarded to a tenderer may be limited.p. 20✓

    Spanish original

    Si así se establece en el apartado B del cuadro de características podrá limitarse el número de lotes a los que se puede licitar y el número máximo de lotes de los que puede resultar adjudicatario un licitador.

    routine lot bidding and award limit notice

  83. Low

    Urgent processing of the contract reduces tendering and award deadlines pursuant to Article 119 and related provisions of the LCSP.Compliance

    The urgent processing of the contract will entail the reduction of time limits established for its tendering and award, pursuant to the rules established in art. 119 and concordant provisions of the LCSP.p. 20✓

    Spanish original

    La tramitación urgente del contrato implicará la reducción de plazos establecidos para su licitación y adjudicación, conforme las reglas establecidas en el art. 119 y concordantes de la LCSP.

    routine statutory urgent deadline reduction rule

  84. Low

    Contract information published via the Contractor Profile (Article 63 LCSP) may be consulted at the electronic address indicated in Section A of the Characteristics Table.Compliance

    may be consulted at the electronic address indicated in section A of the schedule of characteristics.p. 22✓

    Spanish original

    podrá ser consultada en la dirección electrónica indicada en el apartado A del cuadro de características.

    routine Contractor Profile publication link reference

  85. Low

    The contract(s) shall be awarded following the procedure set out in Section D of the Characteristics Table.Compliance

    The contract or contracts to which this specific administrative specifications document refers shall be awarded in accordance with the procedure established in section D of the schedule of characteristics;p. 22✓

    Spanish original

    El o los contratos a los que se refiere el presente pliego de cláusulas administrativas particulares se adjudicarán de acuerdo con el procedimiento establecido en el apartado D del cuadro de características;

    routine award procedure reference

  86. Low

    Clause 10.1: Bidders may or must bid on one, several, or all lots as indicated in the summary table and technical specifications.Compliance

    Any interested economic operator may or must submit a bid for one, several, or all lots depending on what is indicated in the schedule of characteristics of this specification and in the technical specifications.p. 23✓

    Spanish original

    Todo empresario interesado podrá o deberá presentarse a uno, varios o todos los lotes en función de lo que se indique en el cuadro de características de este pliego y en el pliego de prescripciones técnicas.

    routine lot participation instruction

  87. Low

    Clause 10.2: Proposals and complementary documentation must follow the prescribed format, place, and deadline in the tender notice.Compliance

    Proposals and supplementary documentation shall be submitted in the manner indicated in the following sections and at the place and within the deadline specified in the tender notice.p. 24✓

    Spanish original

    Las proposiciones y la documentación complementaria se presentarán en la forma indicada en los apartados siguientes y en el lugar y plazo señalado en el anuncio de licitación.

    routine submission form, venue, and deadline rule

  88. Low

    Clause 10.4: Bids must remain secret under Article 139.2 LCSP and conform to the prescribed templates in the PCAP, PPT, and annexes.Compliance

    Proposals shall be secret, as established in article 139.2 LCSP, and shall conform to the model established in the specific administrative clauses and/or technical specifications and their annexes,p. 24✓

    Spanish original

    Las proposiciones serán secretas, tal como establece el artículo 139.2 LCSP y se ajustarán al modelo que se establece en el pliego de cláusulas administrativas particulares y/o de prescripciones técnicas y sus anexos,

    routine bid confidentiality and template formatting rule

  89. Low

    Clause 11.2: Envelope 1 must contain the general documentation.Compliance

    Envelope number 1 shall contain the general documentation.p. 24✓

    Spanish original

    El sobre número 1 contendrá la documentación general.

    routine envelope content labeling

  90. Low

    Clause 11.3: If submitting in two electronic phases via fingerprint, the full offer must follow within a maximum of 24 hours.Compliance

    transmitting first the electronic fingerprint of the offer, upon receipt of which its submission shall be considered completed for all purposes, and afterwards the offer itself within a maximum period of 24 hours.p. 25✓

    Spanish original

    transmitiendo primero la huella electrónica de la oferta, con cuya recepción se considerará efectuada su presentación a todos los efectos, y después la oferta propiamente dicha en un plazo máximo de 24 horas.

    optional two-phase electronic fingerprint submission procedure

  91. Low

    Clause 12: All required documents must be submitted according to instructions in Section Q.Compliance

    All required documents must be submitted in accordance with what is stated in section Q of the characteristics table.p. 25✓

    Spanish original

    Todos los documentos exigidos deberán presentarse de acuerdo con lo expuesto en el apartado Q del cuadro de características.

    routine document formatting and submission reference

  92. Low

    Documents submitted by bidders will undergo preliminary qualification by the Contracting Board for timeliness and proper form.Compliance

    The Contracting Board shall beforehand evaluate the documents submitted in due time and proper form.p. 27✓

    Spanish original

    La Mesa de Contratación calificará previamente los documentos presentados en tiempo y forma.

    routine administrative submission check, low risk

  93. Low

    General bidder documentation must be enclosed in Envelope 1 (Sobre nº UNO).Compliance

    the President shall order the opening of the envelopes containing the general documentation (envelope no. ONE).p. 27✓

    Spanish original

    el Presidente ordenará la apertura de los sobres que contienen la documentación general (sobre nº UNO).

    routine envelope packaging requirement, low risk

  94. Low

    Clause 13.3: Minor wording changes or omissions in the template that do not alter its meaning are not grounds for rejection.Compliance

    On the contrary, the change or omission of some words of the template, provided that neither the one nor the other alters its meaning, shall not be sufficient cause for the rejection of the proposal.p. 28✓

    Spanish original

    Por el contrario, el cambio u omisión de algunas palabras del modelo, con tal que lo uno o la otra no alteren su sentido, no será causa bastante para el rechazo de la proposición.

    protective administrative rule against minor template typos

  95. Low

    Tax, Social Security, and related certificates may be issued via electronic, IT, or telematic means.Compliance

    The corresponding certificates may be issued by electronic, computer, or telematics means.p. 29✓

    Spanish original

    Los correspondientes certificados podrán ser expedidos por medios electrónicos, informáticos o telemáticos.

    permissive electronic certificate option, low risk

  96. Low

    Award will be issued within five working days following receipt of the required documentation from the awardee.Compliance

    within five business days following the receipt of the documentation requested and submitted by the successful tenderer.p. 30✓

    Spanish original

    en el plazo de cinco días hábiles siguientes a la recepción de la documentación requerida y remitida por parte de la empresa adjudicataria.

    routine procedural award timeline, low risk

  97. Low

    The award notice must specify the deadline for contract formalization pursuant to Art. 153.3 LCSP.Compliance

    The award notice must state the expected deadline within which the contract must be formalized in accordance with article 153.3 of the LCSP.p. 30✓

    Spanish original

    En el anuncio de adjudicación deberá indicarse el plazo previsto en que debe procederse a la formalización del contrato conforme al artículo 153.3 de la LCSP.

    routine administrative notice content, low risk

  98. Low

    Under Art. 158.2 LCSP, the contract award decision must be issued within four months from the first opening of proposals.Compliance

    the contract award must be issued by the contracting authority within a period of four months from the first act of opening the tendersp. 30✓

    Spanish original

    la adjudicación del contrato deberá dictarse por el órgano de contratación en el plazo de cuatro meses desde el primer acto de apertura de las proposiciones

    statutory award timeframe, low risk

  99. Low

    Contract formalization will be published under Art. 154 LCSP in the OJEU (DOUE) and the Public Sector Procurement Platform.Compliance

    The formalization of the contract must be published pursuant to Article 154 of the LCSP in the OJEU and on the Public Sector Procurement Platformp. 32✓

    Spanish original

    La formalización del contrato deberá publicarse conforme al artículo 154 de la LCSP en el DOUE y en la Plataforma de Contratación del Sector Público

    routine post-award publication rule, low risk

  100. Low

    Confidentiality protection cannot be extended to the entire content of a bidder's offer.Legal

    The duty of confidentiality of the contracting authority, as well as of its dependent services, may not extend to the entire content of the tenderp. 32✓

    Spanish original

    El deber de confidencialidad del órgano de contratación, así como de sus servicios dependientes, no podrá extenderse a todo el contenido de la oferta

    routine statutory scope limit on confidentiality, low risk

  101. Low

    Confidentiality may only apply to restricted-distribution documents and never to publicly accessible documents.Legal

    It may only extend to documents that have restricted dissemination and in no case to documents that are publicly accessible.p. 32✓

    Spanish original

    Únicamente podrá extenderse a documentos que tengan una difusión restringida y en ningún caso, a documentos que sean públicamente accesibles.

    routine transparency limitation, low risk

  102. Low

    All communications, exchanges, and information storage must guarantee data integrity and confidentiality of bids until submission deadline or opening.Compliance

    Communications, exchanges, and storage of information shall be carried out in such a way as to ensure that the integrity of data and the confidentiality of tenders and requests to participate are preservedp. 32✓

    Spanish original

    Las comunicaciones, los intercambios y el almacenamiento de información se realizarán de modo que se garantice la protección de la integridad de los datos y la confidencialidad de las ofertas y de las solicitudes de participación

    routine submission confidentiality safeguard, low risk

  103. Low

    Clause 17.2: Awardee must sign the corresponding Code of Conduct and Criminal Risk Prevention certificate to be annexed to the contract.Compliance

    To this end, the awarded company must sign the corresponding certificate that will be annexed to the contract.p. 33✓

    Spanish original

    Para ello la empresa adjudicataria deberá firmar el correspondiente certificado que se anexará al contrato.

    routine certificate signature requirement, low risk

  104. Low

    Clause 19: Contractor must notify Asepeyo of any change in email address or representative within 15 days from contract award notification (and any future changes) for execution notices.Compliance

    The contractor is obliged to communicate to Asepeyo any change in the email address or in its representative within a period of fifteen daysp. 36✓

    Spanish original

    El contratista está obligado a comunicar a Asepeyo, cualquier cambio en la dirección de correo electrónico o en su represente en un plazo de quince días

    routine contact update notice requirement, low risk

  105. Low

    Clause 19: Contractor must follow the Mutua's internal procedure and protocol for the payment system and required invoice template.Financial

    The contractor shall be obliged to follow the internal procedure and protocol established by the Mutua regarding the payment system for the contracted supply and the invoice model required by it.p. 36✓

    Spanish original

    El contratista estará obligado a seguir el procedimiento y protocolo interno establecido por la Mutua en cuanto al sistema de pago del suministro contratado y al modelo de factura requerido por la misma.

    routine invoicing format and payment protocol, low risk

  106. Low

    Clause 24.3 a): After award and no later than start of execution, contractor must notify contracting authority in writing of each subcontractor's contact details and legal representatives.Compliance

    the contractor must communicate in writing, following the award of the contract and, at the latest, when its performance begins, to the contracting authority the contact details and legal representative or representatives of the subcontractorp. 39✓

    Spanish original

    el contratista deberá comunicar por escrito, tras la adjudicación del contrato y, a más tardar, cuando inicie la ejecución de este, al órgano de contratación los datos de contacto y representante o representantes legales del subcontratista

    routine post-award subcontractor registration notice, low risk

  107. Low

    Clause 24.3 b): Main contractor must notify the contracting authority in writing of any changes to subcontractor information during execution and provide full details of new subcontractors.Compliance

    The main contractor must notify the contracting authority in writing of any change this information undergoes during the performance of the main contract, and all necessary information regarding any new subcontractors.p. 39✓

    Spanish original

    El contratista principal deberá notificar por escrito al órgano de contratación cualquier modificación que sufra esta información durante la ejecución del contrato principal, y toda la información necesaria sobre los nuevos subcontratistas.

    routine subcontractor change notification duty, low risk

  108. Low

    Clause 24.6: Upon contracting authority request, contractor must submit a detailed list of participating subcontractors and suppliers once their participation is finalized.Compliance

    when requested by the contracting authority, the successful contractor will submit a detailed list of the subcontracting or supplying entities participating in the contractp. 39✓

    Spanish original

    cuando el órgano contratante lo solicite, la contratista adjudicataria le remitirá una relación detallada de las entidades subcontratistas o suministradoras que participen en el contrato

    routine subcontractor reporting on buyer request, low risk

  109. Low

    Clause 24.3.a: Bidders must state in their offer the name or business profile (defined by professional or technical solvency conditions) of intended subcontractors.Compliance

    the name or business profile, defined by reference to the conditions of professional or technical solvency, of the subcontractors to whom its performance is to be entrusted.p. 39✓

    Spanish original

    el nombre o el perfil empresarial, definido por referencia a las condiciones de solvencia profesional o técnica, de las subcontratistas a los que se vaya a encomendar su realización.

    routine subcontractor profile disclosure in bid

  110. Low

    Clause 30: Appeal notices may be filed at the locations established in Article 16.4 of Law 39/2015 on Common Administrative Procedure.Compliance

    The appeal document may be filed at the places established in Article 16.4 of Law 39/2015, of October 1, on the Common Administrative Procedure of Public Administrations.p. 44✓

    Spanish original

    El escrito de interposición podrá presentarse en los lugares establecidos en el artículo 16.4 de la Ley 39/2015, de 1 de octubre, del Procedimiento Administrativo Común de las Administraciones Públicas.

    routine administrative filing options

  111. Low

    Clause 30: Appeals may also be filed directly at the registry of the contracting body or the body competent to resolve the appeal.Compliance

    Likewise, it may be filed at the registry of the contracting authority or at that of the body competent to resolve the appeal.p. 44✓

    Spanish original

    Asimismo, podrá presentarse en el registro del órgano de contratación o en el del órgano competente para la resolución del recurso.

    routine filing registry options

  112. Low

    Clause 30: For appeals against the tender notice, the 15-working-day period starts the day after publication in the Contracting Profile.Compliance

    When it is lodged against the contract notice, the period shall begin to run from the day following its publication on the Contracting authority profile.p. 44✓

    Spanish original

    Cuando se interponga contra el anuncio de licitación, el plazo comenzará a contarse a partir del día siguiente al de su publicación en el Perfil de contratante.

    standard appeal deadline calculation rule

  113. Low

    Clause 30: For appeals against tender specifications, the period starts the day after notice publication in the Contracting Profile (when access instructions are provided).Compliance

    When the appeal is lodged against the content of the specifications and other contractual documents, the calculation shall begin from the day following that on which it was published on the Contracting authority profilep. 45✓

    Spanish original

    Cuando el recurso se interponga contra el contenido de los pliegos y demás documentos contractuales, el cómputo se iniciará a partir del día siguiente a aquel en que se haya publicado en el Perfil de contratante

    standard appeal deadline calculation rule

  114. Low

    Clause 30: If access instructions were not indicated in the notice, the appeal period starts the day after delivery or access via the Contracting Profile.Compliance

    When this indication is not made, the period shall begin to count from the day following that on which they were delivered to the interested partyp. 45✓

    Spanish original

    Cuando no se hiciera esta indicación el plazo comenzará a contar a partir del día siguiente a aquel en que se le hayan entregado al interesado los mismos

    standard appeal deadline calculation rule

  115. Low

    Clause 30: Under Article 138.2 LCSP, if specifications cannot be made available electronically, the appeal period runs from the day after physical delivery.Compliance

    the specifications could not be made available by electronic means, the period shall be calculated from the day following that on which they were delivered to the appellant.p. 45✓

    Spanish original

    los pliegos no pudieran ser puestos a disposición por medios electrónicos, el plazo se computará a partir del día siguiente en que se hubieran entregado al recurrente.

    standard non-electronic delivery deadline rule

  116. Low

    Clause 30: For appeals against procedural acts or negotiated procedures without publicity, the period starts the day after learning of the potential infringement.Compliance

    against procedural acts adopted in the award procedure or against an act resulting from the application of the negotiated procedure without prior publication, the calculation shall begin from the following dayp. 45✓

    Spanish original

    contra actos de trámite adoptados en el procedimiento de adjudicación o contra un acto resultante de la aplicación del procedimiento negociado sin publicidad, el cómputo se iniciará a partir del día siguiente

    standard appeal deadline calculation rule

  117. Low

    Clause 30: For appeals against contract award, the period starts the day after notification under the Fifteenth Additional Provision.Compliance

    When it is lodged against the award of the contract, the calculation shall begin from the day following that on which it was notified in accordance with the provisions of the fifteenth additional provisionp. 45✓

    Spanish original

    Cuando se interponga contra la adjudicación del contrato el cómputo se iniciará a partir del día siguiente a aquel en que se haya notificado esta de conformidad con lo dispuesto en la disposición adicional decimoquinta

    standard award appeal deadline calculation rule

  118. Low

    Clause 30: For appeals against unlawful modifications under Articles 204/205 LCSP, the period starts the day after publication in the Contracting Profile.Compliance

    in relation to any modification based on non-compliance with the provisions of Articles 204 and 205 of the LCSP, on the grounds that the modification should have been the subject of a new award, from the following dayp. 45✓

    Spanish original

    en relación con alguna modificación basada en el incumplimiento de lo establecido en los artículos 204 y 205 de la LCSP, por entender que la modificación debió ser objeto de una nueva adjudicación, desde el día siguiente

    standard modification appeal deadline rule

  119. Low

    Clause 30: In all other appeal cases, the period runs from the day following notification under the Fifteenth Additional Provision.Compliance

    In all other cases, the period shall begin to count from the day following that of the notification made in accordance with the provisions of the fifteenth Additional Provision.p. 45✓

    Spanish original

    En todos los demás casos, el plazo comenzará a contar desde el día siguiente al de la notificación realizada de conformidad con lo dispuesto en la Disposición adicional decimoquinta.

    standard residual appeal deadline rule

Eligibility43 rows · 14 high

  1. High

    Failure to deliver requested samples immediately within a maximum of 3 working days will result in bid exclusion.Delivery

    Failure to make immediate delivery, within a maximum period of 3 working days, will be grounds for exclusion of the offer.p. 6✓

    Spanish original

    El incumplimiento de la entrega inmediata, en un plazo máximo de 3 días laborables, será motivo de exclusión de la oferta.

    automatic bid exclusion if samples miss 3-working-day deadline

  2. High

    Ground for exclusion: Failure to submit all documentation required in the Technical Specifications (PPT).Compliance

    Failure to submit all the documentation required in the PPT.p. 7✓

    Spanish original

    No presentar toda la documentación exigida en el PPT.

    hard pass/fail bid exclusion gate

  3. High

    Ground for exclusion: Failure to submit the complete technical datasheet for any product in the lot.Technical

    Failure to submit the complete technical data sheet for any of the products that make up the lot.p. 7✓

    Spanish original

    La no presentación de la ficha técnica completa de alguno de los productos que componen el lote.

    hard pass/fail exclusion for missing datasheet

  4. High

    Ground for exclusion: Offered products fail to comply with the requested technical specifications.Technical

    That the submitted products do not comply with the requested technical specifications..p. 7✓

    Spanish original

    Que los productos presentados no cumplan con las especificaciones técnicas solicitadas..

    hard pass/fail exclusion for technical non-compliance

  5. High

    Ground for lot exclusion: Failure to submit a technical offer for any component of the tendered lot(s), unless the product is obsolete with an accepted responsible declaration.Compliance

    Failure to submit a technical offer for any of the components of the lot/s for which they are submitting an offer.p. 7✓

    Spanish original

    No presentar oferta técnica de alguno de los componentes de el/los lote/s a los que se presenten.

    lot exclusion for missing component technical offer

  6. High

    Ground for exclusion: Failure to immediately deliver requested samples within a maximum of 3 business days.Delivery

    Failure to comply with the immediate delivery of samples (maximum period of 3 working days), in the event they are requested.p. 7✓

    Spanish original

    El incumplimiento de la entrega inmediata de muestras (plazo máximo de 3 días hábiles), en caso que se soliciten.

    automatic exclusion if samples miss 3-business-day SLA

  7. High

    Ground for lot exclusion: Submitting the same product for two different components of a lot.Technical

    Submitting the same product for two components of a lot will be grounds for the bidder to be excluded from the corresponding lot.p. 7✓

    Spanish original

    Presentar un mismo producto para dos componentes de un lote será motivo para que el licitador quede excluido del lote correspondiente.

    lot exclusion trap for duplicate product across items

  8. High

    Omitting a technical offer for any lot component results in exclusion from that lot unless the product is obsolete, a responsible declaration of obsolescence is submitted, and its justification is accepted.Compliance

    It will be grounds for the bidder to be excluded from the corresponding lot, except in cases where the product is obsolete and, after submitting a responsible declaration confirming that it is obsolete, their justification is accepted.p. 7✓

    Spanish original

    Será motivo para que el licitador quede excluido del lote correspondiente, salvo en los casos que el producto esté obsoleto y, tras presentar declaración responsable conforme está obsoleto, se acepte su justificación.

    lot exclusion unless obsolescence declaration accepted

  9. High

    If an abnormally low financial offer is not accepted after justification review, the bidder shall be automatically excluded from the tender.Compliance

    In the event that the economic offer is not accepted, the bidder shall be automatically excluded from the procurement procedure.p. 11✓

    Spanish original

    En el caso que la oferta económica no se acepte el licitador quedará automáticamente excluido de la licitación.

    automatic bid exclusion pass/fail gate if justification rejected

  10. High

    Bidders must submit in Envelope 1 the European Single Procurement Document (DEUC) using Model Annex VII declaring compliance with capacity and solvency requirements (Section I.1).Compliance

    European Single Procurement Document (hereinafter, ESPD) by which it is declared that the capacity and solvency requirements demanded in these specifications are met (Model Annex VII).p. 14✓

    Spanish original

    Documento europeo único de capacidad y solvencia (en lo sucesivo, DEUC) mediante el cual se declara que se cumplen con los requisitos de capacidad y solvencia exigidos en el presente pliego (Modelo Anexo VII).

    routine mandatory bid declaration form

  11. High

    Clause 10.3: Bidders must not fall under any statutory debarment circumstances listed in Article 71 LCSP.Legal

    Persons intending to participate in the tender must not fall under any of the circumstances listed in article 71 LCSP.p. 24✓

    Spanish original

    Las personas que pretendan concurrir a la licitación no deben hallarse comprendidas en ninguna de las circunstancias enumeradas en el artículo 71 LCSP.

    hard statutory non-debarment pass/fail eligibility gate

  12. High

    Clause 12.1: Companies with over 50 employees must submit a valid certificate of registration of their gender equality plan in the labor registry.Compliance

    ONLY FOR COMPANIES WITH MORE THAN 50 WORKERS: Certificate of registration in the labor register corresponding to the equality plan between men and women, which must be in forcep. 25✓

    Spanish original

    SÓLO PARA EMPRESAS DE MÁS DE 50 TRABAJADORES: Certificado de inscripción en el registro laboral correspondiente al plan para la igualdad entre hombres y mujeres, el cual deberá encontrarse vigente

    mandatory active equality-plan registration certificate for >50 staff

  13. High

    General documentation deemed insufficient by the Contracting Board will be rejected.Compliance

    agreeing to the admission or rejection, as the case may be, of that which is not considered sufficient.p. 27✓

    Spanish original

    acordando la admisión o el rechazo, en su caso, de aquella que no sea considerada bastante.

    hard pass/fail eligibility gate causing rejection

  14. High

    The proposed awardee must submit documentation proving compliance with tax and Social Security obligations.Compliance

    The successful bidder must present supporting documentation demonstrating that it is up to date in the fulfillment of its tax and Social Security obligationsp. 29✓

    Spanish original

    El adjudicatario deberá presentar la documentación justificativa de hallarse al corriente en el cumplimiento de sus obligaciones tributarias y con la Seguridad Social

    mandatory statutory compliance certificates prior to award

  15. Medium

    Bidders/awardees must provide evidence of legal capacity and economic, financial, technical, and professional solvency per Annex IV.1 (thresholds in omitted pages).Financial

    Annex IV.1 Documentation proving capacity, economic and financial, technical and professional solvencyp. 3✓

    Spanish original

    Anexo IV.1 Documentación acreditativa de capacidad, solvencia económica y financiera, técnica y profesional

    mandatory financial and technical solvency gate

  16. Medium

    Bidders must submit the European Single Procurement Document (DEUC / ESPD) per Annex VII.Compliance

    Annex VII European Single Procurement Documentp. 3✓

    Spanish original

    Anexo VII Documento Europeo Único de Contratación

    mandatory eligibility gate via ESPD/DEUC declaration

  17. Medium

    Clause 9: Bidders must accredit legal capacity and solvency per conditions in Section I and annexes.Compliance

    Bidding companies shall prove their capacity and standing in accordance with the conditions indicated in section I of the schedule of characteristics of this specification and its annexes.p. 22✓

    Spanish original

    Las empresas licitadoras acreditarán su capacidad y solvencia de acuerdo con las condiciones indicadas en el apartado I del cuadro de características del presente pliego y sus anexos.

    mandatory capacity and solvency qualification requirement

  18. Medium

    Clause 9: Relying on external third-party solvency requires proving effective availability via a written commitment document.Compliance

    Proving standing by reliance on external resources (Article 75 LCSP) shall require demonstrating that for the execution of the contract the bidder effectively has those resources at its disposal through the presentation of the corresponding commitment document,p. 22✓

    Spanish original

    La acreditación de la solvencia mediante medios externos (artículo 75 LCSP), exigirá demostrar que para la ejecución del contrato dispone efectivamente de esos medios mediante la exhibición del correspondiente documento de compromiso de disposición,

    third-party commitment document required for external solvency

  19. Medium

    Clause 10.3: Natural or legal persons must hold full legal capacity to act under Articles 65 et seq. LCSP.Legal

    natural or legal persons, Spanish or foreign, who have full capacity to act under the terms established in articles 65 and following of the LCSPp. 24✓

    Spanish original

    las personas naturales o jurídicas, españolas o extranjeras, que tengan plena capacidad de obrar en los términos establecidos en los artículos 65 y siguientes LCSP

    mandatory statutory legal capacity gate

  20. Medium

    Clause 10.3: Bidders must duly accredit their economic, financial, and technical or professional solvency.Financial

    and duly prove their economic, financial, and technical or professional solvency.p. 24✓

    Spanish original

    y acrediten debidamente su solvencia económica, financiera y técnica o profesional.

    mandatory economic, financial, and technical solvency gate

  21. Medium

    Clause 10.3: Legal entities may only be awarded contracts whose services fall within the corporate object/purpose in their bylaws (Art. 66 LCSP).Legal

    legal persons may only be awarded contracts whose benefits fall within the purposes, object, or scope of activity that, according to their articles of association or foundational rules, are proper to them (art. 66 LCSP),p. 24✓

    Spanish original

    las personas jurídicas sólo podrán ser adjudicatarias de contratos cuyas prestaciones estén comprendidas dentro de los fines, objeto o ámbito de actividad que, a tenor de sus estatutos o reglas fundacionales, les sean propios (art. 66 LCSP),

    mandatory corporate bylaws purpose alignment gate

  22. Medium

    Clause 10.3: Legal entities must accredit corporate object alignment and maintain sufficient personnel and material organization to execute the contract.Technical

    this relationship being duly accredited by them, and they must have an organization with sufficient personal and material resources for the proper execution of the contract.p. 24✓

    Spanish original

    estar esta relación debidamente acreditada por aquellas, y deben disponer de una organización con elementos personales y materiales suficientes para la correcta ejecución del contrato.

    mandatory organizational staffing and material sufficiency gate

  23. Medium

    The proposed awardee must submit any requested documents proving aptitude to contract or effective availability of resources committed under Art. 76 LCSP.Technical

    any other documents certifying their fitness to contract or the effective availability of the resources they had committed to dedicate or assign to the execution of the contract pursuant to Article 76 LCSPp. 29✓

    Spanish original

    cualesquiera otros documentos acreditativos de su aptitud para contratar o de la efectiva disposición de los medios que se hubiesen comprometido a dedicar o adscribir a la ejecución del contrato conforme al artículo 76 LCSP

    mandatory resource availability and aptitude proof

  24. Medium

    Clause 24.3 a): Contractor must accredit that each subcontractor is not subject to any prohibition on contracting under Article 71 LCSP.Compliance

    proving that it is not subject to a prohibition on contracting in accordance with Article 71 of the LCSP.p. 39✓

    Spanish original

    acreditando que el mismo no se encuentra incurso en prohibición de contratar de acuerdo con el artículo 71 de la LCSP.

    mandatory pass-fail non-debarment check for subcontractors

  25. Low

    Bidders must meet participation conditions to submit proposals under Clause 10 (details in omitted pages 5-45).Compliance

    10. Conditions for submitting proposalsp. 2✓

    Spanish original

    10. Condiciones para presentar las proposiciones

    routine bid submission conditions reference

  26. Low

    Capacity and solvency documentation must be presented using the standardized model in Annex IV.3.Compliance

    Annex IV.3 Standardized template for submitting capacity and solvency documentationp. 3✓

    Spanish original

    Anexo IV.3 Modelo normalizado de presentación de la documentación de capacidad y solvencia

    routine standardized submission template

  27. Low

    Only companies proposed for contract award based on the best quality-price ratio offer must submit full documentary proof of capacity and solvency requirements (Section I.1).Compliance

    Only the companies that are proposed for the award, for having submitted the tender with the best quality-price ratio, must provide the documentation accrediting compliance with the capacity and solvency requirementsp. 14✓

    Spanish original

    Solamente las empresas en las que recaiga la propuesta de adjudicación, por haber presentado la oferta con la mejor relación calidad-precio, deberán aportar la documentación que acredite el cumplimiento de los requisitos de capacidad y solvencia

    standard post-selection verification rule

  28. Low

    No contractor classification is required for this procurement pursuant to Article 77.1 c) of the LCSP (Section I.2).Compliance

    In accordance with the provisions of art. 77.1 c) LCSP, classification is not required.p. 14✓

    Spanish original

    De acuerdo con lo establecido en el art. 77.1 c) LCSP no se exige clasificación.

    exempts bidder from contractor classification

  29. Low

    The contractor must sufficiently substantiate the subcontractor's aptitude to perform the work by referencing its technical and human resources and experience.Compliance

    sufficiently justifying the latter's suitability to perform it, referring to the technical and human resources available to it and to its experience,p. 16✓

    Spanish original

    justificando suficientemente la aptitud de éste para ejecutarla, haciendo referencia a los elementos técnicos y humanos de que dispone y a su experiencia,

    routine subcontractor capability justification

  30. Low

    The contractor must prove that the proposed subcontractor is not subject to any prohibition on contracting under Article 71 of the LCSP.Compliance

    as well as proving that it is not subject to any prohibition from contracting pursuant to art. 71 of the LCSP.p. 16✓

    Spanish original

    así como acreditar que no está incurso en prohibición de contratar según el art. 71 de la LCSP.

    routine statutory eligibility proof for subcontractors

  31. Low

    Clause 9: Sufficiency of external solvency resources must be proven using methods specified in Section I and annexes.Compliance

    in addition to justifying their sufficiency by the means established in section I of the schedule of characteristics of this specification and its annexes.p. 22✓

    Spanish original

    además de justificar su suficiencia por los medios establecidos en el apartado I del cuadro de características del presente pliego y sus anexos.

    routine evidentiary requirement for external solvency

  32. Low

    Accredited solvency shall be assessed in accordance with the criteria established in the Annexes.Compliance

    The accredited solvency shall be evaluated according to the criteria set out in said Annexes.p. 22✓

    Spanish original

    La solvencia acreditada se valorará según los criterios fijados en dichos Anexos.

    routine solvency evaluation rule

  33. Low

    Clause 9: Contracting body may prohibit in Section I a single third party from supporting the solvency of more than one bidder.Compliance

    may prohibit, by stating so in section I of the schedule of characteristics of this specification, that the same economic operator may participate to complete the standing of more than one bidder.p. 23✓

    Spanish original

    podrá prohibir, haciéndolo constar en el en el apartado I del cuadro de características del presente pliego, que un mismo empresario pueda concurrir para completar la solvencia de más de un licitador.

    potential restriction on shared third-party solvency support

  34. Low

    Clause 9: For joint ventures (UTEs), solvency is determined by accumulating the accredited qualifications of each member.Compliance

    In Temporary Joint Ventures of Economic Operators (Uniones Temporales de Empresarios), for the purposes of determining their standing, the characteristics proven for each of the members thereof shall be accumulated (art. 24.1 RGLCAP).p. 23✓

    Spanish original

    En las Uniones Temporales de Empresarios, a efectos de determinación de su solvencia, se acumularán las características acreditadas para cada uno de los integrantes de la misma (art. 24.1 RGLCAP).

    standard JV solvency accumulation rule

  35. Low

    Clause 9.1.1: Where permitted, solvency may be accredited via contractor classification in Section I groups/subgroups at equal or higher categories.Compliance

    by means of its classification in the classification group or subgroup corresponding to the contract determined in section I of the schedule of characteristics, in categories equal to or higher than those mentioned therein.p. 23✓

    Spanish original

    mediante su clasificación en el grupo o subgrupo de clasificación correspondiente al contrato que se determine en el apartado I del cuadro de características, en las categorías iguales o superiores a las allí mencionadas.

    optional alternative solvency accreditation via classification

  36. Low

    Clause 9.1.2: Joint venture (UTE) classification is determined by accumulating each associate's classification characteristics.Compliance

    The classification of the UTE is determined by accumulating the characteristics of each of the associates, as expressed in their respective classifications (article 52 RGLCAP).p. 23✓

    Spanish original

    La clasificación de la UTE se determina mediante la acumulación de las características de cada uno de los asociados, expresados en sus respectivas clasificaciones (artículo 52 RGLCAP).

    standard JV classification aggregation rule

  37. Low

    Clause 9.1.3: Non-Spanish EU bidders are subject to Article 78 LCSP rules regarding classification and solvency.Compliance

    Regarding non-Spanish bidders from Member States of the European Union, the provisions of article 78 LCSP shall apply.p. 23✓

    Spanish original

    En cuanto a las licitadoras o los licitadores no españoles de estados miembros de la Unión Europea se estará a lo dispuesto en el artículo 78 LCSP.

    routine EU bidder statutory equivalency rule

  38. Low

    Clause 12.1: Envelope 1 must include the DEUC declaring compliance with capacity and solvency requirements per Section I.1.Compliance

    European Single Procurement Document (hereinafter, ESPD) whereby it is declared that the capacity and solvency requirements demanded in this specification are met. (see section I.1 of the characteristics table).p. 25✓

    Spanish original

    Documento europeo único de capacidad y solvencia (en lo sucesivo, DEUC) mediante el cual se declara que se cumplen con los requisitos de capacidad y solvencia exigidos en el presente pliego. (ver apartado I.1 del cuadro de características).

    standard European Single Procurement Document requirement

  39. Low

    Clause 13.3: In a tie, award preference goes to the bidder with the highest percentage of permanent employees with disabilities.Compliance

    preference in the award of the contract will be given to the tenderer with the highest percentage of permanent workers with disabilities on its staff.p. 28✓

    Spanish original

    tendrá preferencia en la adjudicación del contrato el licitador que disponga del mayor porcentaje de trabajadores fijos con discapacidad en su plantilla.

    standard statutory tie-breaking criterion

  40. Low

    Clause 13.3: Secondary tie-breaker favors bidders with social and labor gender-equality measures in place at the submission deadline.Compliance

    preference shall be given to the proposal of the company that has social and labor measures that foster equal opportunities between men and women at the time of the expiration of the deadline for the submission of tenders,p. 28✓

    Spanish original

    será preferida la proposición de la empresa que disponga de medidas de carácter social y laboral que favorezcan la igualdad de oportunidades entre hombre y mujeres en el momento del vencimiento del plazo de presentación de ofertas,

    standard secondary tie-breaking criterion

  41. Low

    Clause 13.3: Evidence of tie-breaking gender-equality measures must exist at bid submission deadline and will be requested by ASEPEYO.Compliance

    at the time of the expiration of the deadline for the submission of tenders, which will be requested by this Mutua.p. 28✓

    Spanish original

    en el momento del vencimiento del plazo de presentación de ofertas, las cuales serán requeridas por esta Mutua.

    routine post-submission verification rule for tie-breakers

  42. Low

    Clause 24.1: An assignee cannot be an entity subject to classification suspension or debarment from public contracting.Compliance

    The assignee cannot be a person subject to suspension of classification or disqualification from contracting.p. 38✓

    Spanish original

    El cesionario no puede ser persona incursa en suspensión de clasificación o inhabilitación para contratar.

    routine statutory assignee eligibility bar, low risk

  43. Low

    Clause 24.3 a): Contractor must sufficiently justify each subcontractor's aptitude to perform the work by reference to technical/human resources and experience.Technical

    sufficiently justifying the latter's suitability to perform it by reference to the technical and human resources available to it and to its experiencep. 39✓

    Spanish original

    justificando suficientemente la aptitud de éste para ejecutarla por referencia a los elementos técnicos y humanos de que dispone y a su experiencia

    routine subcontractor technical qualification proof, low risk

Pricing & BoQ146 rows · 11 high

  1. High

    Economic offer and Annex XI automatic-formula award criteria must be included in Annex V for each lot tendered.Commercial

    The economic offer and the rest of the criteria quantifiable through automatic formulas reflected in Annex XI Award Criteria, shall be included in Annex V Criteria quantifiable through automatic formulas of the lot for which an offer is submitted.p. 6✓

    Spanish original

    La oferta económica y del resto de criterios cuantificables mediante fórmulas automáticas reflejados en el anexo XI Criterios de adjudicación, se incluirán en el anexo V Criterios cuantificables mediante fórmulas automáticas del lote al que presenten oferta.

    mandatory priced offer and scored formula-criteria template

  2. High

    Ground for exclusion: Failure to submit the economic offer in the terms established in the specifications.Commercial

    When the bidder has not submitted the economic offer in the terms established in this specification.p. 7✓

    Spanish original

    Cuando el licitador no haya aportado la oferta económica en los términos establecidos en el presente pliego.

    hard exclusion for non-compliant pricing submission

  3. High

    Ground for exclusion: Failure to bid on all products within the lot in the economic offer.Commercial

    When not all products in the lot are bid onp. 7✓

    Spanish original

    Cuando no se oferte a todos los productos del lote

    hard exclusion for partial lot financial bid

  4. High

    Ground for exclusion: Entering an amount equal to zero in the 'Precio Unitario en €' field of the economic offer.Commercial

    When in the economic offer any amount equal to zero has been entered in the box “Unit Price in €”p. 7✓

    Spanish original

    Cuando en la oferta económica se haya añadido algún importe igual a cero en la casilla “Precio Unitario en €”

    hard exclusion trap if zero unit price entered

  5. High

    Ground for exclusion: Offering a unit price exceeding the maximum tender unit price.Commercial

    When in the economic offer there is an offered price higher than the Maximum tender unit amount.p. 7✓

    Spanish original

    Cuando en la oferta económica haya un precio ofertado superior al Importe máximo unitario de licitación.

    hard exclusion if any unit price exceeds cap

  6. High

    Under Additional Provision 33 of the LCSP, the overall maximum budgetary limit of the contract is €1,661,077.03 excluding taxes across its entire duration, including extensions.Financial

    In any case, and pursuant to Additional Provision 33 of the LCSP, the maximum budget limit for this contract shall be €1,661,077.03, taxes excluded, throughout the entire term of the contract (extensions included).p. 10✓

    Spanish original

    En todo caso, y en cumplimiento de la disposición adicional 33 de la LCSP, el límite máximo presupuestario del presente contrato será de 1.661.077,03€, impuestos excluidos, durante toda la vigencia del contrato (prórrogas incluidas).

    hard statutory budget cap across contract duration and extensions

  7. High

    Submitted bids may be deemed abnormally low if they are more than 20 percentage points below the base tender budget.Commercial

    Tenders submitted may be considered abnormal when they are lower than the base tender budget by more than 20 percentage points.p. 11✓

    Spanish original

    Se podrán considerar las proposiciones presentadas como anormales cuando las mismas sean inferiores al presupuesto base de licitación en más de 20 unidades porcentuales.

    abnormally low bid threshold triggers justification audit

  8. High

    Price revision is not permitted during the entire term of the contract, including any extensions (Article 102.5 LCSP).Financial

    Price revision shall not apply during the entire term of the contract, extensions included.p. 15✓

    Spanish original

    No procederá la revisión de precios durante toda la vigencia del contrato, prórrogas incluidas.

    fixed prices with no inflation adjustment including extensions

  9. High

    Clause 4.1: Bids exceeding the base tender budget will be automatically excluded from the procedure.Commercial

    In the event that the tender submitted by the bidder exceeds the tender base budget, it shall be automatically excluded from the procedure.p. 21✓

    Spanish original

    En caso que la oferta presentada por el licitador o licitadora supere el presupuesto base de licitación será automáticamente excluida del procedimiento.

    hard pass/fail disqualification gate if bid exceeds budget

  10. High

    Clause 13.3: Proposals with manifest price errors or bidder-acknowledged unviable errors/inconsistencies will be rejected by reasoned minutes.Commercial

    involved a manifest error in the amount of the proposal, or there were an acknowledgment by the tenderer that it suffers from an error or inconsistency that renders it unfeasible, it shall be rejected by the board, in a reasoned record.p. 28✓

    Spanish original

    comportase error manifiesto en el importe de la proposición, o existiese reconocimiento por parte del licitador de que adolece de error o inconsistencia que la hagan inviable, será desechada por la mesa, en acta motivada.

    rejection risk for manifest pricing error or unviable inconsistency

  11. High

    Any proposal exceeding the base tender budget will be rejected by the Contracting Board.Financial

    exceeded the base tender budgetp. 28✓

    Spanish original

    excediese del presupuesto base de licitación

    hard pass/fail budget ceiling causing rejection

  12. Medium

    Economic proposal and automatic formula-based criteria must be submitted in Envelope 2 (SOBRE 2) using the template in Annex V.Commercial

    Annex V Template of economic tender and other automatic criteria subject to formulas (ENVELOPE 2)p. 3✓

    Spanish original

    Anexo V Modelo de proposición económica y demás criterios automáticos sometidos a fórmulas (SOBRE 2)

    mandatory multi-envelope pricing submission and formula evaluation

  13. Medium

    The total Base Tender Budget (Presupuesto Base de Licitación) across all 11 lots is €443,880.36 including VAT (€402,893.78 excluding VAT).Commercial

    €443,880.36p. 4

    Spanish original

    443.880,36 €

    binding initial contract base tender budget ceiling

  14. Medium

    Completion of Annex V (economic offer and formula criteria) is mandatory, following instructions in its first tab.Commercial

    The completion of said annex is mandatory.p. 6✓

    Spanish original

    La cumplimentación de dicho anexo es de carácter obligatorio.

    mandatory commercial submission form

  15. Medium

    The overall maximum contract spending limit including VAT across all 11 lots is €1,830,112.98.Commercial

    €1,830,112.98p. 6

    Spanish original

    1.830.112,98 €

    binding maximum contract spending ceiling including VAT

  16. Medium

    For Lot 3, the supplier must provide 2 cement injection guns on a free-loan (cesión) basis.Commercial

    3.10 Cement injection gun (assignment) ESTIMATED ANNUAL CONSUMPTION 2p. 7

    Spanish original

    3.10 Pistola inyectora de cemento (cesión) CONSUMO ANUAL PREVISTO 2

    unpriced free-loan equipment obligation for Lot 3

  17. Medium

    Total expenditure under the supply contract depends on ASEPEYO's actual needs during the contract validity period, with no guaranteed minimum purchase volume.Commercial

    The total amount of expenditure arising from the supply covered by these specifications will depend on the needs of the Mutua during its term of validity.p. 9✓

    Spanish original

    El importe total del gasto que se derive del suministro objeto del presente pliego dependerá de las necesidades de la Mutua durante el periodo de su vigencia.

    demand-dependent volume with no minimum purchase guarantee

  18. Medium

    Section 5.2.3: All costs associated with supply (transport charges, waste disposal, etc.) must be included in the offered prices.Commercial

    All costs associated with the supply (transport carriage, waste disposal, etc.) will be included in the offered prices.p. 9✓

    Spanish original

    Todos los costes asociados al suministro (portes de transporte, eliminación de residuos, etc.) estarán incluidos en los precios ofertados.

    all transport and waste disposal costs absorbed in unit prices

  19. Medium

    Section 6: Payment will be made via bank transfer according to the internal procedure and protocol established by Mutua ASEPEYO.Financial

    Payment shall be made by bank transfer in accordance with the internal procedure and protocol established by the Mutual ASEPEYO itself.p. 10✓

    Spanish original

    La forma de pago se efectuará mediante transferencia bancaria según el procedimiento y protocolo interno establecido por la propia Mutua ASEPEYO.

    standard bank transfer under buyer internal protocol

  20. Medium

    If a tender is flagged as abnormally low, the bidder shall be given a hearing and must submit documentary justification of its bid valuation and specific terms.Compliance

    In the event that a tender is deemed abnormal, a hearing must be granted to the bidder who submitted it so that it may justify the valuation of the tender and specify its conditions; in particular, documentary justification must be provided for:p. 11✓

    Spanish original

    En caso que se estime una oferta como anormal deberá darse audiencia al licitador que la haya presentado para que justifique la valoración de la oferta y precise las condiciones de la misma, en particular se deberá justificar documentalmente:

    mandatory documentary justification upon abnormally low bid notice

  21. Medium

    Clause 4.1: Contract award cannot exceed the stated tender budget under any circumstances.Commercial

    Under no circumstances may the award be for an amount exceeding the indicated tender budget.p. 21✓

    Spanish original

    La adjudicación no podrá ser, en ningún caso, por importe superior al presupuesto de licitación indicado.

    routine statutory budget cap on award value

  22. Medium

    Clause 5.2: Contract price is deemed to include all applicable taxes, fees, and levies.Financial

    The contract price shall be deemed to include taxes, rates, and fees of any kind that may be applicablep. 21✓

    Spanish original

    En el precio del contrato se considerarán incluidos los tributos, tasas y cánones de cualquier índole que sean de aplicación

    all-inclusive pricing covers all taxes, fees, and levies

  23. Medium

    Clause 5.2: Contract price covers all expenses incurred by the contractor in fulfilling tender obligations.Commercial

    as well as all expenses incurred by the successful bidder as a consequence of fulfilling the obligations set forth in the specifications.p. 21✓

    Spanish original

    todos los gastos que se originen para el adjudicatario como consecuencia del cumplimiento de las obligaciones contempladas en el pliego.

    all compliance and execution expenses borne within contract price

  24. Medium

    Clause 12.2: Variants must follow the format established in Annex III and must not exceed the maximum contract budget.Commercial

    Variants shall be submitted in the manner established in this same Annex and may not exceed the maximum contract budget.p. 26✓

    Spanish original

    Las variantes se presentarán en la forma establecida en este mismo Anexo y no podrán superar el presupuesto máximo del contrato.

    variants capped at maximum contract budget ceiling

  25. Medium

    Clause 12.2: Total economic offer price must encompass all expenses arising from the contract, including taxes.Financial

    The total price of the economic offer shall comprise all types of expenses derived from the contract, including tax expenses.p. 26✓

    Spanish original

    El precio total de la oferta económica comprenderá toda clase de gastos derivados del contrato, incluidos los fiscales.

    all-inclusive pricing including all contract and tax expenses

  26. Medium

    Clause 12.2: Total contracted amount may not increase due to itemizing the passed-on VAT or IGIC tax.Financial

    without the total contracted amount undergoing an increase as a result of stating the passed-on tax.p. 26✓

    Spanish original

    sin que el importe global contratado experimente incremento como consecuencia de la consignación del tributo repercutido.

    hard cap preventing contract price increase from tax itemization

  27. Medium

    Clause 12.2: Economic proposals with omissions, errors, or cross-outs preventing clarity on fundamental matters will not be accepted.Commercial

    Those proposals that contain omissions, errors, or erasures that prevent clear understanding of what the Mutua considers fundamental to consider the offer will not be accepted.p. 26✓

    Spanish original

    No se aceptarán aquellas proposiciones que tengan omisiones, errores o tachaduras que impidan conocer claramente lo que la Mutua estime fundamental para considerar la oferta.

    rejection risk for unclear omissions, errors, or cross-outs

  28. Medium

    Clause 12.2: Economic offer must itemize VAT or IGIC separately per the annex model and include the offer for each lot.Commercial

    The economic offer must in all cases include as an independent item the corresponding tax (VAT or IGIC), in accordance with the template annexed to the specifications, and must contain, where applicable, the offer made for each lot.p. 26✓

    Spanish original

    La oferta económica deberá comprender en todo caso como partida independiente el impuesto correspondiente (IVA o IGIC), de acuerdo con el modelo anexo al pliego, y deberá contener, en su caso, la oferta que por cada lote se realice.

    routine tax itemization and lot-by-lot pricing instruction

  29. Medium

    The contract will be awarded to the proposal offering the best quality-price ratio per Annex XI, without necessarily selecting the lowest price.Commercial

    the contracting authority shall award the contract to the tender with the best price-quality ratio, without necessarily taking into account its economic valuep. 30✓

    Spanish original

    el órgano de contratación adjudicará el contrato a la proposición con mejor relación calidad-precio, sin atender necesariamente el valor económico de la misma

    multi-criteria quality-price award basis

  30. Medium

    The four-month award deadline is extended by 15 working days when abnormally low offer justification proceedings under Art. 149.4 LCSP are required.Commercial

    proceedings referred to in paragraph 4 of article 149 of the LCSP (justification of abnormally low tenders).p. 31✓

    Spanish original

    trámites a que se refiere el apartado 4 del artículo 149 de la LCSP (justificación de ofertas anormalmente bajas).

    abnormally low price justification exposure

  31. Medium

    Clause 27.2.g: Article 205 modifications resulting individually or jointly in price changes exceeding +/- 20% of the initial price (excl. VAT) trigger termination.Commercial

    when, the circumstances established in Article 205 being present, the modifications imply, individually or jointly, alterations to its price in an amount exceeding, upward or downward, 20 percent of the initial contract pricep. 41✓

    Spanish original

    cuando dándose las circunstancias establecidas en el artículo 205, las modificaciones impliquen, aislada o conjuntamente, alteraciones del precio del mismo, en cuantía superior, en más o en menos, al 20 por ciento del precio inicial del contrato

    termination if modifications exceed +/- 20% of initial price

  32. Medium

    Clause 27.2.j: Reaching the awarded contract value before expiration of the contract duration is grounds for termination.Commercial

    Having reached the award amount prior to the expiration of the contract duration term shall be grounds for termination of the contractp. 42✓

    Spanish original

    Será causa de resolución del contrato el haber alcanzado el importe de adjudicación antes del vencimiento del plazo de duración del contrato

    early termination if awarded budget ceiling is exhausted

  33. Medium

    Clause 27.2.j: Where extensions are executed, reaching the extension budget ceiling before expiry of the extension period triggers termination.Commercial

    in the event that the planned extension or extensions of the contract have been executed, having reached, prior to the expiration of the extension, the amount planned for it.p. 42✓

    Spanish original

    caso de haberse ejecutado la prórroga o prórrogas previstas del contrato, haber alcanzado, antes del vencimiento de la prórroga, el importe previsto para la misma.

    early termination if extension budget ceiling is reached early

  34. Low

    Price adjustment / revision rules are governed by Clause 23 (details in omitted pages 5-45).Commercial

    23. Price revisionp. 2✓

    Spanish original

    23. Revisión de precios

    standard price revision regime reference

  35. Low

    Contract cost breakdown structure is established in Annex XII (details in omitted pages 5-45).Financial

    Annex XII Cost breakdownp. 3✓

    Spanish original

    Anexo XII Desglose costes

    routine cost breakdown structure reference

  36. Low

    Lot 3 pricing must distinguish between items taxed at 10% VAT (€12,768.90 excl. VAT / €14,045.79 incl. VAT) and items taxed at 21% VAT (€6,338.20 excl. VAT / €7,669.22 incl. VAT).Financial

    6.338,20 €p. 4

    routine dual-rate VAT invoicing breakdown

  37. Low

    Total Base Tender Budget (PBL) across all 11 lots is €402,893.78 excl. VAT and €443,880.36 incl. VAT.Financial

    443.880,36 €p. 4

    routine aggregate base tender budget ceiling

  38. Low

    Aggregate maximum contract limit across all lots (including base, extensions, and 20% modifications) is €1,661,077.03 excl. VAT and €1,830,112.98 incl. VAT.Financial

    €1,830,112.98p. 4

    Spanish original

    1.830.112,98 €

    aggregate contract ceiling across all lots and options

  39. Low

    The contract foresees up to three extension periods (Prórroga 1, Prórroga 2, and Prórroga 3) totaling €1,177,604.50 excluding VAT (€1,297,456.55 including VAT).Commercial

    €1,177,604.50p. 4

    Spanish original

    1.177.604,50 €

    contract extension budget allocation

  40. Low

    The third contract extension (Prórroga 3) totals €371,816.94, reflecting a 50% reduced extension budget for Lots 4, 6, 7, 9, 10, and 11 compared to Prórroga 1 and 2.Commercial

    €371,816.94p. 4

    Spanish original

    371.816,94 €

    partial third extension budget structure

  41. Low

    The combined Base Tender Budget plus all three extensions totals €1,580,498.28 excluding VAT (€1,741,336.91 including VAT).Commercial

    €1,580,498.28p. 4

    Spanish original

    1.580.498,28 €

    combined base and extension budget ceiling

  42. Low

    Lot 3 (bone cements) applies split VAT rates: 21% VAT on €6,338.20 (€7,669.22 incl. VAT) and 10% VAT on €12,768.90 (€14,045.79 incl. VAT), whereas all other lots apply 10% VAT.Commercial

    €6,338.20p. 4

    Spanish original

    6.338,20 €

    dual-rate VAT calculation requirement for Lot 3

  43. Low

    Lot 1 Base Tender Budget (PBL) is capped at €9,454.50 including 10% VAT (€8,595.00 excluding VAT).Commercial

    €9,454.50p. 4

    Spanish original

    9.454,50 €

    standard per-lot base tender budget cap

  44. Low

    Lot 2 Base Tender Budget (PBL) is capped at €106,755.00 including 10% VAT (€97,050.00 excluding VAT).Commercial

    €106,755.00p. 4

    Spanish original

    106.755,00 €

    standard per-lot base tender budget cap

  45. Low

    Lot 3 Base Tender Budget (PBL) is capped at €21,715.01 including VAT (€19,107.10 excluding VAT).Commercial

    €21,715.01p. 4

    Spanish original

    21.715,01 €

    standard per-lot base tender budget cap

  46. Low

    Lot 4 Base Tender Budget (PBL) is capped at €15,664.00 including 10% VAT (€14,240.00 excluding VAT).Commercial

    €15,664.00p. 4

    Spanish original

    15.664,00 €

    standard per-lot base tender budget cap

  47. Low

    Lot 5 Base Tender Budget (PBL) is capped at €167,406.80 including 10% VAT (€152,188.00 excluding VAT).Commercial

    €167,406.80p. 4

    Spanish original

    167.406,80 €

    standard per-lot base tender budget cap

  48. Low

    Lot 6 Base Tender Budget (PBL) is capped at €2,530.00 including 10% VAT (€2,300.00 excluding VAT).Commercial

    €2,530.00p. 4

    Spanish original

    2.530,00 €

    standard per-lot base tender budget cap

  49. Low

    Lot 7 Base Tender Budget (PBL) is capped at €6,903.51 including 10% VAT (€6,275.92 excluding VAT).Commercial

    €6,903.51p. 4

    Spanish original

    6.903,51 €

    standard per-lot base tender budget cap

  50. Low

    Lot 8 Base Tender Budget (PBL) is capped at €70,180.00 including 10% VAT (€63,800.00 excluding VAT).Commercial

    €70,180.00p. 4

    Spanish original

    70.180,00 €

    standard per-lot base tender budget cap

  51. Low

    Lot 9 Base Tender Budget (PBL) is capped at €4,566.76 including 10% VAT (€4,151.60 excluding VAT).Commercial

    €4,566.76p. 4

    Spanish original

    4.566,76 €

    standard per-lot base tender budget cap

  52. Low

    Lot 10 Base Tender Budget (PBL) is capped at €25,487.00 including 10% VAT (€23,170.00 excluding VAT).Commercial

    €25,487.00p. 4

    Spanish original

    25.487,00 €

    standard per-lot base tender budget cap

  53. Low

    Lot 11 Base Tender Budget (PBL) is capped at €13,217.78 including 10% VAT (€12,016.16 excluding VAT).Commercial

    €13,217.78p. 4

    Spanish original

    13.217,78 €

    standard per-lot base tender budget cap

  54. Low

    All expenses incurred for delivering evaluation samples must be borne by the bidder.Financial

    All expenses incurred by the delivery of samples shall be borne by the bidder.p. 6✓

    Spanish original

    Todos los gastos ocasionados por la entrega de muestras serán a cargo del licitador.

    minor sample shipping cost borne by bidder

  55. Low

    The total estimated value of the contract is €1,661,077.03 excluding taxes.Commercial

    €1,661,077.03, taxes excludedp. 6✓

    Spanish original

    1.661.077,03€, impuestos excluidos

    overall estimated contract value ceiling

  56. Low

    Lot 1 maximum estimated value / ceiling is €36,099.00 excluding VAT (€39,708.90 including VAT).Commercial

    €36,099.00p. 6

    Spanish original

    36.099,00 €

    standard per-lot maximum contract value ceiling

  57. Low

    Lot 2 maximum estimated value / ceiling is €407,610.00 excluding VAT (€448,371.00 including VAT).Commercial

    €407,610.00p. 6

    Spanish original

    407.610,00 €

    standard per-lot maximum contract value ceiling

  58. Low

    Lot 3 maximum estimated value / ceiling is €80,249.82 excluding VAT (€91,203.04 including VAT).Commercial

    €80,249.82p. 6

    Spanish original

    80.249,82 €

    standard per-lot maximum contract value ceiling

  59. Low

    Lot 4 maximum estimated value / ceiling is €52,688.00 excluding VAT (€57,956.80 including VAT).Commercial

    €52,688.00p. 6

    Spanish original

    52.688,00 €

    standard per-lot maximum contract value ceiling

  60. Low

    Lot 5 maximum estimated value / ceiling is €639,189.60 excluding VAT (€703,108.56 including VAT).Commercial

    €639,189.60p. 6

    Spanish original

    639.189,60 €

    standard per-lot maximum contract value ceiling

  61. Low

    Lot 6 maximum estimated value / ceiling is €8,510.00 excluding VAT (€9,361.00 including VAT).Commercial

    €8,510.00p. 6

    Spanish original

    8.510,00 €

    standard per-lot maximum contract value ceiling

  62. Low

    Lot 7 maximum estimated value / ceiling is €23,220.90 excluding VAT (€25,542.99 including VAT).Commercial

    €23,220.90p. 6

    Spanish original

    23.220,90 €

    standard per-lot maximum contract value ceiling

  63. Low

    Lot 8 maximum estimated value / ceiling is €267,960.00 excluding VAT (€294,756.00 including VAT).Commercial

    €267,960.00p. 6

    Spanish original

    267.960,00 €

    standard per-lot maximum contract value ceiling

  64. Low

    Lot 9 maximum estimated value / ceiling is €15,360.92 excluding VAT (€16,897.01 including VAT).Commercial

    €15,360.92p. 6

    Spanish original

    15.360,92 €

    standard per-lot maximum contract value ceiling

  65. Low

    Lot 10 maximum estimated value / ceiling is €85,729.00 excluding VAT (€94,301.90 including VAT).Commercial

    €85,729.00p. 6

    Spanish original

    85.729,00 €

    standard per-lot maximum contract value ceiling

  66. Low

    Lot 11 maximum estimated value / ceiling is €44,459.79 excluding VAT (€48,905.78 including VAT).Commercial

    €44,459.79p. 6

    Spanish original

    44.459,79 €

    standard per-lot maximum contract value ceiling

  67. Low

    Item 1.1 requires 0.5 cc nanohydroxyapatite bone substitute at a maximum unit price of €205.00 excl. VAT (€225.50 incl. 10% VAT), with 0 estimated annual units.Commercial

    1.1 Bone substitute with nanohydroxyapatite. 0.5 cc 205.00 € 10% 225.50 € 0 0.00 € 0.00 €p. 7✓

    Spanish original

    1.1 Sustitutivo óseo con nanohidroxiapatita. 0,5 cc 205,00 € 10% 225,50 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  68. Low

    Item 1.2 requires 1 cc nanohydroxyapatite bone substitute at a maximum unit price of €235.00 excl. VAT (€258.50 incl. 10% VAT), with 0 estimated annual units.Commercial

    1.2 Bone substitute with nanohydroxyapatite. 1 cc 235.00 € 10% 258.50 € 0 0.00 € 0.00 €p. 7✓

    Spanish original

    1.2 Sustitutivo óseo con nanohidroxiapatita. 1 cc 235,00 € 10% 258,50 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  69. Low

    Item 1.3 requires 2 cc nanohydroxyapatite bone substitute at a maximum unit price of €280.00 excl. VAT (€308.00 incl. 10% VAT), with 0 estimated annual units.Commercial

    1.3 Bone substitute with nanohydroxyapatite. 2 cc 280.00 € 10% 308.00 € 0 0.00 € 0.00 €p. 7✓

    Spanish original

    1.3 Sustitutivo óseo con nanohidroxiapatita. 2 cc 280,00 € 10% 308,00 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  70. Low

    Item 1.4 requires 2.5 cc nanohydroxyapatite bone substitute at a maximum unit price of €300.00 excl. VAT (€330.00 incl. 10% VAT), with 0 estimated annual units.Commercial

    1.4 Bone substitute with nanohydroxyapatite. 2.5 cc 300.00 € 10% 330.00 € 0 0.00 € 0.00 €p. 7✓

    Spanish original

    1.4 Sustitutivo óseo con nanohidroxiapatita. 2,5 cc 300,00 € 10% 330,00 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  71. Low

    Item 1.5 requires 5 cc nanohydroxyapatite bone substitute at a maximum unit price of €605.00 excl. VAT (€665.50 incl. 10% VAT), with 0 estimated annual units.Commercial

    1.5 Bone substitute with nanohydroxyapatite. 5 cc 605.00 € 10% 665.50 € 0 0.00 € 0.00 €p. 7✓

    Spanish original

    1.5 Sustitutivo óseo con nanohidroxiapatita. 5 cc 605,00 € 10% 665,50 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  72. Low

    Item 1.6 requires 5 cc nanohydroxyapatite bone substitute in a two-unit package at a maximum unit price of €1,025.00 excl. VAT (€1,127.50 incl. 10% VAT), with 0 estimated annual units.Commercial

    1.6 Bone substitute with nanohydroxyapatite. 5 cc. Package of two units 1,025.00 € 10% 1,127.50 € 0 0.00 € 0.00 €p. 7✓

    Spanish original

    1.6 Sustitutivo óseo con nanohidroxiapatita. 5 cc. Envase de dos unidades 1.025,00 € 10% 1.127,50 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  73. Low

    Item 1.7 requires 5 cc calcium sulfate bone substitute at a maximum unit price of €315.00 excl. VAT (€346.50 incl. 10% VAT), with 3 estimated annual units.Commercial

    1.7 Bone substitute with calcium sulfate. 5 cc 315.00 € 10% 346.50 € 3 945.00 € 1,039.50 €p. 7✓

    Spanish original

    1.7 Sustitutivo óseo con sulfato de calcio. 5 cc 315,00 € 10% 346,50 € 3 945,00 € 1.039,50 €

    routine line-item specification and price cap

  74. Low

    Item 1.8 requires 10 cc calcium sulfate bone substitute at a maximum unit price of €500.00 excl. VAT (€550.00 incl. 10% VAT), with 13 estimated annual units.Commercial

    1.8 Bone substitute with calcium sulfate. 10 cc 500.00 € 10% 550.00 € 13 6,500.00 € 7,150.00 €p. 7✓

    Spanish original

    1.8 Sustitutivo óseo con sulfato de calcio. 10 cc 500,00 € 10% 550,00 € 13 6.500,00 € 7.150,00 €

    routine line-item specification and price cap

  75. Low

    Item 1.9 requires 20 cc calcium sulfate bone substitute at a maximum unit price of €890.00 excl. VAT (€979.00 incl. 10% VAT), with 0 estimated annual units.Commercial

    1.9 Bone substitute with calcium sulfate. 20 cc 890.00 € 10% 979.00 € 0 0.00 € 0.00 €p. 7✓

    Spanish original

    1.9 Sustitutivo óseo con sulfato de calcio. 20 cc 890,00 € 10% 979,00 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  76. Low

    Item 1.10 requires a calcium sulfate pellet preparation and introduction kit at a maximum unit price of €1,150.00 excl. VAT (€1,265.00 incl. 10% VAT), with 1 estimated annual unit.Commercial

    1.10 Preparation and insertion kit for calcium sulfate pellets. 1,150.00 € 10% 1,265.00 € 1 1,150.00 € 1,265.00 €p. 7✓

    Spanish original

    1.10 Kit de elaboración e introducción de balas de sulfato de calcio. 1.150,00 € 10% 1.265,00 € 1 1.150,00 € 1.265,00 €

    routine line-item specification and price cap

  77. Low

    Item 2.1 requires 2 cc S53P4 Bioglass bone substitute at a maximum unit price of €750.00 excl. VAT (€825.00 incl. 10% VAT), with 13 estimated annual units.Commercial

    2.1 S53P4 Bioglass bone substitute. 2 cc 750.00 € 10% 825.00 € 13 9,750.00 € 10,725.00 €p. 7✓

    Spanish original

    2.1 Sustitutivo óseo de Biovidrio S53P4. 2 cc 750,00 € 10% 825,00 € 13 9.750,00 € 10.725,00 €

    routine line-item specification and price cap

  78. Low

    Item 2.2 requires 5 cc S53P4 Bioglass bone substitute (small granules) at a maximum unit price of €1,200.00 excl. VAT (€1,320.00 incl. 10% VAT), with 42 estimated annual units.Commercial

    2.2 S53P4 Bioglass bone substitute. 5 cc (small granules) 1,200.00 € 10% 1,320.00 € 42 50,400.00 € 55,440.00 €p. 7✓

    Spanish original

    2.2 Sustitutivo óseo de Biovidrio S53P4. 5 cc (gránulos pequeños) 1.200,00 € 10% 1.320,00 € 42 50.400,00 € 55.440,00 €

    routine line-item specification and price cap

  79. Low

    Item 2.3 requires 5 cc S53P4 Bioglass bone substitute (large granules) at a maximum unit price of €1,200.00 excl. VAT (€1,320.00 incl. 10% VAT), with 2 estimated annual units.Commercial

    2.3 S53P4 Bioglass bone substitute. 5 cc (large granules) 1,200.00 € 10% 1,320.00 € 2 2,400.00 € 2,640.00 €p. 7✓

    Spanish original

    2.3 Sustitutivo óseo de Biovidrio S53P4. 5 cc (gránulos grandes) 1.200,00 € 10% 1.320,00 € 2 2.400,00 € 2.640,00 €

    routine line-item specification and price cap

  80. Low

    Item 2.4 requires 10 cc S53P4 Bioglass bone substitute at a maximum unit price of €1,500.00 excl. VAT (€1,650.00 incl. 10% VAT), with 23 estimated annual units.Commercial

    2.4 S53P4 Bioglass bone substitute. 10 cc 1,500.00 € 10% 1,650.00 € 23 34,500.00 € 37,950.00 €p. 7✓

    Spanish original

    2.4 Sustitutivo óseo de Biovidrio S53P4. 10 cc 1.500,00 € 10% 1.650,00 € 23 34.500,00 € 37.950,00 €

    routine line-item specification and price cap

  81. Low

    Item 3.1 requires high-viscosity bone cement at a maximum unit price of €57.20 excl. VAT (€62.92 incl. 10% VAT), with 0 estimated annual units.Commercial

    3.1 High-viscosity bone cement. 57.20 € 10% 62.92 € 0 0.00 € 0.00 €p. 7✓

    Spanish original

    3.1 Cemento óseo viscosidad alta. 57,20 € 10% 62,92 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  82. Low

    Item 3.2 requires medium-viscosity bone cement at a maximum unit price of €71.20 excl. VAT (€78.32 incl. 10% VAT), with 24 estimated annual units.Commercial

    3.2 Medium-viscosity bone cement. 71.20 € 10% 78.32 € 24 1,708.80 € 1,879.68 €p. 7✓

    Spanish original

    3.2 Cemento óseo viscosidad media. 71,20 € 10% 78,32 € 24 1.708,80 € 1.879,68 €

    routine line-item specification and price cap

  83. Low

    Item 3.3 requires low-viscosity bone cement at a maximum unit price of €86.40 excl. VAT (€95.04 incl. 10% VAT), with 0 estimated annual units.Commercial

    3.3 Low-viscosity bone cement. 86.40 € 10% 95.04 € 0 0.00 € 0.00 €p. 7✓

    Spanish original

    3.3 Cemento óseo viscosidad baja. 86,40 € 10% 95,04 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  84. Low

    Item 3.4 requires high-viscosity bone cement with gentamicin at a maximum unit price of €87.40 excl. VAT (€96.14 incl. 10% VAT), with 0 estimated annual units.Commercial

    3.4 High-viscosity bone cement with gentamicin. 87.40 € 10% 96.14 € 0 0.00 € 0.00 €p. 7✓

    Spanish original

    3.4 Cemento óseo viscosidad alta con gentamicina. 87,40 € 10% 96,14 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  85. Low

    Item 3.5 requires medium-viscosity bone cement with gentamicin at a maximum unit price of €86.40 excl. VAT (€95.04 incl. 10% VAT), with 34 estimated annual units.Commercial

    3.5 Medium-viscosity bone cement with gentamicin. 86.40 € 10% 95.04 € 34 2,937.60 € 3,231.36 €p. 7✓

    Spanish original

    3.5 Cemento óseo viscosidad media con gentamicina. 86,40 € 10% 95,04 € 34 2.937,60 € 3.231,36 €

    routine line-item specification and price cap

  86. Low

    Item 3.6 requires low-viscosity bone cement with gentamicin at a maximum unit price of €86.40 excl. VAT (€95.04 incl. 10% VAT), with 0 estimated annual units.Commercial

    3.6 Low-viscosity bone cement with gentamicin. 86.40 € 10% 95.04 € 0 0.00 € 0.00 €p. 7✓

    Spanish original

    3.6 Cemento óseo viscosidad baja con gentamicina. 86,40 € 10% 95,04 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  87. Low

    Item 3.7 requires high-viscosity bone cement with gentamicin and clindamycin at a maximum unit price of €324.90 excl. VAT (€357.39 incl. 10% VAT), with 0 estimated annual units.Commercial

    3.7 High-viscosity bone cement with gentamicin and clindamycin. 324.90 € 10% 357.39 € 0 0.00 € 0.00 €p. 7✓

    Spanish original

    3.7 Cemento óseo viscosidad alta con gentamicina y clindamicina. 324,90 € 10% 357,39 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  88. Low

    Item 3.8 requires high-viscosity bone cement with gentamicin and vancomycin at a maximum unit price of €324.90 excl. VAT (€357.39 incl. 10% VAT), with 25 estimated annual units.Commercial

    3.8 High-viscosity bone cement with gentamicin and vancomycin. 324.90 € 10% 357.39 € 25 8,122.50 € 8,934.75 €p. 7✓

    Spanish original

    3.8 Cemento óseo viscosidad alta con gentamicina y vancomicina. 324,90 € 10% 357,39 € 25 8.122,50 € 8.934,75 €

    routine line-item specification and price cap

  89. Low

    Item 3.9 requires a vacuum mixing and application kit for bone cements at a maximum unit price of €147.40 excl. VAT (€178.35 incl. 21% VAT), with 43 estimated annual units.Commercial

    3.9 Kit for vacuum mixing and application of bone cements. 147.40 € 21% 178.35 € 43 6,338.20 € 7,669.22 €p. 7✓

    Spanish original

    3.9 Kit para la mezcla al vacío y aplicación de cementos óseos. 147,40 € 21% 178,35 € 43 6.338,20 € 7.669,22 €

    routine line-item specification and price cap

  90. Low

    Item 4.1 requires animal-origin collagen matrix at a maximum unit price of €1,780.00 excl. VAT (€1,958.00 incl. 10% VAT), with 8 estimated annual units.Commercial

    4.1 Collagen matrix of animal origin 1,780.00 € 10% 1,958.00 € 8 14,240.00 € 15,664.00 €p. 8✓

    Spanish original

    4.1 Matriz de colágeno de origen animal 1.780,00 € 10% 1.958,00 € 8 14.240,00 € 15.664,00 €

    routine line-item specification and price cap

  91. Low

    Item 5.1 requires porcine extracellular submucosa matrix (ECM) nerve connector in various lengths and diameters at a maximum unit price of €1,150.00 excl. VAT (€1,265.00 incl. 10% VAT), with 13 estimated annual units.Commercial

    5.1 Porcine extracellular submucosa matrix (ECM) connector Various lengths and ∅ 1,150.00 € 10% 1,265.00 € 13 14,950.00 € 16,445.00 €p. 8✓

    Spanish original

    5.1 Conector de matriz submucosa porcina extracelular (MEC) Diversas longitudes y ∅ 1.150,00 € 10% 1.265,00 € 13 14.950,00 € 16.445,00 €

    routine line-item specification and price cap

  92. Low

    Item 5.2 requires 20 mm porcine extracellular submucosa matrix (ECM) nerve protector in various diameters at a maximum unit price of €2,100.00 excl. VAT (€2,310.00 incl. 10% VAT), with 2 estimated annual units.Commercial

    5.2 Porcine extracellular submucosa matrix (ECM) nerve protector Length 20 mm. Various ∅ 2,100.00 € 10% 2,310.00 € 2 4,200.00 € 4,620.00 €p. 8✓

    Spanish original

    5.2 Protector nervios de matriz submucosa porcina extracelular (MEC) Longitud 20 mm. Diversos ∅ 2.100,00 € 10% 2.310,00 € 2 4.200,00 € 4.620,00 €

    routine line-item specification and price cap

  93. Low

    Item 5.3 requires 40 mm porcine extracellular submucosa matrix (ECM) nerve protector in various diameters at a maximum unit price of €2,670.00 excl. VAT (€2,937.00 incl. 10% VAT), with 20 estimated annual units.Commercial

    5.3 Porcine extracellular submucosa matrix (ECM) nerve protector Length 40 mm. Various ∅ 2,670.00 € 10% 2,937.00 € 20 53,400.00 € 58,740.00 €p. 8✓

    Spanish original

    5.3 Protector nervios de matriz submucosa porcina extracelular (MEC) Longitud 40 mm. Diversos ∅ 2.670,00 € 10% 2.937,00 € 20 53.400,00 € 58.740,00 €

    routine line-item specification and price cap

  94. Low

    Item 5.4 requires 15 mm human-origin nerve graft in various diameter ranges at a maximum unit price of €2,298.00 excl. VAT (€2,527.80 incl. 10% VAT), with 0 estimated annual units.Commercial

    5.4 Nerve graft of human origin. Length 15mm. Various ranges of ∅ 2,298.00 € 10% 2,527.80 € 0 0.00 € 0.00 €p. 8✓

    Spanish original

    5.4 Injerto de nervio origen humano. Longitud 15mm. Diversos rangos de ∅ 2.298,00 € 10% 2.527,80 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  95. Low

    Item 5.5 requires 30 mm human-origin nerve graft in various diameter ranges at a maximum unit price of €3,542.40 excl. VAT (€3,896.64 incl. 10% VAT), with 5 estimated annual units.Commercial

    5.5 Nerve graft of human origin. Length 30mm. Various ranges of ∅ 3,542.40 € 10% 3,896.64 € 5 17,712.00 € 19,483.20 €p. 8✓

    Spanish original

    5.5 Injerto de nervio origen humano. Longitud 30mm. Diversos rangos de ∅ 3.542,40 € 10% 3.896,64 € 5 17.712,00 € 19.483,20 €

    routine line-item specification and price cap

  96. Low

    Item 5.6 requires 50 mm human-origin nerve graft in various diameter ranges at a maximum unit price of €5,505.60 excl. VAT (€6,056.16 incl. 10% VAT), with 10 estimated annual units.Commercial

    5.6 Nerve graft of human origin. Length 50mm. Various ranges of ∅ 5,505.60 € 10% 6,056.16 € 10 55,056.00 € 60,561.60 €p. 8✓

    Spanish original

    5.6 Injerto de nervio origen humano. Longitud 50mm. Diversos rangos de ∅ 5.505,60 € 10% 6.056,16 € 10 55.056,00 € 60.561,60 €

    routine line-item specification and price cap

  97. Low

    Item 5.7 requires 70 mm human-origin nerve graft in various diameter ranges at a maximum unit price of €6,870.00 excl. VAT (€7,557.00 incl. 10% VAT), with 1 estimated annual unit.Commercial

    5.7 Nerve graft of human origin. Length 70mm. Various ranges of ∅ 6,870.00 € 10% 7,557.00 € 1 6,870.00 € 7,557.00 €p. 8✓

    Spanish original

    5.7 Injerto de nervio origen humano. Longitud 70mm. Diversos rangos de ∅ 6.870,00 € 10% 7.557,00 € 1 6.870,00 € 7.557,00 €

    routine line-item specification and price cap

  98. Low

    Item 6.1 requires radiopaque spinal intervention gel at a maximum unit price of €2,300.00 excl. VAT (€2,530.00 incl. 10% VAT), with 1 estimated annual unit.Commercial

    6.1 Radiopaque gel for spine interventional procedures 2,300.00 € 10% 2,530.00 € 1 2,300.00 € 2,530.00 €p. 8✓

    Spanish original

    6.1 Gel radiopaco para intervencionismo columna 2.300,00 € 10% 2.530,00 € 1 2.300,00 € 2.530,00 €

    routine line-item specification and price cap

  99. Low

    Item 7.1 requires 5 cm x 5 cm bovine type I collagen matrix for dura mater at a maximum unit price of €372.14 excl. VAT (€409.35 incl. 10% VAT), with 0 estimated annual units.Commercial

    7.1 Bovine type I collagen matrix for dura mater. 5 cm x 5 cm 372.14 € 10% 409.35 € 0 0.00 € 0.00 €p. 8✓

    Spanish original

    7.1 Matriz de colágeno bovino tipo I para duramadre. 5 cm x 5 cm 372,14 € 10% 409,35 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  100. Low

    Item 7.2 requires 7.5 cm x 7.5 cm bovine type I collagen matrix for dura mater at a maximum unit price of €625.57 excl. VAT (€688.13 incl. 10% VAT), with 0 estimated annual units.Commercial

    7.2 Bovine type I collagen matrix for dura mater. 7.5 cm x 7.5 cm 625.57 € 10% 688.13 € 0 0.00 € 0.00 €p. 8✓

    Spanish original

    7.2 Matriz de colágeno bovino tipo I para duramadre. 7,5 cm x 7,5 cm 625,57 € 10% 688,13 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  101. Low

    Item 7.3 requires 3 ml biological hydrogel sealant at a maximum unit price of €398.98 excl. VAT (€438.88 incl. 10% VAT), with 0 estimated annual units.Commercial

    7.3 Biological hydrogel sealant. 3ml 398.98 € 10% 438.88 € 0 0.00 € 0.00 €p. 8✓

    Spanish original

    7.3 Sellante biológico de hidrogel. 3ml 398,98 € 10% 438,88 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  102. Low

    Item 7.4 requires 5 ml biological hydrogel sealant at a maximum unit price of €398.98 excl. VAT (€438.88 incl. 10% VAT), with 4 estimated annual units.Commercial

    7.4 Biological hydrogel sealant. 5ml 398.98 € 10% 438.88 € 4 1,595.92 € 1,755.51 €p. 8✓

    Spanish original

    7.4 Sellante biológico de hidrogel. 5ml 398,98 € 10% 438,88 € 4 1.595,92 € 1.755,51 €

    routine line-item specification and price cap

  103. Low

    Item 7.5 requires 5 cm x 5 cm dual-membrane dermal regeneration sheet at a maximum unit price of €698.00 excl. VAT (€767.80 incl. 10% VAT), with 1 estimated annual unit.Commercial

    7.5 Dermal regeneration sheet with two membranes. 5 cm x 5 cm 698.00 € 10% 767.80 € 1 698.00 € 767.80 €p. 8✓

    Spanish original

    7.5 Lámina de regeneración dérmica de dos membranas. 5 cm x 5 cm 698,00 € 10% 767,80 € 1 698,00 € 767,80 €

    routine line-item specification and price cap

  104. Low

    Item 7.6 requires 10 cm x 12.5 cm dual-membrane dermal regeneration sheet at a maximum unit price of €1,783.00 excl. VAT (€1,961.30 incl. 10% VAT), with 0 estimated annual units.Commercial

    7.6 Dermal regeneration sheet with two membranes. 10 cm x 12.5 cm 1,783.00 € 10% 1,961.30 € 0 0.00 € 0.00 €p. 8✓

    Spanish original

    7.6 Lámina de regeneración dérmica de dos membranas. 10 cm x 12,5 cm 1.783,00 € 10% 1.961,30 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  105. Low

    Item 7.7 requires 10 cm x 25 cm dual-membrane dermal regeneration sheet at a maximum unit price of €2,724.00 excl. VAT (€2,996.40 incl. 10% VAT), with 0 estimated annual units.Commercial

    7.7 Dermal regeneration sheet with two membranes. 10 cm x 25 cm 2,724.00 € 10% 2,996.40 € 0 0.00 € 0.00 €p. 8✓

    Spanish original

    7.7 Lámina de regeneración dérmica de dos membranas. 10 cm x 25 cm 2.724,00 € 10% 2.996,40 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  106. Low

    Item 7.8 requires 20 cm x 25 cm dual-membrane dermal regeneration sheet at a maximum unit price of €5,398.00 excl. VAT (€5,937.80 incl. 10% VAT), with 0 estimated annual units.Commercial

    7.8 Dermal regeneration sheet with two membranes. 20 cm x 25 cm 5,398.00 € 10% 5,937.80 € 0 0.00 € 0.00 €p. 8✓

    Spanish original

    7.8 Lámina de regeneración dérmica de dos membranas. 20 cm x 25 cm 5.398,00 € 10% 5.937,80 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  107. Low

    Item 7.9 requires 5 cm x 5 cm single-membrane dermal regeneration sheet at a maximum unit price of €622.00 excl. VAT (€684.20 incl. 10% VAT), with 0 estimated annual units.Commercial

    7.9 Dermal regeneration sheet with one membrane. 5 cm x 5 cm 622.00 € 10% 684.20 € 0 0.00 € 0.00 €p. 8✓

    Spanish original

    7.9 Lámina de regeneración dérmica de una membrana. 5 cm x 5 cm 622,00 € 10% 684,20 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  108. Low

    Item 7.10 requires 10 cm x 12.5 cm single-membrane dermal regeneration sheet at a maximum unit price of €1,486.00 excl. VAT (€1,634.60 incl. 10% VAT), with 1 estimated annual unit.Commercial

    7.10 Dermal regeneration sheet with one membrane. 10 cm x 12.5 cm 1,486.00 € 10% 1,634.60 € 1 1,486.00 € 1,634.60 €p. 8✓

    Spanish original

    7.10 Lámina de regeneración dérmica de una membrana. 10 cm x 12,5 cm 1.486,00 € 10% 1.634,60 € 1 1.486,00 € 1.634,60 €

    routine line-item specification and price cap

  109. Low

    Item 7.11 requires 10 cm x 25 cm single-membrane dermal regeneration sheet at a maximum unit price of €2,496.00 excl. VAT (€2,745.60 incl. 10% VAT), with 1 estimated annual unit.Commercial

    7.11 Dermal regeneration sheet with one membrane. 10 cm x 25 cm 2,496.00 € 10% 2,745.60 € 1 2,496.00 € 2,745.60 €p. 8✓

    Spanish original

    7.11 Lámina de regeneración dérmica de una membrana. 10 cm x 25 cm 2.496,00 € 10% 2.745,60 € 1 2.496,00 € 2.745,60 €

    routine line-item specification and price cap

  110. Low

    Item 7.12 requires 20 cm x 25 cm single-membrane dermal regeneration sheet at a maximum unit price of €5,036.00 excl. VAT (€5,539.60 incl. 10% VAT), with 0 estimated annual units.Commercial

    7.12 Dermal regeneration sheet with one membrane. 20 cm x 25 cm 5,036.00 € 10% 5,539.60 € 0 0.00 € 0.00 €p. 8✓

    Spanish original

    7.12 Lámina de regeneración dérmica de una membrana. 20 cm x 25 cm 5.036,00 € 10% 5.539,60 € 0 0,00 € 0,00 €

    routine line-item specification and price cap

  111. Low

    The value of potential contract modifications is estimated at €80,578.75 excluding taxes over the full duration of the contract, including extensions.Commercial

    The amount of modifications that may be made is estimated at €80,578.75, taxes excluded, throughout the entire term of the contract, extensions included.p. 9✓

    Spanish original

    El importe de las modificaciones que puedan realizarse se estima en 80.578,75€, impuestos excluidos, durante toda la vigencia del contrato, prórrogas incluidas.

    estimated modification ceiling over contract duration

  112. Low

    Item 8.1 requires bioinductive bovine-origin type I collagen implants in various sizes, capped at €1,950.00/unit excl. VAT (€2,145.00 incl. 10% VAT) for an estimated annual consumption of 19 units (€37,050.00 excl. VAT).Commercial

    Bioinductive bovine-origin type I collagen implant. Various sizesp. 9✓

    Spanish original

    Implante colágeno tipo I origen bovino bioinductivo. Varias medidas

    routine supply item with maximum unit price cap

  113. Low

    Item 10.1 requires 5 ml synthetic hydroxyapatite and calcium sulfate bone substitute, capped at €820.00/unit excl. VAT (€902.00 incl. 10% VAT) for an estimated annual consumption of 6 units (€4,920.00 excl. VAT).Commercial

    Synthetic bone substitute of hydroxyapatite and calcium sulfate. 5 mlp. 9✓

    Spanish original

    Sustitutivo óseo sintético de hidroxiapatita y sulfato cálcico. 5 ml

    routine supply item with maximum unit price cap

  114. Low

    Item 10.2 requires 10 ml synthetic hydroxyapatite and calcium sulfate bone substitute, capped at €1,065.00/unit excl. VAT (€1,171.50 incl. 10% VAT) for an estimated annual consumption of 7 units (€7,455.00 excl. VAT).Commercial

    Synthetic bone substitute of hydroxyapatite and calcium sulfate. 10 mlp. 9✓

    Spanish original

    Sustitutivo óseo sintético de hidroxiapatita y sulfato cálcico. 10 ml

    routine supply item with maximum unit price cap

  115. Low

    Item 10.3 requires 5 ml synthetic hydroxyapatite, calcium sulfate, and gentamicin bone substitute, capped at €1,135.00/unit excl. VAT (€1,248.50 incl. 10% VAT) for an estimated annual consumption of 2 units (€2,270.00 excl. VAT).Commercial

    Synthetic bone substitute of hydroxyapatite, calcium sulfate and gentamicin. 5mlp. 9✓

    Spanish original

    Sustitutivo óseo sintético de hidroxiapatita, sulfato cálcico y gentamicina. 5ml

    routine supply item with maximum unit price cap

  116. Low

    Item 10.4 requires 10 ml synthetic hydroxyapatite, calcium sulfate, and gentamicin bone substitute, capped at €1,705.00/unit excl. VAT (€1,875.50 incl. 10% VAT) for an estimated annual consumption of 3 units (€5,115.00 excl. VAT).Commercial

    Synthetic bone substitute of hydroxyapatite, calcium sulfate and gentamicin. 10mlp. 9✓

    Spanish original

    Sustitutivo óseo sintético de hidroxiapatita, sulfato cálcico y gentamicina. 10ml

    routine supply item with maximum unit price cap

  117. Low

    Item 10.5 requires 10 ml synthetic hydroxyapatite, calcium sulfate, and vancomycin bone substitute, capped at €1,705.00/unit excl. VAT (€1,875.50 incl. 10% VAT) for an estimated annual consumption of 2 units (€3,410.00 excl. VAT).Commercial

    Synthetic bone substitute of hydroxyapatite, calcium sulfate and vancomycin. 10mlp. 9✓

    Spanish original

    Sustitutivo óseo sintético de hidroxiapatita, sulfato cálcico y vancomicina. 10ml

    routine supply item with maximum unit price cap

  118. Low

    Item 11.1 requires approx. 20 mm x 30 mm cartilage regenerators, capped at €1,502.02/unit excl. VAT (€1,652.22 incl. 10% VAT) for an estimated annual consumption of 8 units (€12,016.16 excl. VAT).Commercial

    Cartilage regenerator. Approx. 20 mm x 30 mmp. 9✓

    Spanish original

    Regenerador de cartílago. 20 mm x 30 mm aprox.

    routine supply item with maximum unit price cap

  119. Low

    Item 11.2 requires approx. 30 mm x 40 mm cartilage regenerators, capped at €1,520.00/unit excl. VAT (€1,672.00 incl. 10% VAT), with 0 estimated annual consumption.Commercial

    Cartilage regenerator. Approx. 30 mm x 40 mmp. 9✓

    Spanish original

    Regenerador de cartílago. 30 mm x 40 mm aprox.

    routine supply item with maximum unit price cap

  120. Low

    Item 11.3 requires approx. 40 mm x 50 mm cartilage regenerators, capped at €1,542.00/unit excl. VAT (€1,696.20 incl. 10% VAT), with 0 estimated annual consumption.Commercial

    Cartilage regenerator. Approx. 40 mm x 50 mmp. 9✓

    Spanish original

    Regenerador de cartílago. 40 mm x 50 mm aprox.

    routine supply item with maximum unit price cap

  121. Low

    Section 5.2.5: Each valued delivery note must specify delivery date, quantity and product type, ASEPEYO internal product reference, contract number, order number, item/lot line, and applicable VAT rate.Financial

    will specify: the delivery date, the quantity and type of product delivered, ASEPEYO's internal reference of the product, contract number, order number, the budget item and corresponding VAT rate.p. 9✓

    Spanish original

    especificará: la fecha de entrega, la cantidad y tipo de producto entregado, referencia interna de ASEPEYO del producto, número de contrato, número de pedido, la partida y tipo de IVA correspondiente.

    routine itemized fields on delivery notes

  122. Low

    Item 8.2 requires bioabsorbable tendon anchors, capped at €650.00/unit excl. VAT (€715.00 incl. 10% VAT) for an estimated annual consumption of 19 units (€12,350.00 excl. VAT).Commercial

    Bioabsorbable tendon anchorp. 9✓

    Spanish original

    Anclaje para tendón bioabsorbible

    routine supply item with maximum unit price cap

  123. Low

    Item 8.3 requires PEEK bone anchors, capped at €900.00/unit excl. VAT (€990.00 incl. 10% VAT) for an estimated annual consumption of 16 units (€14,400.00 excl. VAT).Commercial

    Peek bone anchorp. 9✓

    Spanish original

    Anclaje para hueso Peek

    routine supply item with maximum unit price cap

  124. Low

    Item 9.1 requires antibiotic spacers, capped at €1,037.90/unit excl. VAT (€1,141.69 incl. 10% VAT) for an estimated annual consumption of 4 units (€4,151.60 excl. VAT).Commercial

    Spacers with antibioticp. 9✓

    Spanish original

    Espaciadores con antibiótico

    routine supply item with maximum unit price cap

  125. Low

    The total annual base tender budget across all 11 lots is €402,893.78 excluding VAT (€443,880.36 including VAT).Financial

    402.893,78 €p. 9

    annual tender budget ceiling across all lots

  126. Low

    The total annual base tender budget across all 11 lots is €402,893.78 excl. VAT (€443,880.36 incl. VAT).Financial

    TOTAL €402,893.78 €443,880.36p. 9✓

    Spanish original

    TOTAL 402.893,78 € 443.880,36 €

    routine annual base budget ceiling

  127. Low

    Section 6: Invoicing delivery notes must specify delivery date, quantity and product type, ASEPEYO internal reference, contract number, order number, item/lot line, and applicable tax type.Financial

    shall specify: the delivery date, the quantity and type of product delivered, ASEPEYO's internal reference of the product, contract number, order number, the item, and the corresponding tax rate.p. 10✓

    Spanish original

    especificará: la fecha de entrega, la cantidad y tipo de producto entregado, referencia interna de ASEPEYO del producto, número de contrato, número de pedido, la partida y el tipo de impuesto correspondiente.

    routine mandatory billing and tax details on delivery note

  128. Low

    Section 6: Awarded supplier must issue an invoice for each delivery and attach the valued delivery note duly approved by the recipient.Financial

    The successful supplier shall issue the invoice corresponding to each delivery, to which it must attach the priced delivery note, duly approved by the recipient.p. 10✓

    Spanish original

    El proveedor adjudicatario emitirá la factura correspondiente a cada entrega, a la que deberá adjuntar el albarán de entrega valorado, debidamente conformado por el destinatario.

    routine per-delivery invoicing with approved delivery note

  129. Low

    Section 6: Invoices must list supplied items with ASEPEYO's internal code and the assigned ASEPEYO contract number.Financial

    The invoice must include the list of items supplied with the internal ASEPEYO code and the contract number that ASEPEYO has assigned to it.p. 10✓

    Spanish original

    La factura deberá recoger la relación de artículos suministrados con el código interno de ASEPEYO y el número de contrato que ASEPEYO le haya asignado.

    routine invoice coding and contract reference format

  130. Low

    Section 6: Invoices exceeding EUR 5,000 must be issued electronically pursuant to Law 25/2013 of 27 December on electronic invoicing and public-sector invoice accounting registration.Compliance

    Invoices exceeding €5,000 shall be issued in accordance with the provisions of Law 25/2013, of December 27, on the promotion of electronic invoicing and the creation of the accounting registry of invoices in the Public Sector.p. 10✓

    Spanish original

    Las facturas que superen los 5.000€ se realizarán según lo establecido en la Ley 25/2013, de 27 de diciembre de impulso de la factura electrónica y creación del registro contable de facturas en el Sector Público.

    statutory electronic invoicing above EUR 5,000

  131. Low

    Abnormally low bid justification may document cost savings enabled by the manufacturing process, services provided, or construction method.Commercial

    a) The savings permitted by the manufacturing process, the services provided, or the construction method.p. 11✓

    Spanish original

    a) El ahorro que permita el procedimiento de fabricación, los servicios prestados o el método de construcción.

    permitted documentary ground for low-bid justification

  132. Low

    Abnormally low bid justification may document technical solutions adopted and exceptionally favorable conditions available to supply the products or execute the contract.Technical

    b) The technical solutions adopted and the exceptionally favorable conditions available to supply the products, provide the services, or execute the works.p. 11✓

    Spanish original

    b) Las soluciones técnicas adoptadas y las condiciones excepcionalmente favorables de que disponga para suministrar los productos, prestar los servicios o ejecutar las obras.

    permitted documentary ground for low-bid justification

  133. Low

    Abnormally low bid justification may document the innovation and originality of the proposed solutions for supplying the products or executing the contract.Technical

    c) The innovation and originality of the proposed solutions to supply the products, provide the services, or execute the works.p. 11✓

    Spanish original

    c) La innovación y originalidad de las soluciones propuestas, para suministrar los productos, prestar los servicios o ejecutar las obras.

    permitted documentary ground for low-bid justification

  134. Low

    Abnormally low bid justification may document the potential receipt of State aid.Financial

    e) Or the possible receipt of State aid.p. 11✓

    Spanish original

    e) O la posible obtención de una ayuda del Estado.

    permitted documentary ground for low-bid justification

  135. Low

    Contract pricing is determined on a unit-price basis rather than a lump sum (Section H.1).Commercial

    Unit pricesp. 13✓

    Spanish original

    Precios unitarios

    routine unit pricing model

  136. Low

    Clause 4.1: Maximum contract budget is set in Section C.2 excluding applicable taxes.Financial

    The maximum budget limit for the execution of this contract is that established in section C.2 of the schedule of characteristics, excluding the corresponding taxes.p. 21✓

    Spanish original

    El presupuesto límite máximo para la ejecución del presente contrato es el que se establece en el apartado C.2 del cuadro de características, sin incluir los impuestos correspondientes.

    routine budget ceiling definition excluding taxes

  137. Low

    Clause 5.1: Contract price must state VAT, IGIC, or equivalent tax as a separate line item.Financial

    The contract price shall be that resulting from its award and must state VAT, IGIC, or equivalent tax as an independent item.p. 21✓

    Spanish original

    El precio del contrato será el que resulte de la adjudicación del mismo y deberá indicar como partida independiente el IVA, IGIC o impuesto equivalente.

    routine tax itemization requirement

  138. Low

    The estimated contract value calculated under Article 101 LCSP in Section C.1 determines the applicable tendering procedure and advertising requirements.Financial

    The estimated value of the contract, calculated in accordance with Article 101 LCSP and set out in section C.1 of the schedule of characteristics,p. 21✓

    Spanish original

    El valor estimado del contrato, calculado conforme al artículo 101 LCSP y recogido en el apartado C.1 del cuadro de características,

    routine statutory calculation of estimated value

  139. Low

    The expenditure shall be charged to the corresponding budget line specified in Section C.3 of the Characteristics Table.Financial

    The present expenditure shall be charged to the corresponding budgetary application indicated in section C.3 of the schedule of characteristics.p. 21✓

    Spanish original

    El presente gasto se imputará a la aplicación presupuestaria correspondiente, señalada en el apartado C.3 del cuadro de características.

    routine internal budget allocation rule

  140. Low

    Clause 11.2: Envelope 2 must contain the economic proposal and formula-quantifiable criteria documentation per the prescribed model.Commercial

    Envelope number 2 shall contain the documentation relating to the economic proposal and other criteria quantifiable through formulas, which shall conform to the corresponding template, with all the elements that comprise it.p. 24✓

    Spanish original

    El sobre número 2 contendrá la documentación referente a la proposición económica y demás criterios cuantificables mediante fórmulas y que se ajustará al modelo correspondiente, con todos los elementos que la integran.

    routine Envelope 2 structure and template requirement

  141. Low

    Clause 12.2: Envelope 2 must include the economic proposal and formula-based data following the Annex V template.Commercial

    Economic proposal and other information subject to automatic formulas, according to the template included in this specification (Annex V).p. 26✓

    Spanish original

    Proposición económica y demás información sometida a fórmulas automáticas, con arreglo al modelo inserto en el presente pliego (Anexo V).

    routine Annex V economic offer template requirement

  142. Low

    Clause 12.2: Bidder must include VAT or IGIC within the economic proposal and pass it on as a separate line item on collection documents.Financial

    The bidder, when formulating its economic proposal, shall include within it the corresponding Tax (VAT or IGIC) which, nevertheless, must be passed on as an independent item, when applicable, in the documents submitted for payment,p. 26✓

    Spanish original

    El oferente, al formular su propuesta económica, incluirá dentro de la misma, el Impuesto correspondiente (IVA o IGIC) que, no obstante, deberá ser repercutido como partida independiente, cuando así proceda, en los documentos que se presenten para el cobro,

    routine tax inclusion and separate invoicing requirement

  143. Low

    Clause 12.2: Each bidder may not submit more than one economic proposal.Compliance

    Each bidder may not submit more than one economic proposal.p. 26✓

    Spanish original

    Cada licitador no podrá presentar más de una proposición económica.

    routine single economic bid rule

  144. Low

    Clause 12.2: All cost breakdowns corresponding to the offer must be completed.Commercial

    All breakdowns corresponding to the tender must be completed.p. 26✓

    Spanish original

    Se deberán cumplimentar todos los desgloses correspondientes a la oferta.

    routine pricing breakdown completion requirement

  145. Low

    The economic proposal and other documentation relating to formula-quantifiable criteria must be included in Envelope 2.Commercial

    the envelopes containing the economic proposal and other documentation relating to criteria quantifiable through formulasp. 27✓

    Spanish original

    los sobres que contengan la proposición económica y demás documentación referente a los criterios cuantificables mediante fórmulas

    routine envelope organization requirement, low risk

  146. Low

    Clause 23: Price revision is governed by Section J of the characteristics summary.Commercial

    In accordance with what is established in section J of the characteristics table.p. 38✓

    Spanish original

    De acuerdo con lo establecido en el apartado J del cuadro de características.

    standard price revision reference, low risk

Financial37 rows · 9 high

  1. High

    Winning bidder is subject to definitive performance guarantee (garantía definitiva) requirements under Clause 15 (exact terms in omitted pages 5-45).Financial

    15. Final guaranteep. 2✓

    Spanish original

    15. Garantía definitiva

    performance bond financial exposure upon award

  2. High

    The proposed awardee must constitute the applicable financial guarantee within the ten-working-day post-selection request period.Financial

    as well as constitute the guarantee that, if applicable, may be appropriatep. 29✓

    Spanish original

    así como constituir la garantía que, en su caso, sea procedente

    performance guarantee security requirement

  3. High

    When provided for in the summary schedule (cuadro de características), the awardee must constitute a definitive guarantee within ten working days of receiving the contracting authority's request.Financial

    The successful tenderer may constitute at the disposal of Asepeyo, and within ten business days counting from receipt of the request sent by the contracting authority, a definitive guaranteep. 31✓

    Spanish original

    El adjudicatario podrá constituir a disposición de Asepeyo, y en el plazo de diez días hábiles a contar desde la recepción del requerimiento remitido por el órgano de contratación, una garantía definitiva

    mandatory performance guarantee within 10 working days

  4. High

    If contract modification alters total contract value, the guarantee must be readjusted within 15 calendar days of modification notice to maintain proportionality.Financial

    the guarantee constituted shall be readjusted within 15 calendar days, from the date of notification to the contractor of the modification agreement, by the amount necessary to maintain the proper proportionalityp. 31✓

    Spanish original

    se reajustará en el plazo de 15 días naturales, a partir de la fecha de la notificación al empresario del acuerdo de modificación, la garantía constituida en la cuantía necesaria para que se mantenga la debida proporcionalidad

    mandatory bond top-up within 15 calendar days

  5. High

    Complementary guarantees of up to 5% of the contract price may be established in special cases, allowing total guarantees to reach 10% of the contract price.Financial

    Likewise, a system of complementary guarantees, up to 5 percent of the contract price, may be established in special cases, with the total guarantee being able to reach 10 percent of the contract price.p. 31✓

    Spanish original

    Se podrá, asimismo, establecer un sistema de garantías complementarias, de hasta un 5 por 100 del precio del contrato, en casos especiales, pudiendo alcanzar la garantía total un 10 por ciento del precio del contrato.

    complementary bond exposure up to 10% of contract price

  6. High

    Clause 20.3.2: Delay penalties will be deducted directly from the contractor's submitted invoices until fully settled.Financial

    Said penalty shall be deducted from the invoices submitted by the company until the imposed penalty has been settled.p. 37✓

    Spanish original

    Dicha penalización será detraída de las facturaciones que presente la empresa hasta quedar saldada la penalización impuesta.

    automatic penalty set-off against contractor invoices

  7. High

    Clause 20.3.4: To pay an imposed penalty, contractor must issue a credit invoice and deposit the amount into the bank account designated by the Mutua.Financial

    For the payment of the financial amount to which the penalty amounts, the company must issue the corresponding credit invoice, depositing the corresponding amount into the bank account designated for that purpose by the Mutua.p. 38✓

    Spanish original

    Para el pago del importe económico al que ascienda la penalidad, la empresa deberá emitir la correspondiente factura de abono, ingresando el importe correspondiente en la cuenta bancaria que al efecto designe la Mutua.

    mandatory credit invoice and direct penalty payment

  8. High

    Clause 28.1: After the warranty period expires with no liabilities, the guarantee (bank guarantee, surety insurance, or cash deposit at Caja General de Depósitos) is returned or cancelled.Financial

    Once the warranty period has elapsed, if no liabilities arise, the guarantee constituted shall be returned or the bank guarantee, surety insurance, or cash deposit (deposited with the General Deposit Fund) shall be canceled.p. 42✓

    Spanish original

    Transcurrido el plazo de garantía, si no resultaren responsabilidades se devolverá la garantía constituida o se cancelará el aval, seguro de caución, o depósito en efectivo (depositado en la Caja General de Depósitos).

    performance guarantee held through warranty period against liabilities

  9. High

    Clause 28.1: The definitive guarantee will not be returned or cancelled until expiry of the warranty period and satisfactory contract performance (or fault-free termination).Financial

    The guarantee shall not be returned or canceled until the expiration of the warranty period has occurred and the contract has been satisfactorily fulfilledp. 42✓

    Spanish original

    La garantía no será devuelta o cancelada hasta que se haya producido el vencimiento del plazo de garantía y cumplido satisfactoriamente el contrato

    guarantee withheld until warranty expiry and satisfactory completion

  10. Medium

    If requested, financial guarantee must be furnished using the bank guarantee or surety insurance template in Annex IV.4.Financial

    Annex IV.4 Bank guarantee / surety insurance template, in case it is requestedp. 3✓

    Spanish original

    Anexo IV.4 Modelo de aval / seguro de caución, en caso que se solicite

    conditional financial guarantee instrument if requested

  11. Medium

    Execution for fiscal years subsequent to the current year is subject to the condition precedent of adequate and sufficient credit existing in Asepeyo's expenditure budget.Financial

    its performance for the financial years following the current one is subject to the condition precedent of the existence of adequate and sufficient credit in Asepeyo's expenditure budget.p. 10✓

    Spanish original

    queda supeditada la ejecución del mismo para los ejercicios siguientes al actual a la condición suspensiva de existencia de crédito adecuado y suficiente en el presupuesto de gastos de Asepeyo.

    subsequent-year execution conditional on budget credit availability

  12. Medium

    The proposed awardee must submit capacity and solvency documentation per Annex IV within ten working days of receiving the request.Financial

    of capacity and solvency indicated in Annex IV of this specification, within a period of ten working days counted from the day following that on which it received the requestp. 29✓

    Spanish original

    de capacidad y solvencia indicada en el anexo IV del presente pliego, en el plazo de diez días hábiles a contar desde el siguiente a aquél en que hubiere recibido el requerimiento

    firm 10-working-day deadline for solvency documentation

  13. Medium

    Clause 19: Contractor must bear expenses and taxes from tender and award notices up to the maximum amount stated in Section F of the characteristics summary.Financial

    The expenses and taxes arising from the tender and award notices, up to the maximum amount indicated in section F of the characteristics table, shall be borne by the contractorp. 36✓

    Spanish original

    Serán de cuenta del contratista los gastos e impuestos que se deriven de los anuncios de licitación y adjudicación, hasta el importe máximo indicado en el apartado F del cuadro de características

    publication fees and taxes passed to contractor

  14. Medium

    Clause 19: Contractor must bear costs arising from contract formalization and all other costs/taxes required by law.Financial

    as well as those arising from the formalization of the corresponding contract and all others required by current provisions.p. 36✓

    Spanish original

    así como los que se originen en la formalización del correspondiente contrato y todos los demás exigibles por las disposiciones vigentes.

    contract formalization expenses and taxes borne by contractor

  15. Medium

    Clause 24.5: Contractor must pay subcontractors and suppliers within the terms established in Article 216 LCSP.Financial

    The contractor must pay subcontractors or suppliers under the terms established in Article 216 of the LCSP.p. 39✓

    Spanish original

    El contratista deberá pagar a las subcontratistas o suministradoras en los términos establecidos en el artículo 216 de la LCSP.

    statutory subcontractor payment obligation, low risk

  16. Medium

    Clause 24.6: Upon contracting authority request, contractor must provide proof of timely payments within the deadlines of Article 216 LCSP and Law 3/2004.Financial

    the successful contractor must provide proof of compliance with payments within the deadlines established in Article 216 of the LCSP and in Law 3/2004, of December 29p. 40✓

    Spanish original

    el contratista adjudicatario deberá aportar justificante de cumplimiento de los pagos dentro de los plazos establecidos en el artículo 216 de la LCSP y en la Ley 3/2004, de 29 de diciembre

    routine payment proof submission on request, low risk

  17. Medium

    Clause 27.2.b: Declaration of bankruptcy or insolvency in any proceeding is grounds for contract termination.Financial

    The declaration of bankruptcy or the declaration of insolvency in any other proceeding.p. 41✓

    Spanish original

    La declaración de concurso o la declaración de insolvencia en cualquier otro procedimiento.

    insolvency triggers contract termination

  18. Low

    Invoicing and payment of the contract price are governed by Clause 22 (specific payment timeline in omitted pages 5-45).Commercial

    22. Payment of the pricep. 2✓

    Spanish original

    22. Pago del precio

    standard price payment procedure clause

  19. Low

    Return or cancellation of the definitive performance guarantee is governed by Clause 28 (details in omitted pages 5-45).Financial

    28. Return or Cancellation of the definitive guaranteep. 2✓

    Spanish original

    28. Devolución o Cancelación de la garantía definitiva

    routine performance bond release procedure

  20. Low

    The contract is processed as advance multi-year budgetary processing (tramitación anticipada) rather than ordinary current-year processing.Financial

    as it involves contracting with advance processing or multi-year expenditurep. 10✓

    Spanish original

    al tratarse de contratación con tramitación anticipada o de un gasto plurianual

    advance multi-year budgetary processing regime

  21. Low

    Lot 1 multi-year annuities at 10% VAT are €8,595.00 annual PBL excl. VAT, allocated as €6,446.25 (2027), €8,595.00/year (2028–2030), and €2,148.75 (2031, 3 months).Financial

    1 Bone substitute with nano-HA and with Ca sulfate for the hospitals of Coslada and Sant Cugat de 8,595.00 € 10% 6,446.25 € 8,595.00 € 8,595.00 € 8,595.00 € 2,148.75 €p. 10✓

    Spanish original

    1 Sustitutivo óseo con nano-HA y con sulfato Ca para los hospitales de Coslada y Sant Cugat de 8.595,00 € 10% 6.446,25 € 8.595,00 € 8.595,00 € 8.595,00 € 2.148,75 €

    routine annual budget breakdown

  22. Low

    The 2027 budgetary annuity allocation is subject to the actual contract start date.Financial

    (*) Depending on contract startp. 10✓

    Spanish original

    (*) Según inicio contrato

    routine start-date dependency for first-year budget

  23. Low

    No provisional bid guarantee under Article 106 of the LCSP is required for this tender.Financial

    Not required.p. 12

    Spanish original

    No se exige.

    no provisional bid bond required

  24. Low

    Standard lot-guarantee template provision stating that where a definitive guarantee applies to a contract divided into lots, it is calculated proportionally per awarded lot (not applicable here as definitive guarantee is marked not required).Financial

    In the event of division of the contract into lots, the amount of the definitive guarantee shall be calculated proportionally to each of the awarded lots.p. 12✓

    Spanish original

    En caso de división del contrato en lotes, el importe de la garantía definitiva se calculará de forma proporcional a cada uno de los lotes adjudicados.

    conditional boilerplate on lot-based guarantee calculation

  25. Low

    Standard lot-guarantee template provision stating a guarantee document must be submitted for each awarded lot (not applicable here as definitive guarantee is marked not required).Financial

    A guarantee document must be submitted for each awarded lot.p. 12✓

    Spanish original

    Deberá presentarse un documento de garantía por cada lote adjudicado.

    conditional boilerplate on per-lot guarantee submission

  26. Low

    No publicity or tender advertising fees are charged to bidders or the awarded contractor.Financial

    No advertising costs are requiredp. 12✓

    Spanish original

    No se exigen gastos de publicidad

    no publicity expenses payable by bidder

  27. Low

    Neither a provisional bid guarantee (Art. 106 LCSP) nor a definitive performance guarantee (Art. 114 LCSP), nor payment of advertising expenses, is required for this contract.Financial

    E.1 Provisional guarantee (Art. 106 LCSP): Not required. E.2 Definitive guarantee (Art. 114 LCSP): Not required. F.- Advertising expenses: No advertising expenses are required.p. 12

    Spanish original

    E.1 Garantía provisional (Art. 106 LCSP): No se exige. E.2 Garantía definitiva (Art. 114 LCSP): No se exige. F.- Gastos de publicidad: No se exigen gastos de publicidad.

    no guarantee or advertising fee burden

  28. Low

    Procedures have been completed to ensure budgetary credit availability for the financial obligations arising from this contract.Financial

    The precise procedures have been carried out to ensure the availability of credit to meet the financial obligations arising from this procurement.p. 22✓

    Spanish original

    Se han cumplido los trámites precisos para asegurar la existencia de crédito para atender a las obligaciones económicas que se deriven de la presente contratación.

    routine confirmation of current-year budget credit

  29. Low

    The definitive guarantee must be furnished via bank guarantee (aval), surety insurance contract, or cash deposit at the Caja General de Depósitos.Financial

    a definitive guarantee, by means of a bank guarantee, surety insurance contract or cash deposit in the Caja General de Depósitosp. 31✓

    Spanish original

    una garantía definitiva, mediante aval, contrato de seguro de caución o depósito en efectivo en la Caja General de Depósitos

    permitted guarantee instruments, low risk

  30. Low

    If the definitive guarantee is constituted via cash deposit, it must exclusively be deposited at the Caja General de Depósitos.Financial

    only in the event that the guarantee is provided by means of a cash deposit, it must be made in the Caja General de Depósitosp. 31✓

    Spanish original

    sólo en el caso de que se realice la garantía mediante depósito en efectivo, deberá realizarse en la Caja General de Depósitos

    routine deposit venue rule, low risk

  31. Low

    Clause 21: Asepeyo's responsible Functional Directorate must issue a service completion certificate before payment can proceed.Financial

    The Functional Directorate of Asepeyo responsible for the subject matter of the contract shall issue the corresponding certification of performance of the service in order to proceed with the corresponding paymentp. 38✓

    Spanish original

    La Dirección Funcional responsable de la materia objeto del contrato de Asepeyo, emitirá la correspondiente certificación de realización del servicio para proceder al pago correspondiente

    routine payment certification procedure, low risk

  32. Low

    Clause 22: Payment is made in the Mutua's standard manner and under the conditions specified in the technical specifications and Section H of the characteristics summary.Commercial

    Payment shall be made in the usual manner of the Mutua and under the conditions indicated in the technical specifications and section H of the characteristics tablep. 38✓

    Spanish original

    El pago se realizará en la forma habitual de la Mutua y en las condiciones indicadas en el pliego de prescripciones técnicas y el apartado H del cuadro de características

    standard payment terms cross-reference, low risk

  33. Low

    Clause 24.6: Contracting body will verify that the contractor duly pays participating subcontractors or suppliers.Financial

    The contracting authority shall verify that the contractor duly pays the subcontractors or suppliers participating in the contract.p. 39✓

    Spanish original

    El órgano contratante comprobará que el contratista paga debidamente a las subcontratistas o suministradores que participan en el contrato.

    standard payment compliance oversight

  34. Low

    Clause 24.6: Detailed subcontractor list must indicate the subcontracting or supply terms for each entity directly relating to payment periods.Financial

    with an indication of the subcontracting or supply conditions of each one of them that are directly related to the payment term.p. 40✓

    Spanish original

    con indicación de las condiciones de subcontratación o suministro de cada una de ellas que guarden relación directa con el plazo de pago.

    routine disclosure of subcontractor payment terms, low risk

  35. Low

    Clause 27.2.e: Payment delay by Asepeyo exceeding the period in Article 198.6 LCSP (or shorter period under 198.8) is grounds for termination.Financial

    Delay in payment by Asepeyo for a period exceeding that established in section 6 of Article 198 or the shorter period that may have been established under section 8 thereof.p. 41✓

    Spanish original

    La demora en el pago por parte de Asepeyo por plazo superior al establecido en el apartado 6 del artículo 198 o el inferior que se hubiese fijado al amparo de su apartado 8.

    protects contractor against buyer late payment

  36. Low

    Clause 28.1: In the event of partial acceptance, partial return or cancellation of the proportional part of the guarantee may be authorized.Financial

    In the event of partial reception, the return or partial cancellation of the proportional part of the guarantee may be authorized.p. 42✓

    Spanish original

    En el supuesto de recepción parcial podrá autorizarse la devolución o cancelación parcial de la parte proporcional de la garantía.

    allows proportional release upon partial acceptance

  37. Low

    Clause 28.2: Return of the guarantee must be notified to the contractor within two months after the end of the warranty period.Financial

    The return must be notified to the interested party within two months from the end of the warranty period.p. 42✓

    Spanish original

    La devolución deberá notificarse al interesado en el plazo de dos meses desde la finalización del plazo de garantía.

    routine post-warranty guarantee release timeline

Technical77 rows · 6 high

  1. High

    Bidders must complete the column 'A cumplimentar por el licitador' in the Annex A Excel sheet corresponding to the lots tendered.Administrative

    Bidders must complete the column "To be completed by the bidder" in the Excel sheet corresponding to the lots for which they are submitting a bid.p. 5✓

    Spanish original

    Los licitadores deberán completar la columna "A cumplimentar por el licitador" en la hoja de Excel correspondiente a los lotes a los que se presenten.

    standard technical compliance matrix completion

  2. High

    If answering 'NO' to any Annex A point, the bidder must justify equivalence or improvement in the 'Observaciones' field for Contracting Board evaluation.Technical

    In the event of answering "NO" to any of the points, reasons must be provided in the "Remarks" field, justifying it appropriately.p. 5✓

    Spanish original

    En caso de responder "NO" en alguno de los puntos, se deberá motivar en el campo de “Observaciones”, justificándolo de manera adecuada.

    non-compliant specs risk rejection unless justified as equivalent

  3. High

    Bidder must fill in the Annex A column indicating the exact file name and page number where technical information is located.Administrative

    The bidding company must complete the column “Indicate where the information is located: file and page no.”.p. 5✓

    Spanish original

    La empresa licitadora deberá cumplimentar la columna “Indicar dónde se halla la información: archivo y nº de página”.

    standard cross-referencing requirement

  4. High

    A complete technical datasheet with a photograph of each product must be submitted at least in Spanish, unequivocally showing the product.Technical

    The complete technical data sheet with a photograph of each product, at least in Spanish, unequivocally showing the product, shall be submitted.p. 6✓

    Spanish original

    Se presentará la ficha técnica completa con fotografía de cada producto, como mínimo en castellano, que muestre inequívocamente el producto.

    Spanish-language datasheet with photo mandatory

  5. High

    Variants or alternatives (Art. 142 LCSP) and improvements (mejoras) are not admitted.Scope

    K.1 variants or alternatives (art. 142 LCSP): Not permitted. K.2 Improvements: No improvements are permitted.p. 15

    Spanish original

    K.1 variantes o alternativas (art. 142 LCSP): No se admiten. K.2 Mejoras: No se admiten mejoras.

    standard prohibition on variants and improvements

  6. High

    Proposals that fail to meet the required technical specifications will not be evaluated.Technical

    Proposals that do not comply with the required technical specifications will not be evaluated.p. 29✓

    Spanish original

    Las propuestas que no cumplan las prescripciones técnicas exigidas no serán objeto de valoración.

    hard pass/fail technical compliance gate

  7. Medium

    Item 3.10 requires supplying 2 cement injection guns on loan (cesión) without a separate unit price.Commercial

    3.10 Cement injection gun (loan/assignment) 2p. 7✓

    Spanish original

    3.10 Pistola inyectora de cemento (cesión) 2

    equipment loan requirement without separate price

  8. Medium

    Envelope 2 (Sobre nº DOS) is opened in a private act after Envelope 1 to review its contents against the criteria in Annex XI.Commercial

    Once envelope no. ONE has been opened, the opening of envelopes no. TWO shall subsequently proceed, in a private session, in order to review their contents according to the criteria set forth in Annex XI.p. 27✓

    Spanish original

    Realizada la apertura del sobre nº UNO se procederá posteriormente a la apertura, en acto privado, de los sobres nº DOS, al objeto de revisar su contenido con arreglo a los criterios expresados en el Anexo XI.

    weighted/scored evaluation criteria in Annex XI

  9. Low

    Lot 1 Items 1.1–1.6: Nano-hydroxyapatite bone substitute must be synthetic granulated paste composed of 32% nanocrystalline hydroxyapatite, 16.5% hydroxyapatite (60%)/tricalcium phosphate (40%) granules, and water.Technical

    Synthetic bone substitute formed by a granulated pasty material composed of 32% nanocrystalline hydroxyapatite and 16.5% hydroxyapatite (60%)/tricalcium phosphate (40%) granules; remainder of the material, water.p. 1✓

    Spanish original

    Sustitutivo óseo sintético formado por un material pastoso granulado compuesto por un 32 % de hidroxiapatita nanocristalina y un 16,5 % de gránulos de hidroxiapatita (60%)/fosfato tricálcico (40%); resto del material, agua.

    routine technical product composition specification

  10. Low

    Lot 1 Items 1.1–1.6: Nano-hydroxyapatite bone substitute must be sterile and for single use.Technical

    Sterile, single use.p. 1✓

    Spanish original

    Estéril, de un solo uso.

    routine medical product sterility specification

  11. Low

    Lot 1 Items 1.1–1.6: Nano-hydroxyapatite bone substitute must be supplied in a prefilled syringe presentation.Technical

    Presentation, pre-filled syringe.p. 1✓

    Spanish original

    Presentación, jeringa precargada.

    routine product presentation specification

  12. Low

    Lot 1 Items 1.1–1.6: Nano-hydroxyapatite bone substitute must be supplied in approximate sizes of 0.5cc, 1cc, 2cc, 2.5cc, 5cc, and pack of 2 units of 5cc.Technical

    Approx. measurements: 0.5cc - 1cc - 2cc - 2.5cc - 5cc - pack of 2 units of 5ccp. 1✓

    Spanish original

    Medidas aprox.: 0,5cc- 1cc - 2cc - 2,5cc - 5cc - pack de 2 unidades de 5cc

    routine product sizing specification

  13. Low

    Lot 1 Items 1.7–1.9: Calcium sulfate bone substitute must consist of calcium sulfate powder and an aqueous mixing solution.Technical

    Bone substitute composed of calcium sulfate powder and an aqueous mixing solutionp. 1✓

    Spanish original

    Sustitutivo óseo formado por sulfato de calcio en polvo y una solución de mezcla acuosa

    routine product formulation specification

  14. Low

    Lot 1 Items 1.7–1.9: Calcium sulfate mixture must be applicable as a paste or formed into beads in three sizes (3cc, 4.8cc, 6cc) using a molding mat.Technical

    The mixture can be applied as a paste or used to make beads in three possible sizes (3cc - 4.8cc - 6cc) using a molding mat for implantation.p. 1✓

    Spanish original

    La mezcla puede aplicarse como pasta o elaborar con ella perlas en tres posibles medidas (3cc - 4,8cc - 6cc) mediante alfombrilla moldeadora para su implantación.

    routine clinical application specification

  15. Low

    Lot 1 Items 1.7–1.9: Calcium sulfate mixture must allow the addition of antibiotics (gentamicin, vancomycin, or tobramycin).Technical

    The mixture allows the addition of antibiotic (gentamicin, vancomycin or tobramycin)p. 1✓

    Spanish original

    La mezcla permite la adición de antibiótico (gentamicina, vancomicina o tobramicina)

    routine clinical compatibility specification

  16. Low

    Lot 1 Items 1.7–1.9: Calcium sulfate bone substitute must have an absorption time between 30 and 60 days.Technical

    Absorption time: between 30 and 60 days.p. 1✓

    Spanish original

    Tiempo de absorción: entre 30 y 60 días.

    routine clinical resorption specification

  17. Low

    Lot 1 Items 1.7–1.9: Each calcium sulfate package must be double and sterile, containing a mixing tray, bottle of calcium sulfate powder, and tube with distilled aqueous solution.Technical

    Each package must be double and sterile, containing: - mixing tray - jar with calcium sulfate powder - tube with distilled aqueous solutionp. 1✓

    Spanish original

    Cada envase debe ser doble y estéril, conteniendo: - bandeja para la mezcla - bote con el polvo de sulfato de calcio - tubo con solución acuosa destilada

    routine sterile packaging and kit contents specification

  18. Low

    Lot 1 Items 1.7–1.9: Each double sterile calcium sulfate package must also include a spatula and a silicone mold for making the three bead sizes.Technical

    - spatula - silicone mold to produce the three bead sizes.p. 1✓

    Spanish original

    - espátula - molde de silicona para fabricar las tres medidas de perlas.

    routine kit accessory specification

  19. Low

    Lot 1 Item 1.10: Must supply a kit containing the elements to prepare and introduce calcium sulfate pellets.Technical

    Kit with the elements to prepare and introduce calcium sulfate pelletsp. 1✓

    Spanish original

    Kit con los elementos para elaborar e introducir balas con sulfato de calcio

    routine medical kit scope specification

  20. Low

    Lot 1 Item 1.10: The pellet kit must contain a flexible mold for two pellet sizes (approx. 7x20mm and 9x20mm), a 7 mm introducer, a 9 mm introducer, and an obturator.Technical

    Said kit must contain: - flexible mold for the preparation of the pellets (two sizes: approx. 7x20mm and 9x20mm) - 7 mm introducer - 9 mm introducer - obturatorp. 1✓

    Spanish original

    Dicho kit debe contener: - molde flexible para la preparación de las balas (dos medidas: 7x20mm y 9x20mm aprox.) - introductor de 7 mm - introductor de 9 mm - obturador

    routine kit components and dimensions specification

  21. Low

    Lot 1 (Items 1.7–1.9): Double sterile package must contain a jar with calcium sulfate powder.Technical

    jar with the calcium sulfate powderp. 1✓

    Spanish original

    bote con el polvo de sulfato de calcio

    routine kit component spec, low risk

  22. Low

    Lot 10 (Items 10.1–10.2): Synthetic bone substitute must be ceramic, moldable, injectable, and fast-setting.Technical

    Ceramic, moldable, injectable, and fast-setting bone substitute.p. 1✓

    Spanish original

    Sustituto óseo cerámico, moldeable, inyectable y de fraguado rápido.

    routine technical product spec, low risk

  23. Low

    Lot 10 (Items 10.1–10.2): Material must consist of a powder component (approx. 40% hydroxyapatite and 60% calcium sulfate) and a liquid component with a radiopaque agent.Technical

    The material consists of a powder component (approx. 40% hydroxyapatite and 60% calcium sulfate) and a liquid component (with radiopaque component)p. 1✓

    Spanish original

    El material consta de un componente en polvo (40% hidroxiapatita y 60% sulfato de calcio, aprox) y uno líquido (con componente radiopaco)

    routine technical composition spec, low risk

  24. Low

    Lot 10 (Items 10.1–10.2): Obtained paste must be injectable, moldable, hand-applicable, or usable to make beads.Technical

    The obtained paste must be capable of being injected, molded, applied by hand, or used to make beads.p. 1✓

    Spanish original

    La pasta obtenida debe poderse inyectar, moldear y aplicar a mano o elaborar perlas.

    routine technical handling spec, low risk

  25. Low

    Lot 10 (Items 10.3–10.4): Ceramic bone substitute must be moldable, injectable, highly osteoconductive, and slow-resorbing.Technical

    Ceramic, moldable, injectable, highly osteoconductive, and slow-resorbing bone substitutep. 1✓

    Spanish original

    Sustituto óseo cerámico, moldeable, inyectable, altamente osteoconductivo y de reabsorción lenta

    routine technical product spec, low risk

  26. Low

    Lot 10 (Items 10.3–10.4): Material must consist of a powder component (approx. 40% hydroxyapatite and 60% calcium sulfate), a liquid component (sodium chloride 9 mg/ml), and gentamicin powder (17.5 mg/ml).Technical

    The material consists of a powder component (approx. 40% hydroxyapatite and 60% calcium sulfate), a liquid component (sodium chloride 9 mg/ml), and gentamicin powder (17.5 mg/ml)p. 1✓

    Spanish original

    El material consta de un componente en polvo (40% hidroxiapatita y 60% sulfato de calcio, aprox), uno líquido (cloruro sódico 9 mg/ml) y gentamicina en polvo (17,5mg/ml)

    routine technical composition spec, low risk

  27. Low

    Lot 10 (Items 10.3–10.4): Kit must contain a mixer/injector and 11G conical-tip extenders of 50 mm and 100 mm.Technical

    The kit must contain a mixer/injector and 11G tip extenders, 50 and 100mm, conical tipp. 1✓

    Spanish original

    El kit debe contener mezclador/inyector y extensores de punta 11G, 50 y 100mm, punta cónica

    routine kit component spec, low risk

  28. Low

    Lot 10 (Items 10.3–10.4): Obtained paste must be injectable or usable to make beads.Technical

    The obtained paste must be capable of being injected or used to make beads.p. 1✓

    Spanish original

    La pasta obtenida debe poderse inyectar o elaborar perlas.

    routine technical handling spec, low risk

  29. Low

    Lot 10 (Item 10.5): Ceramic bone substitute must be moldable, injectable, fast-setting, highly osteoconductive, and slow-resorbing.Technical

    Ceramic, moldable, injectable, fast-setting, highly osteoconductive, and slow-resorbing bone substitutep. 1✓

    Spanish original

    Sustituto óseo cerámico, moldeable, inyectable, de fraguado rápido, altamente osteoconductivo y de reabsorción lenta

    routine technical product spec, low risk

  30. Low

    Lot 10 (Item 10.5): Material must consist of a powder component (approx. 40% hydroxyapatite and 60% calcium sulfate), a liquid component with radiopaque agent, and vancomycin powder (66 mg/ml).Technical

    The material consists of a powder component (approx. 40% hydroxyapatite and 60% calcium sulfate), a liquid component (with radiopaque component), and vancomycin powder (66 mg/ml)p. 1✓

    Spanish original

    El material consta de un componente en polvo (40% hidroxiapatita y 60% sulfato de calcio, aprox), uno líquido (con componente radiopaco) y vancomicina en polvo (66mg/ml)

    routine technical composition spec, low risk

  31. Low

    Lot 11 (Items 11.1–11.3): Cartilage regenerator must be a 3D structured bilayer matrix of biodegradable collagen I/III and elastin of porcine or equine origin for Grade III/IV focal cartilage lesions.Technical

    Structured 3D bilayer matrix of collagen I/III and biodegradable elastin, of porcine or equine origin, for grade III/IV focal cartilage lesionsp. 1✓

    Spanish original

    Matriz 3D estructurada en bicapa de colágeno I/III y elastina biodegradable, de origen porcino o equino, para lesiones focales de cartílago grado III/IV

    routine technical product spec, low risk

  32. Low

    Lot 11 (Items 11.1–11.3): Kit must come in double sterile packaging and contain a non-implantable aluminum measuring template.Quality

    The kit must come in double sterile packaging and contain a non-implantable aluminum measurement templatep. 1✓

    Spanish original

    El kit debe ir en doble embalaje estéril y contener una plantilla de medición de aluminio no implantable

    routine sterile packaging and kit spec, low risk

  33. Low

    Lot 1 Items 1.7–1.9: Calcium sulfate bone substitute must be biodegradable.Technical

    Biodegradablep. 1

    routine material property specification

  34. Low

    Lot 1 Items 1.7–1.9: Calcium sulfate bone substitute kit must be latex-free.Technical

    Latex-freep. 1

    Spanish original

    Libre de látex

    routine medical safety material specification

  35. Low

    Lot 1 (Items 1.7–1.9): Double sterile package must contain a mixing tray.Technical

    mixing trayp. 1✓

    Spanish original

    bandeja para la mezcla

    routine kit component spec, low risk

  36. Low

    Lot 1 (Items 1.7–1.9): Double sterile package must contain a tube with distilled aqueous solution.Technical

    tube with distilled aqueous solutionp. 1✓

    Spanish original

    tubo con solución acuosa destilada

    routine kit component spec, low risk

  37. Low

    Lot 1 (Items 1.7–1.9): Double sterile package must contain a spatula.Technical

    spatulap. 1

    Spanish original

    espátula

    routine kit component spec, low risk

  38. Low

    Lot 1 (Item 1.10): Bullet kit must contain a 7 mm introducer.Technical

    7 mm introducerp. 1✓

    Spanish original

    introductor de 7 mm

    routine kit component spec, low risk

  39. Low

    Lot 1 (Item 1.10): Bullet kit must contain a 9 mm introducer.Technical

    9 mm introducerp. 1✓

    Spanish original

    introductor de 9 mm

    routine kit component spec, low risk

  40. Low

    Lot 1 (Item 1.10): Bullet kit must contain an obturator.Technical

    obturatorp. 1

    Spanish original

    obturador

    routine kit component spec, low risk

  41. Low

    Lot 10 (Items 10.1–10.2): Kit must contain a mixer/injector.Technical

    The kit must contain mixer/injectorp. 1✓

    Spanish original

    El kit debe contener mezclador/inyector

    routine kit component spec, low risk

  42. Low

    Lot 10 (Items 10.1–10.2): Bone substitute must be drillable (perforable).Technical

    Pierceablep. 1

    Spanish original

    Perforable

    routine technical mechanical spec, low risk

  43. Low

    Lot 10 (Items 10.1–10.2): Bone substitute must be sterile.Quality

    Sterilep. 1

    Spanish original

    Estéril

    routine sterile product spec, low risk

  44. Low

    Lot 10 (Items 10.1–10.2): Bone substitute must be offered in 5 ml and 10 ml presentations.Technical

    Presentation of 5 and 10mlp. 1✓

    Spanish original

    Presentación de 5 y 10ml

    routine product volume spec, low risk

  45. Low

    Lot 10 (Items 10.3–10.4): Gentamicin bone substitute must be sterile.Quality

    Sterilep. 1

    Spanish original

    Estéril

    routine sterile product spec, low risk

  46. Low

    Lot 10 (Item 10.5): Vancomycin bone substitute must be sterile.Quality

    Sterilep. 1

    Spanish original

    Estéril

    routine sterile product spec, low risk

  47. Low

    Lot 10 (Item 10.5): Vancomycin bone substitute must be offered in a 10 ml presentation.Technical

    Presentation of 10mlp. 1✓

    Spanish original

    Presentación de 10ml

    routine product volume spec, low risk

  48. Low

    Lot 11 (Items 11.1–11.3): Cartilage regenerator must be offered in approximate size 20 x 30 mm (25 struck through in specification).Technical

    20 x 30mmp. 1

    routine product sizing spec, low risk

  49. Low

    Lot 11 (Items 11.1–11.3): Cartilage regenerator must be offered in approximate size 30 x 40 mm.Technical

    30 x 40mmp. 1

    routine product sizing spec, low risk

  50. Low

    Lot 11 (Items 11.1–11.3): Cartilage regenerator must be offered in approximate size 40 x 50 mm.Technical

    40 x 50mmp. 1

    routine product sizing spec, low risk

  51. Low

    Scope covers supply of bone substitutes and other tissues for ASEPEYO hospitals (Mutua Colaboradora con la Seguridad Social nº 151).Technical

    The purpose of these specifications is to regulate the technical requirements that will govern the acquisition of bone substitutes and other tissues for the hospitals of ASEPEYO, Mutua Colaboradora con la Seguridad Social nº 151p. 3✓

    Spanish original

    El objeto de este pliego es regular las prescripciones técnicas que regirán para la adquisición de sustitutivos óseos y otros tejidos para los hospitales de ASEPEYO, Mutua Colaboradora con la Seguridad Social nº 151

    routine tender scope definition

  52. Low

    Lot 1 scope: Supply of bone substitute with nano-HA and Ca sulfate for ASEPEYO's Coslada and Sant Cugat hospitals.Technical

    Bone substitute with nano-HA and with Ca sulfate for the Coslada and Sant Cugat hospitals of ASEPEYOp. 3✓

    Spanish original

    Sustitutivo óseo con nano-HA y con sulfato Ca para los hospitales de Coslada y Sant Cugat de ASEPEYO

    routine product supply scope for Lot 1

  53. Low

    Lot 2 scope: Supply of S53P4 bioglass bone substitute for ASEPEYO hospitals.Technical

    S53P4 Bioglass bone substitute for the hospitals of ASEPEYOp. 3✓

    Spanish original

    Sustitutivo óseo de Biovidrio S53P4 para los hospitales de ASEPEYO

    routine product supply scope for Lot 2

  54. Low

    Lot 3 scope: Supply of bone cements for ASEPEYO's Coslada and Sant Cugat hospitals.Technical

    Bone cements for the Coslada and Sant Cugat hospitals of ASEPEYOp. 3✓

    Spanish original

    Cementos óseos para los hospitales de Coslada y Sant Cugat de ASEPEYO

    routine product supply scope for Lot 3

  55. Low

    Lot 4 scope: Supply of collagen matrix for ASEPEYO's Coslada and Sant Cugat hospitals.Technical

    Collagen matrix for the Coslada and Sant Cugat hospitals of ASEPEYOp. 3✓

    Spanish original

    Matriz de colágeno para los hospitales de Coslada y Sant Cugat de ASEPEYO

    routine product supply scope for Lot 4

  56. Low

    Lot 5 scope: Supply of nerve connectors, protectors, and grafts for ASEPEYO hospitals.Technical

    Nerve connectors, protectors, and grafts for the hospitals of ASEPEYOp. 3✓

    Spanish original

    Conectores, protectores e injertos de nervios para los hospitales de ASEPEYO

    routine product supply scope for Lot 5

  57. Low

    Lot 6 scope: Supply of spinal intervention gel for ASEPEYO's Sant Cugat hospital.Technical

    Gel for spine interventional procedures for the Sant Cugat hospital of ASEPEYOp. 3✓

    Spanish original

    Gel para intervencionismo columna para el hospital de Sant Cugat de ASEPEYO

    routine product supply scope for Lot 6

  58. Low

    Lot 7 scope: Supply of collagen repair, hemostatic, and dermal substitute for ASEPEYO's Coslada and Sant Cugat hospitals.Technical

    Collagen repairer, hemostatic, and dermal substitute for the Coslada and Sant Cugat hospitals of ASEPEYOp. 3✓

    Spanish original

    Reparador de colágeno, hemostático y sustitutivo dérmico para los hospitales de Coslada y Sant Cugat de ASEPEYO

    routine product supply scope for Lot 7

  59. Low

    Lot 8 scope: Supply of Grafton-type human demineralized bone matrix for ASEPEYO hospitals.Technical

    Demineralized bone matrix of human origin, Grafton type, for the hospitals of ASEPEYOp. 3✓

    Spanish original

    Matriz ósea desmineralizada de origen humano tipo Grafton para los hospitales de ASEPEYO

    routine product supply scope for Lot 8

  60. Low

    Lot 9 scope: Supply of antibiotic-loaded spacer for ASEPEYO's Coslada and Sant Cugat hospitals.Technical

    Antibiotic spacer for the Coslada and Sant Cugat hospitals of ASEPEYOp. 3✓

    Spanish original

    Espaciador con antibiótico para los hospitales de Coslada y Sant Cugat de ASEPEYO

    routine product supply scope for Lot 9

  61. Low

    Lot 10 scope: Supply of synthetic hydroxyapatite and calcium sulfate bone substitute for ASEPEYO's Coslada and Sant Cugat hospitals.Technical

    Synthetic bone substitute of hydroxyapatite and calcium sulfate for the Coslada and Sant Cugat hospitals of ASEPEYOp. 3✓

    Spanish original

    Sustitutivo óseo sintético de hidroxiapatita y sulfato cálcico para los hospitales de Coslada y Sant Cugat de ASEPEYO

    routine product supply scope for Lot 10

  62. Low

    Lot 11 scope: Supply of cartilage regenerator for ASEPEYO's Coslada and Sant Cugat hospitals.Technical

    Cartilage regenerator for the Coslada and Sant Cugat hospitals of ASEPEYOp. 3✓

    Spanish original

    Regenerador de cartílago para los hospitales de Coslada y Sant Cugat de ASEPEYO

    routine product supply scope for Lot 11

  63. Low

    Supplied bone substitutes and tissues must comply with the Technical Specifications in Annex I (Pliego de prescripciones técnicas, omitted from excerpt).Technical

    Annex I Technical specifications documentp. 3✓

    Spanish original

    Anexo I Pliego de prescripciones técnicas

    mandatory technical specifications compliance

  64. Low

    All offered products must be free of harmful or toxic ingredients and must not emit unpleasant odors.Quality

    All submitted products shall be free of harmful or toxic ingredients and must not emit unpleasant odors.p. 4✓

    Spanish original

    Todos los productos presentados estarán libres de ingredientes nocivos o tóxicos y no deberán desprender olores desagradables.

    standard product safety and quality spec

  65. Low

    Contract covers the supply of bone substitutes and other tissues for the hospitals of ASEPEYO, Mutua Colaboradora con la Seguridad Social, núm. 151 (Exp. CP00122/2026).Technical

    Supply of bone substitutes and other tissues for the hospitals of ASEPEYO, Mutua Colaboradora con la Seguridad Social, no. 151.p. 4✓

    Spanish original

    Suministro de sustitutivos óseos y otros tejidos para los hospitales de ASEPEYO, Mutua Colaboradora con la Seguridad Social, núm. 151.

    routine contract scope definition

  66. Low

    Any special brand mentions in the technical specifications are exceptional and must in all cases be understood as equivalent or similar.Technical

    and therefore in any case it must be understood as equivalent or similar.p. 5✓

    Spanish original

    por lo que en cualquier caso se debe entender como equivalente o similar.

    permissive equivalent-brand allowance

  67. Low

    Specified magnitudes (dimensions, weights, volumes) are approximate; variations in offered products are accepted provided they do not alter product functionality.Technical

    We indicate that the magnitudes (measurements, weights and volumes) specified in these specifications are approximate and variations in the offered products will be accepted, provided that they do not alter the functionality of the product.p. 5✓

    Spanish original

    Indicamos que las magnitudes (medidas, pesos y volúmenes) especificadas en este pliego son aproximadas y se aceptarán variaciones en los productos ofertados, siempre y cuando no alteren la funcionalidad del producto.

    permissive tolerance on product dimensions

  68. Low

    Bidder must indicate whether each offered product meets the minimum technical characteristics required in Annex A.Technical

    The bidding company must indicate whether the submitted product complies with the minimum characteristics required pursuant to the provisions of Annex A.p. 5✓

    Spanish original

    La empresa licitadora deberá indicar si el producto presentado cumple con las características mínimas requeridas según lo establecido en el Anexo A.

    routine compliance declaration in Annex A

  69. Low

    Generic references such as 'Ver fichas técnicas' or similar that fail to show the requested location will not be accepted.Administrative

    Indications such as See technical data sheets or similar, which do not reflect the requested information, will not be accepted.p. 5✓

    Spanish original

    No se aceptará que se indique Ver fichas técnicas o similar, que no reflejen la información solicitada.

    formatting rule for Annex A cross-references

  70. Low

    The contract falls under CPV classification code 33184100-4 (Surgical implants).Technical

    33184100-4 Surgical implantsp. 5✓

    Spanish original

    33184100-4 Implantes quirúrgicos

    standard CPV product classification

  71. Low

    A single technical datasheet covering multiple products is valid only when the sole difference between them is size or dimension.Technical

    A technical data sheet containing several products, with the only difference between them being the size, shall be considered valid.p. 6✓

    Spanish original

    Se considerará válida una ficha técnica que contenga varios productos, siendo la única diferencia entre ellos la talla o el tamaño.

    permissive datasheet consolidation rule

  72. Low

    The contract subject matter and any division into lots are defined in Section B of the Characteristics Table, subject to the PCAP, PPT, and LCSP modifications.Technical

    The object of the contract to which this specific administrative clauses document refers, and the possibility of its division into lots, is that established in section B of the characteristics table,p. 20✓

    Spanish original

    El objeto del contrato a que se refiere el presente pliego de cláusulas administrativas particulares, y la posibilidad de su división en lotes, es el que se establece en el apartado B del cuadro de características,

    routine scope and lot division cross-reference

  73. Low

    Clause 12.2: Envelope 2 must include technical documentation requested in the PPT (if requested) for prior evaluation.Technical

    Technical documentation requested in the technical specifications document, if requested, which shall be subject to prior evaluation.p. 26✓

    Spanish original

    Documentación técnica solicitada en el pliego de prescripciones técnicas, en caso de solicitarse, que será objeto de evaluación previa.

    routine technical documentation submission requirement

  74. Low

    Clause 12.2: If variants are permitted, proposed alternative solutions must satisfy the technical requirements and modalities in the PPT and Annex III.Technical

    with the requirements, modalities, and technical characteristics established in the Technical Specifications Document and summarized in Annex III.p. 26✓

    Spanish original

    con los requisitos, modalidades y características técnicas fijadas en el Pliego de Prescripciones Técnicas y resumidas en el Anexo III.

    technical conformity condition for optional variants

  75. Low

    The Contracting Board may request technical reports to verify that offers comply with the tender technical specifications under Art. 157.5 LCSP.Technical

    may request these reports when it considers it necessary to verify that the bids comply with the technical specifications of the specifications, in accordance with the provisions of Article 157.5 LCSP.p. 29✓

    Spanish original

    podrá solicitar estos informes cuando considere necesario verificar que las ofertas cumplen con las especificaciones técnicas de los pliegos, de conformidad con lo previsto en el artículo 157.5 LCSP.

    routine technical verification procedure, low risk

  76. Low

    Clause 18.2: Contract works must be performed in strict compliance with the administrative clauses, technical specifications, and contracting authority instructions.Technical

    The works subject to the contract shall be carried out with strict adherence to the stipulations of these specifications of clauses, the technical specifications, and the instructions of the contracting authority.p. 35✓

    Spanish original

    Los trabajos objeto del contrato se llevarán a cabo con estricta sujeción a las estipulaciones de este pliego de cláusulas, al pliego de prescripciones técnicas, y a las instrucciones del órgano de contratación.

    routine performance compliance obligation, low risk

  77. Low

    Clause 20.1: Contract execution must conform to the provisions of both the administrative clauses and the technical specifications.Technical

    The performance of the contract shall conform to what is established in these specifications and in the technical specifications.p. 37✓

    Spanish original

    La ejecución del contrato se ajustará a lo establecido en el presente pliego, y en el pliego de prescripciones técnicas.

    routine compliance with tender specifications, low risk

Delivery & Logistics41 rows · 6 high

  1. High

    ASEPEYO hospitals may require permanent consignment stock throughout the contract and its extensions at zero cost to ASEPEYO.Commercial

    This consignment stock shall entail no cost whatsoever for ASEPEYO and shall be established on a permanent basis throughout the entire term of the contract and its extensions or for as long as deemed necessaryp. 5✓

    Spanish original

    Este depósito no presentará coste alguno para ASEPEYO y se establecerá de forma permanente durante toda la vigencia del contrato y sus prórrogas o mientras lo consideren necesario

    supplier finances permanent zero-cost consignment inventory

  2. High

    Once consignment stocks are established, the supplier is obliged to accept any justified upward or downward modification of stocked products or quantities.Commercial

    In the event that, once the consignment stocks are established, the need to modify the deposited products or quantities is justified, either upward or downward, the supplier shall be obliged to accept it.p. 8✓

    Spanish original

    En caso de que una vez implantados los depósitos, se justificase la necesidad de modificación de los productos o cantidades depositadas, ya sea al alza o a la baja, el proveedor estará obligado a aceptarla.

    mandatory unilateral buyer adjustments to consignment inventory

  3. High

    All costs of replacing consignment products due to expiration must be borne by the contractor.Financial

    Replacements due to product expiration shall be at the expense of the successful bidder.p. 8✓

    Spanish original

    Las sustituciones por caducidad de producto correrán a cargo del adjudicatario.

    supplier bears full financial loss of expired stock

  4. High

    Supplier must withdraw and replace at no additional cost any consignment products with less than 2 months remaining shelf life, upon prior notice to the Operating Room Service.Financial

    The bidder shall withdraw and replace at no additional cost those consignment products with an expiration of less than 2 months, upon prior notice to the Operating Room Service.p. 8✓

    Spanish original

    El licitador retirará y sustituirá sin coste adicional aquellos productos en depósito con una caducidad inferior a 2 meses, previo aviso al Servicio de Quirófano.

    mandatory free replacement below 2-month shelf life

  5. High

    Clause 27.2.d: Delay by the contractor in meeting deadlines is grounds for contract termination.Delivery

    Delay in compliance with deadlines by the contractor.p. 41✓

    Spanish original

    La demora en el cumplimiento de los plazos por parte del contratista.

    delivery delay grounds for termination

  6. High

    Clause 27.2.d: Unjustified delay on the work plan in any activity exceeding one-third of the initial contract duration (including extensions) is in all cases grounds for termination.Delivery

    unjustified delay with respect to the work plan established in the specifications or in the contract, in any activity, for a period exceeding one third of the initial duration of the contract, including any possible extensions.p. 41✓

    Spanish original

    el retraso injustificado sobre el plan de trabajos establecido en el pliego o en el contrato, en cualquier actividad, por un plazo superior a un tercio del plazo de duración inicial del contrato, incluidas las posibles prórrogas.

    unjustified delay over one-third of term triggers termination

  7. Medium

    Initial consignment stock must be delivered within a maximum of 30 days after contract formalization.Delivery

    The consignment stock shall be delivered within a maximum period of thirty days following the formalization of the contract under the following conditions:p. 8✓

    Spanish original

    El depósito será entregado en un plazo máximo de treinta días posterior a la formalización del contrato en las siguientes condiciones:

    firm 30-day mobilization SLA post-contract signing

  8. Medium

    Consignment stock must be accompanied by a delivery note (minimum 3 copies) stating batch number, serial number, and expiry date for medical device vigilance compliance.Compliance

    It must be referenced in a delivery note (with at least three copies) specifying: lot number, serial number, and expiration date of the bone substitutesp. 8✓

    Spanish original

    Deberá referenciarse en un albarán (con al menos tres copias) en el que se precisará: número de lote, número de serie y fecha de caducidad de los sustitutivos óseos

    strict medical device traceability and vigilance requirement

  9. Medium

    There is no minimum material volume or minimum monetary value requirement per order.Commercial

    There shall be no requirement for a minimum purchase volume of material or amount per order.p. 8✓

    Spanish original

    No habrá exigencia de compra mínima de volumen de material ni de importe por pedido.

    no minimum order value increases unit logistics cost

  10. Medium

    Section 5.2.4: Contractor must deliver requested replacement material within a maximum period of 48 business hours.Delivery

    The successful bidder must deliver the requested material to be replaced within a maximum period of 48 business hours.p. 9✓

    Spanish original

    La empresa adjudicataria deberá entregar el material solicitado a reemplazar en un plazo máximo de 48 horas hábiles.

    tight 48-business-hour replenishment delivery SLA

  11. Medium

    Section 5.4: Once contract execution begins, contractor must respond to any incident (damaged material, misprocessed order, etc.) within no more than 48 hours of notification.Delivery

    Once performance of the contract has commenced, the successful tenderer must respond to any incident (material in poor condition, incorrectly processed order, etc.) within a period not exceeding 48 hours from the notification thereof.p. 10✓

    Spanish original

    La empresa adjudicataria una vez iniciada la ejecución del contrato, deberá responder ante cualquier incidencia (material en mal estado, pedido mal tramitado, etc.) en un tiempo no superior a 48h. desde la notificación de la misma.

    strict 48-hour incident response SLA

  12. Medium

    Clause 9: Winning bidder must execute the contract using the exact same resources presented to prove solvency.Delivery

    In the event of being awarded the contract, the bidder shall execute the contract with the same means provided to prove its solvency.p. 23✓

    Spanish original

    En caso de resultar adjudicatario el licitador ejecutará el contrato con los mismos medios que ha aportado para acreditar su solvencia.

    binding obligation to deploy committed solvency resources

  13. Low

    Contractor must execute the supply within the contract term and delivery rules specified in Clause 18 (details in omitted pages 5-45).Delivery

    18. Term and performance of the contractp. 2✓

    Spanish original

    18. Plazo y ejecución del contrato

    routine execution period and schedule rules

  14. Low

    Delivered supplies are subject to formal reception/acceptance verification under Clause 21 (details in omitted pages 5-45).Delivery

    21. Reception of the contractp. 2✓

    Spanish original

    21. Recepción del contrato

    routine delivery acceptance inspection procedure

  15. Low

    Lots 1, 2, 3, 5, and 8 have an expected start date of 1 April 2027 and a 12-month third extension duration, whereas Lots 4, 6, 7, 9, 10, and 11 have an expected start date of 1 October 2027 and a 6-month third extension duration.Schedule

    Lot 1, 2, 3, 5, 8: CONTRACT START DATE 1/4/2027, DURATION OF 3rd EXTENSION 12 months. Lot 4, 6, 7, 9, 10, 11: CONTRACT START DATE 1/10/2027, DURATION OF 3rd EXTENSION 6 months.p. 4

    Spanish original

    Lote 1, 2, 3, 5, 8: FECHA INICIO CONTRATO 1/4/2027, DURACIÓN 3ª PRÓRROGA 12 meses. Lote 4, 6, 7, 9, 10, 11: FECHA INICIO CONTRATO 1/10/2027, DURACIÓN 3ª PRÓRROGA 6 meses.

    standard contract schedule per lot

  16. Low

    The contract contemplates up to 3 extensions (prórrogas) across the 11 lots totaling €1,177,604.50 excl. VAT (€1,297,456.55 incl. VAT), bringing total base plus extensions to €1,580,498.28 excl. VAT (€1,741,336.91 incl. VAT).Commercial

    €1,177,604.50p. 4

    Spanish original

    1.177.604,50 €

    routine contract extension capacity across lots

  17. Low

    ASEPEYO hospitals in Coslada and Sant Cugat and the Cartuja-Sevilla Day Hospital will establish consignment stock of contract materials with awarded suppliers based on need and consumption.Delivery

    Each of the ASEPEYO hospitals (Coslada and Sant Cugat) and the Cartuja-Sevilla Day Hospital shall establish the deposit of materials with the winning companiesp. 7✓

    Spanish original

    Cada uno de los hospitales de ASEPEYO (Coslada y Sant Cugat) y el Hospital de día de Cartuja-Sevilla, establecerán con las empresas adjudicatarias el depósito de los materiales

    consignment stock scope across three hospitals

  18. Low

    Awarded supplier must properly transport consignment material to the designated storage location within each hospital.Delivery

    The successful bidder company shall properly transport the consignment material to the designated location at each hospital.p. 8✓

    Spanish original

    La empresa adjudicataria transportará debidamente el material en depósito hasta donde se establezca en cada hospital.

    standard internal hospital delivery requirement

  19. Low

    If during the contract term ASEPEYO determines a bone substitute must be kept in consignment at any hospital, the supplier will be notified.Delivery

    In the event that, throughout the term of the contract, it is considered that a bone substitute must remain in consignment at any of the ASEPEYO hospitals, said need shall be notified to the corresponding supplier.p. 8✓

    Spanish original

    En caso de que, a lo largo de la vigencia del contrato, se considere que un sustituto óseo debe quedar en depósito en alguno de los hospitales de ASEPEYO, se notificará dicha necesidad al proveedor correspondiente.

    routine mid-contract consignment notification procedure

  20. Low

    Awarded supplier is responsible for monitoring expiry dates of consignment materials and submitting an updated expiry date report.Delivery

    It shall be the responsibility of the successful bidder company to maintain control over the expiration dates of the consignment materials, and it must provide an updated report of the expiration dates.p. 8✓

    Spanish original

    Será responsabilidad de la empresa adjudicataria, mantener el control de las caducidades de los materiales en depósito, debiendo pasar un informe actualizado de las fechas de caducidad.

    routine inventory expiry monitoring and reporting

  21. Low

    Upon contract termination, the consignment stock must be collected by the contractor according to the final inventory.Delivery

    At the end of the contractual period, the provided consignment stock must be withdrawn by the successful bidder in accordance with the last inventory carried out.p. 8✓

    Spanish original

    Al finalizar el periodo contractual, el depósito aportado deberá ser retirado por el adjudicatario conforme al último inventario realizado.

    standard end-of-contract stock demobilization

  22. Low

    Consignment stock will be replenished on a rolling basis as materials are used.Delivery

    The consignment stock shall be replenished as it is utilized.p. 8✓

    Spanish original

    El depósito será renovable a medida que se vaya produciendo su utilización.

    standard rolling consignment replenishment

  23. Low

    The contractor's contract coordinator must provide the email addresses to which replenishment orders will be sent.Administrative

    The contract coordinator of the successful bidder company must provide the email addresses to which orders will be sent.p. 8✓

    Spanish original

    El coordinador de contrato de la empresa adjudicataria deberá facilitar las direcciones de correo electrónico donde se remitirán los pedidos.

    routine order-routing email requirement

  24. Low

    Each hospital will place written replenishment orders for used material via email.Delivery

    From each hospital, the order for the material used will be placed in writing and sent via email.p. 8✓

    Spanish original

    Desde cada hospital, se realizará el pedido del material utilizado por escrito y se enviarán vía correo electrónico.

    routine written email ordering procedure

  25. Low

    Section 5.2.3: Contractor must properly transport requested material to the designated point at Hospital ASEPEYO Coslada (Avda. Joaquín de Cárdenas, nº 2, 28823 Madrid), Hospital ASEPEYO Sant Cugat del Vallès (Avda. Alcalde Barnils, nº 54-60, 08174 Barcelona), and Hospital de día Cartuja ASEPEYO (C/ Américo Vespucio, nº 8, 41092 Sevilla).Delivery

    The successful bidder will duly transport the requested material to the location established in each hospital:p. 9✓

    Spanish original

    La empresa adjudicataria transportará debidamente el material solicitado hasta donde se establezca en cada hospital:

    routine delivery to three specified hospital addresses

  26. Low

    Section 5.2.5: Contractor must present a valued delivery note with every delivery.Financial

    The successful bidder must present a priced delivery note with each deliveryp. 9✓

    Spanish original

    La empresa adjudicataria deberá presentar en cada entrega un albarán valorado

    routine valued delivery note per shipment

  27. Low

    Section 5.2.5: The receiving person will sign the delivery note after verifying the accuracy of its recorded data.Compliance

    The person responsible for receiving the order will sign the delivery note after verifying that the data recorded on said delivery note is true.p. 9✓

    Spanish original

    La persona responsable de recibir el pedido firmará el albarán de entrega tras verificar que los datos consignados en dicho albarán son ciertos.

    routine receipt verification and signature step

  28. Low

    Section 5.3: Non-consignment material must be supplied on order according to the needs of ASEPEYO hospitals.Delivery

    The material shall be supplied on order, according to the needs of the ASEPEYO hospitals.p. 9✓

    Spanish original

    Se suministrará el material bajo pedido, según las necesidades de los hospitales de ASEPEYO.

    routine on-demand non-consignment supply

  29. Low

    Section 5.3: Non-consignment deliveries must be delivered to the addresses stated in Section 5.2.3 on the date specified in the order.Delivery

    Deliveries shall be made to the addresses set out in point 5.2.3 Delivery conditions and on the date established in the order.p. 10✓

    Spanish original

    Se entregarán en las direcciones establecidas en el punto 5.2.3. Condiciones de entrega y en la fecha establecida en el pedido.

    routine delivery to hospital sites on order date

  30. Low

    Section 6: The receiving person will sign the delivery note after verifying the accuracy of its recorded data.Compliance

    The person responsible for receiving the product shall sign the delivery note after verifying that the information stated on said delivery note is accurate.p. 10✓

    Spanish original

    La persona responsable de recepcionar el producto firmará el albarán de entrega tras verificar que los datos consignados en dicho albarán son ciertos.

    routine delivery note verification on receipt

  31. Low

    The contract duration is 12 months from the effective date of entry into force of the contract.Delivery

    12 months from the date of entry into force of the contractp. 12✓

    Spanish original

    12 meses desde la fecha de entrada en vigor del contrato

    standard 12-month contract duration

  32. Low

    The expected effective start of the contract is from the date stipulated in the signed contract.Delivery

    As of the date stipulated in the contractp. 12✓

    Spanish original

    A partir de la fecha que se estipule en el contrato

    standard contract commencement clause

  33. Low

    Supplies must be delivered to Hospital ASEPEYO at Avda. Joaquín de Cárdenas, nº 2, 28823 Coslada, Madrid (Section G.4).Delivery

    Hospital ASEPEYO Avda. Joaquín de Cárdenas, nº 2 28823 Coslada (Madrid)p. 13✓

    standard designated delivery location

  34. Low

    Supplies must be delivered to Hospital ASEPEYO at Avda. Alcalde Barnils, nº 54-60, 08174 Sant Cugat del Vallès, Barcelona (Section G.4).Delivery

    Hospital ASEPEYO Avda. Alcalde Barnils, nº 54-60 08174 Sant Cugat del Vallès (Barcelona)p. 13✓

    standard designated delivery location

  35. Low

    Supplies must be delivered to Hospital de día Cartuja ASEPEYO at C/ Américo Vespucio, nº 8, 41092 Seville (Section G.4).Delivery

    Hospital de día Cartuja ASEPEYO C/ Américo Vespucio, nº 8 41092 Sevillep. 13✓

    Spanish original

    Hospital de día Cartuja ASEPEYO C/ Américo Vespucio, nº 8 41092 Sevilla

    standard designated delivery location

  36. Low

    The Contract Manager shall supervise contract execution, make decisions, and issue necessary instructions to ensure proper performance under Article 62 LCSP.Compliance

    It shall correspond to the person responsible for the execution of the contract to supervise its execution and to adopt the necessary decisions and issue the necessary instructions in order to ensure the correct performance of the agreed services,p. 19✓

    Spanish original

    Al responsable de la ejecución del contrato le corresponderá supervisar su ejecución y adoptar las decisiones y dictar las instrucciones necesarias con el fin de asegurar la correcta realización de las prestaciones pactadas,

    routine contract supervision authority

  37. Low

    The awarded contractor must submit requested documentation via means determined by ASEPEYO in order to monitor proper contract execution.Compliance

    The successful tenderer must submit, by the means determined by Asepeyo for this purpose, the documentation requested from it, in order to monitor the correct execution of the contract.p. 19✓

    Spanish original

    La empresa adjudicataria deberá remitir por los medios que Asepeyo determine a tal efecto, la documentación que se le requiera, en aras a controlar la correcta ejecución del contrato.

    routine contract execution monitoring documentation

  38. Low

    Contract execution cannot commence prior to formalization, except in emergency cases provided under Art. 120 LCSP.Delivery

    Execution of the contract may not begin without its prior formalization, except in the cases provided for in article 120 of the LCSP.p. 32✓

    Spanish original

    No podrá iniciarse la ejecución del contrato sin su previa formalización, excepto en los casos previstos en el artículo 120 de la LCSP.

    routine statutory pre-formalization restriction, low risk

  39. Low

    Clause 18.1: Contract execution period is set in Section G of the characteristics summary and runs from the day following contract signature or the date stated in the contract.Delivery

    The contract execution period is that established in section G of the characteristics table, and shall start counting from the day following its signaturep. 35✓

    Spanish original

    El plazo de ejecución del contrato es el que se establece en el apartado G del cuadro de características, y empezará a contar a partir del día siguiente de su firma

    standard contract commencement rule, low risk

  40. Low

    Clause 18.2: Delivery of reports, studies, etc. must take place at Asepeyo with all associated delivery expenses borne by the awarded company.Delivery

    The delivery of reports, studies, etc., shall be made to Asepeyo, with the expenses arising from said delivery being borne by the awarded company.p. 35✓

    Spanish original

    La entrega de informes, estudios, etc., se realizará en Asepeyo, siendo los gastos derivados de dicha entrega a cargo de la empresa adjudicataria.

    routine deliverable handover and shipping cost, low risk

  41. Low

    Clause 18.2: Contractor must fulfill the contract within the total deadline and any partial deadlines established.Delivery

    The contractor is obliged to fulfill the contract within the total term and, where applicable, the partial terms, that have been established for the performance thereof.p. 36✓

    Spanish original

    El contratista está obligado a cumplir el contrato dentro del plazo total y, en su caso, de los parciales, que para la realización del mismo, se hayan establecido.

    routine schedule compliance obligation, low risk

Contract conditions26 rows · 3 high

  1. High

    Improvements forbidden — PCAP K.2Technical

    K.2 Improvements ☒ Improvements are not admittedp. 15✓

    Spanish original

    K.2 Mejoras ☒ No se admiten mejoras

    Improvements are not admitted.

  2. High

    Electronic submission portal — PCAP QCompliance

    bids must be submitted on the ELECTRONIC TENDERING PORTAL of ASEPEYO. https://contratacion.asepeyo.esp. 18✓

    Spanish original

    se deberán presentar las ofertas en el PORTAL DE LICITACIÓN ELECTRÓNICA de ASEPEYO. https://contratacion.asepeyo.es

    Offers submitted via any other channel will not be accepted.

  3. High

    Limitation of liability — no cap clause found in packLegal

    No limitation-of-liability or cap clause appears anywhere in the provided documents.

    no liability cap found in the provided documents — exposure is uncapped unless capped in a document not provided

  4. Medium

    Unit price determination — PCAP H.1Financial

    H.1 Price determination ☐Lump sum ☒Unit pricesp. 13

    Spanish original

    H.1 Determinación del precio ☐Tanto alzado ☒Precios unitarios

    Pricing must be structured as unit prices.

  5. Medium

    Data protection (LOPD / GDPR) — PCAP 17.1 (Applicability: if handling personal data)Compliance

    In the event that the successful bidder, in the performance of the service, has to handle files containing personal data within the framework of the object of this contract, it must comply with current legislation regarding the protection of personal data in accordance with the provisions of Organic Law 3/2018... ("LOPD") and Regulation (EU) 2016/679... (“GDPR”)p. 33

    Spanish original

    En el caso de que el adjudicatario, en el ejercicio de la prestación del servicio, tuviera que manejar ficheros con datos de carácter personal en el marco del objeto del presente contrato, deberá cumplir con la legislación vigente en materia de protección de datos de carácter personal conforme a lo dispuesto en la Ley Orgánica 3/2018... ("LOPD") y el Reglamento (EU) 2016/679... (“GDPR”)

    full LOPD and GDPR compliance required if personal data is processed

  6. Low

    Lote 1 (1.7-1.9) Double sterile pack must include spatulaTechnical

    - spatulap. 1

    Spanish original

    - espátula

    routine technical specification, low risk

  7. Low

    Lote 1 (1.10) Bullet kit must contain obturatorTechnical

    - obturatorp. 1

    Spanish original

    - obturador

    routine technical specification, low risk

  8. Low

    Lote 10 (10.1-10.2) SterileTechnical

    Sterilep. 1

    Spanish original

    Estéril

    routine technical specification, low risk

  9. Low

    Lote 10 (10.3-10.4) SterileTechnical

    Sterilep. 1

    Spanish original

    Estéril

    routine technical specification, low risk

  10. Low

    Lote 10 (10.5) SterileTechnical

    Sterilep. 1

    Spanish original

    Estéril

    routine technical specification, low risk

  11. Low

    Total tender budget: PBL 402,893.78 EUR excl. VAT (443,800.36 EUR incl. VAT); max limit 1,830,112.98 EUR incl. VATCommercial

    402,893.78 € | 443,800.36 € | 1,661,077.03 € | 1,830,112.98 €p. 4

    Spanish original

    402.893,78 € | 443.800,36 € | 1.661.077,03 € | 1.830.112,98 €

    routine tender budget summary row, low risk

  12. Low

    Total contract estimated value: 1,661,077.03 EUR excl. VAT; max limit 1,830,112.98 EUR incl. VATCommercial

    1,661,077.03 € | 1,830,112.98 €p. 6✓

    Spanish original

    1.661.077,03 € | 1.830.112,98 €

    routine total contract ceiling cap, low risk

  13. Low

    Lote 5 (5.1): Conector matriz submucosa porcina (MEC) diversas medidas, máx. 1.150,00 € sin IVA (consumo 13)Commercial

    5.1 | Porcine extracellular submucosa matrix (ECM) connector Various lengths and ø | 1,150.00 € | 10% | 1,265.00 € | 13 | 14,950.00 € | 16,445.00 €p. 8

    Spanish original

    5.1 | Conector de matriz submucosa porcina extracelular (MEC) Diversas longitudes y ø | 1.150,00 € | 10% | 1.265,00 € | 13 | 14.950,00 € | 16.445,00 €

    priced deliverable item with maximum unit price cap

  14. Low

    Lote 5 (5.2): Protector nervios MEC longitud 20 mm diversos ø, máx. 2.100,00 € sin IVA (consumo 2)Commercial

    5.2 | Nerve protector of porcine extracellular submucosa matrix (ECM) Length 20 mm. Various ø | 2,100.00 € | 10% | 2,310.00 € | 2 | 4,200.00 € | 4,620.00 €p. 8

    Spanish original

    5.2 | Protector nervios de matriz submucosa porcina extracelular (MEC) Longitud 20 mm. Diversos ø | 2.100,00 € | 10% | 2.310,00 € | 2 | 4.200,00 € | 4.620,00 €

    priced deliverable item with maximum unit price cap

  15. Low

    Lote 5 (5.3): Protector nervios MEC longitud 40 mm diversos ø, máx. 2.670,00 € sin IVA (consumo 20)Commercial

    5.3 | Nerve protector of porcine extracellular submucosa matrix (ECM) Length 40 mm. Various ø | 2,670.00 € | 10% | 2,937.00 € | 20 | 53,400.00 € | 58,740.00 €p. 8

    Spanish original

    5.3 | Protector nervios de matriz submucosa porcina extracelular (MEC) Longitud 40 mm. Diversos ø | 2.670,00 € | 10% | 2.937,00 € | 20 | 53.400,00 € | 58.740,00 €

    priced deliverable item with maximum unit price cap

  16. Low

    Lote 5 (5.4): Injerto nervio origen humano 15 mm diversos ø, máx. 2.298,00 € sin IVA (consumo 0)Commercial

    5.4 | Nerve graft of human origin. Length 15mm. Various ranges of ø | 2,298.00 € | 10% | 2,527.80 € | 0 | 0.00 € | 0.00 €p. 8

    Spanish original

    5.4 | Injerto de nervio origen humano. Longitud 15mm. Diversos rangos de ø | 2.298,00 € | 10% | 2.527,80 € | 0 | 0,00 € | 0,00 €

    priced deliverable item with maximum unit price cap

  17. Low

    Lote 5 (5.5): Injerto nervio origen humano 30 mm diversos ø, máx. 3.542,40 € sin IVA (consumo 5)Commercial

    5.5 | Nerve graft of human origin. Length 30mm. Various ø ranges | €3,542.40 | 10% | €3,896.64 | 5 | €17,712.00 | €19,483.20p. 8

    Spanish original

    5.5 | Injerto de nervio origen humano. Longitud 30mm. Diversos rangos de ø | 3.542,40 € | 10% | 3.896,64 € | 5 | 17.712,00 € | 19.483,20 €

    priced deliverable item with maximum unit price cap

  18. Low

    Lote 5 (5.6): Injerto nervio origen humano 50 mm diversos ø, máx. 5.505,60 € sin IVA (consumo 10)Commercial

    5.6 | Nerve graft of human origin. Length 50mm. Various ø ranges | €5,505.60 | 10% | €6,056.16 | 10 | €55,056.00 | €60,561.60p. 8

    Spanish original

    5.6 | Injerto de nervio origen humano. Longitud 50mm. Diversos rangos de ø | 5.505,60 € | 10% | 6.056,16 € | 10 | 55.056,00 € | 60.561,60 €

    priced deliverable item with maximum unit price cap

  19. Low

    Lote 5 (5.7): Injerto nervio origen humano 70 mm diversos ø, máx. 6.870,00 € sin IVA (consumo 1)Commercial

    5.7 | Nerve graft of human origin. Length 70mm. Various ø ranges | €6,870.00 | 10% | €7,557.00 | 1 | €6,870.00 | €7,557.00p. 8

    Spanish original

    5.7 | Injerto de nervio origen humano. Longitud 70mm. Diversos rangos de ø | 6.870,00 € | 10% | 7.557,00 € | 1 | 6.870,00 € | 7.557,00 €

    priced deliverable item with maximum unit price cap

  20. Low

    Lot 8.2: Bioabsorbable tendon anchor, max 650.00 EUR excl. VAT (19 units)Commercial

    8.2 | Bioabsorbable tendon anchor | 650.00 € | 10% | 715.00 € | 19 | 12,350.00 € | 13,585.00 €p. 9✓

    Spanish original

    8.2 | Anclaje para tendón bioabsorbible | 650,00 € | 10% | 715,00 € | 19 | 12.350,00 € | 13.585,00 €

    routine priced deliverable with maximum unit price cap, low risk

  21. Low

    Lot 8.3: PEEK bone anchor, max 900.00 EUR excl. VAT (16 units)Commercial

    8.3 | Peek bone anchor | 900.00 € | 10% | 990.00 € | 16 | 14,400.00 € | 15,840.00 €p. 9✓

    Spanish original

    8.3 | Anclaje para hueso Peek | 900,00 € | 10% | 990,00 € | 16 | 14.400,00 € | 15.840,00 €

    routine priced deliverable with maximum unit price cap, low risk

  22. Low

    Lot 9.1: Antibiotic spacers for Coslada and Sant Cugat hospitals, max 1,037.90 EUR excl. VAT (4 units)Commercial

    9.1 | Antibiotic spacers | 1,037.90 € | 10% | 1,141.69 € | 4 | 4,151.60 € | 4,566.76 €p. 9✓

    Spanish original

    9.1 | Espaciadores con antibiótico | 1.037,90 € | 10% | 1.141,69 € | 4 | 4.151,60 € | 4.566,76 €

    routine priced deliverable with maximum unit price cap, low risk

  23. Low

    Lot 11.1: Cartilage regenerator approx. 20x30 mm, max 1,502.02 EUR excl. VAT (8 units)Commercial

    11.1 | Cartilage regenerator. Approx. 20 mm x 30 mm | 1,502.02 € | 10% | 1,652.22 € | 8 | 12,016.16 € | 13,217.78 €p. 9✓

    Spanish original

    11.1 | Regenerador de cartílago. 20 mm x 30 mm aprox. | 1.502,02 € | 10% | 1.652,22 € | 8 | 12.016,16 € | 13.217,78 €

    routine priced deliverable with maximum unit price cap, low risk

  24. Low

    Lot 11.2: Cartilage regenerator approx. 30x40 mm, max 1,520.00 EUR excl. VAT (0 est. annual units)Commercial

    11.2 | Cartilage regenerator. Approx. 30 mm x 40 mm | 1,520.00 € | 10% | 1,672.00 € | 0 | 0.00 € | 0.00 €p. 9✓

    Spanish original

    11.2 | Regenerador de cartílago. 30 mm x 40 mm aprox. | 1.520,00 € | 10% | 1.672,00 € | 0 | 0,00 € | 0,00 €

    routine priced deliverable with zero estimated annual volume, low risk

  25. Low

    Lot 11.3: Cartilage regenerator approx. 40x50 mm, max 1,542.00 EUR excl. VAT (0 est. annual units)Commercial

    11.3 | Cartilage regenerator. Approx. 40 mm x 50 mm | 1,542.00 € | 10% | 1,696.20 € | 0 | 0.00 € | 0.00 €p. 9✓

    Spanish original

    11.3 | Regenerador de cartílago. 40 mm x 50 mm aprox. | 1.542,00 € | 10% | 1.696,20 € | 0 | 0,00 € | 0,00 €

    routine priced deliverable with zero estimated annual volume, low risk

  26. Low

    Lot 10 annual budget allocation: PBL 23,170.00 EUR excl. VAT (10% VAT) across 2027-2031Financial

    10 | Synthetic bone substitute of hydroxyapatite and calcium sulfate for the hospitals of Coslada and | 23,170.00 € | 10% | 5,792.50 € | 23,170.00 € | 23,170.00 € | 23,170.00 € | 5,792.50 €p. 10✓

    Spanish original

    10 | Sustitutivo óseo sintético de hidroxiapatita y sulfato cálcico para los hospitales de Coslada y | 23.170,00 € | 10% | 5.792,50 € | 23.170,00 € | 23.170,00 € | 23.170,00 € | 5.792,50 €

    routine multi-year budget allocation schedule, low risk

Quality & Certifications12 rows · 3 high

  1. High

    Contractor must comply with all applicable national or international regulations, standards, directives, or official instructions even if not explicitly mentioned in the tender.Compliance

    Compliance shall be mandatory for the successful bidder with any type of regulation, standard, directive or official instruction (of a national or international nature) that, even if not explicitly mentioned in these Specifications, is applicablep. 4✓

    Spanish original

    Será de obligado cumplimiento por parte del adjudicatario cualquier tipo de reglamento, norma, directiva o instrucción oficial (de carácter nacional o internacional) que, aunque no se mencione explícitamente en el presente Pliego, resulte de aplicación

    broad unenumerated regulatory compliance obligation

  2. High

    Technical bid must include a responsible declaration confirming all tendered products comply with all current regulations.Compliance

    A statement of compliance must be included in the technical offer confirming that all products in the tender comply with all applicable regulationsp. 6✓

    Spanish original

    Deberá incluirse en la oferta técnica una declaración responsable confirmando que todos los productos de la licitación cumplen con todas las normativas vigentes

    mandatory regulatory compliance declaration (Annex B)

  3. High

    Section 5.2.3: All sterile products must be supplied with a minimum remaining shelf life of 18 months.Quality

    All sterile products must be served with a minimum shelf life of EIGHTEEN months.p. 9✓

    Spanish original

    Todos los productos estériles deberán servirse con una caducidad mínima de DIECIOCHO meses.

    mandatory 18-month minimum sterile shelf life

  4. Medium

    Contractor must comply with any legal amendments occurring in relation to applicable standards during the contract term.Legal

    as well as any possible legal modifications that may occur in relation to the applicable standards, during the term of the contract.p. 4✓

    Spanish original

    así como las posibles modificaciones legales que puedan producirse en relación a las normas de aplicación, durante la vigencia del contrato.

    obligation to absorb future regulatory changes

  5. Medium

    Bidder must commit via Annex B model declaration to adapting products to any future legal modifications affecting applicable standards.Compliance

    committing to adapt said products to any possible legal modifications that may occur in relation to the applicable regulations (in accordance with the template ANNEX B included in the PPT).p. 6✓

    Spanish original

    comprometiéndose a adecuar dichos productos a las posibles modificaciones legales que puedan producirse en relación a las normas de aplicación (de acuerdo con el modelo ANEXO B que se incluye en el PPT).

    obligation to adapt products to future legal changes

  6. Medium

    Section 5.2.1: Delivery note traceability data must ensure compliance with the vigilance system established by current medical device regulations.Compliance

    allows compliance with the surveillance system established by the current regulations governing medical devices.p. 8✓

    Spanish original

    permita dar cumplimiento al sistema de vigilancia que establece la normativa vigente reguladora de los productos sanitarios.

    mandatory medical device vigilance regulatory compliance

  7. Medium

    Awarded companies accessing facilities must use the free software tool provided by ASEPEYO at contract award for managing external workers' business activities coordination and technical qualification documents.Quality

    successful tenderers must use the free tool or software available to ASEPEYO for the document management of workers of external suppliers (coordination of business activities and technical training) at the time of contract award.*p. 18✓

    Spanish original

    las empresas adjudicatarias deberán utilizar la herramienta o software gratuito del que disponga ASEPEYO para la gestión documental de los trabajadores de proveedores externos (coordinación actividades empresariales y capacitación técnica) en el momento de adjudicación del contrato.*

    routine compliance management using free ASEPEYO software

  8. Low

    Section 5.2.3: Products must be delivered in their original packaging and in perfect condition.Quality

    The products will be delivered in their original packaging and in perfect condition.p. 9✓

    Spanish original

    Los productos se entregarán en los envases originales y en perfecto estado.

    routine packaging and condition requirement

  9. Low

    If the winning contractor accesses ASEPEYO facilities, it must comply with Royal Decree 171/2004 developing Article 24 of the Occupational Risk Prevention Law (LPRL) on business activities coordination.Quality

    In the event that the successful tenderer accesses our facilities and in order to comply with the provisions of Royal Decree 171/2004, of 30 January, which develops art. 24 of the LPRLp. 18✓

    Spanish original

    En caso que la empresa adjudicataria acceda a nuestras instalaciones y con el fin de cumplir con lo establecido en el Real Decreto 171/2004, de 30 de enero, por el que se desarrolla el art. 24 de la LPRL

    routine statutory workplace safety coordination compliance

  10. Low

    ASEPEYO currently uses the EcoGestor software tool for managing external supplier worker compliance documentation.Quality

    Currently Asepeyo has established the tool called EcoGestor.p. 18✓

    Spanish original

    Actualmente Asepeyo tiene establecida la herramienta denominada EcoGestor.

    routine identification of required CAE software tool

  11. Low

    Clause 19: Contractor is responsible for the technical quality of the works developed and the supplies and services delivered.Quality

    The contractor shall be responsible for the technical quality of the works it develops and of the provisions and services performedp. 36✓

    Spanish original

    El contratista será responsable de la calidad técnica de los trabajos que desarrolle y de las prestaciones y servicios realizados

    routine technical quality responsibility, low risk

  12. Low

    Clause 22: Payment is conditional upon technical conformity certification of the contracted supply/service by Asepeyo's technical services.Quality

    once the provision of services that is the subject of the contract has been certified as conforming by the technical services of the Organization.p. 38✓

    Spanish original

    una vez certificada de conformidad por los servicios técnicos del Organismo, la prestación objeto del contrato.

    routine technical acceptance prerequisite, low risk

Personnel & CVs8 rows · 1 high

  1. High

    Clause 27.2.i: Non-payment of worker wages or breach of applicable collective bargaining agreement terms during execution triggers contract termination.Legal

    Non-payment, during the execution of the contract, of wages by the contractor to the workers who were participating in it, or breach of the conditions established in the collective agreements in force for these workersp. 41✓

    Spanish original

    El impago, durante la ejecución del contrato, de los salarios por parte del contratista a los trabajadores que estuvieran participando en la misma, o el incumplimiento de las condiciones establecidas en los Convenios colectivos en vigor para estos trabajadores

    wage default or labor breach triggers termination

  2. Medium

    Where personnel subject to Public Sector Incompatibilities Law 53/1984 are affected, granted compatibility and regulatory compliance must be accredited prior to award.Legal

    the granting of the corresponding compatibility, as well as its submission to the incompatibility regulations in force at the time of contracting, must be proven prior to the award of the contract.p. 30✓

    Spanish original

    deberá acreditarse previamente a la adjudicación del contrato la concesión de la correspondiente compatibilidad, así como su sometimiento a la normativa de incompatibilidades vigente en el momento de la contratación.

    mandatory pre-award statutory incompatibility clearance

  3. Low

    Where applicable for disability tie-breaking, a disability certificate or declaration issued by competent Autonomous Community services or IMSERSO offices in Ceuta and Melilla must be provided.Compliance

    Where applicable, certificate or declaration of disability issued by the Services or Centres of the Autonomous Communities and the directorates of IMSERSO in the cities of Ceuta and Melillap. 30✓

    Spanish original

    En su caso, certificación o declaración de minusvalía expedida por los Servicios o Centros de las Comunidades Autónomas y las direcciones del IMSERSO en las ciudades de Ceuta y Melilla

    conditional tie-breaker supporting document, low risk

  4. Low

    Clause 18.2: When advised by contract execution, Asepeyo may require the contractor to designate an approved responsible representative to organize performance and implement instructions.Delivery

    Asepeyo may request from the contractor the designation of a person to act as their representative, subject to prior acceptance by said authority, to organize the performance of the contractp. 35✓

    Spanish original

    Asepeyo podrá recabar del contratista la designación de una persona que actúe como responsable suyo, previa aceptación por dicho órgano, para organizar la realización del contrato

    routine contract manager designation requirement, low risk

  5. Low

    Clause 18.2: Contractor must maintain the necessary personnel required to execute the contract.Delivery

    The contractor shall have the necessary personnel for the execution of the contract.p. 35✓

    Spanish original

    El contratista contará con el personal necesario para la ejecución del contrato.

    routine staffing obligation, low risk

  6. Low

    Clause 18.2: Personnel depend exclusively on the awardee with full employer rights and duties, leaving the Mutua completely unrelated to labor relationships.Legal

    Said personnel shall depend exclusively on the contractor, who shall have all the rights and duties inherent to their status as employer with respect to them, the contracting Mutua being completely extraneous to said employment relationships.p. 35✓

    Spanish original

    Dicho personal dependerá exclusivamente del adjudicatario, el cual tendrá todos los derechos y deberes inherentes a su calidad de empleador respecto del mismo, siendo la Mutua contratante del todo ajena a dichas relaciones laborales.

    standard independent employer clause, low risk

  7. Low

    Clause 18.2: Contractor must immediately replace personnel when necessary so that contract execution remains continuously ensured.Delivery

    The contractor shall proceed immediately, if necessary, to replace the required personnel in such a way that the execution of the contract is always ensured.p. 35✓

    Spanish original

    El contratista procederá inmediatamente, si fuere necesario, a la sustitución del personal preciso de forma que la ejecución del contrato quede siempre asegurada.

    routine staffing continuity obligation, low risk

  8. Low

    Clause 18.2: Awardee must submit a list of personnel to the Mutua, and such personnel must comply with established control and security regulations.Compliance

    a list of the personnel, who shall be subject to the established control and security rules.p. 36✓

    Spanish original

    una relación del personal, el cual se someterá a las normas de control y seguridad establecidas.

    routine personnel roster and security compliance, low risk

Company Documents13 rows

  1. Medium

    The proposed awardee must provide an administrative certificate issued by the competent body proving it is current on tax obligations under Art. 13 RGLCAP.Compliance

    Administrative certification issued by the competent body, attesting that the bidder is up to date with its tax obligationsp. 29✓

    Spanish original

    Certificación administrativa expedida por el órgano competente, acreditativa de que el licitador se encuentra al corriente de sus obligaciones tributarias

    mandatory tax clearance certificate

  2. Medium

    The proposed awardee must provide an administrative certificate proving it is current on Social Security obligations under Art. 14 RGLCAP.Compliance

    Administrative certificate, issued by the competent body, certifying that the tenderer is up to date with its Social Security obligationsp. 30✓

    Spanish original

    Certificación administrativa, expedida por el órgano competente, acreditativa de que el licitador se encuentra al corriente de sus obligaciones con la Seguridad Social

    mandatory Social Security clearance certificate

  3. Low

    Bidder must state signatory name, ID, legal representation capacity (own behalf or represented company), tax ID, and fiscal domicile in the declaration form.Compliance

    on (one's own behalf or that of the company represented),p. 1✓

    Spanish original

    en nombre (propio o de la empresa que representa),

    routine bidder identification, low risk

  4. Low

    Participating bidders must submit company identification details using Annex II.Compliance

    Annex II Identifying details of the company participating in the tenderp. 3✓

    Spanish original

    Anexo II Datos identificativos de la empresa participante en la licitación

    routine bidder identification form

  5. Low

    Awarded bidder must submit the General Responsible Declaration using Annex IV.2.Compliance

    Annex IV.2 General Responsible Statement of the awardee companyp. 3✓

    Spanish original

    Anexo IV.2 Declaración Responsable General de la empresa adjudicataria

    routine compliance self-declaration

  6. Low

    Submitting a ROLECE registration certificate exempts the bidder from submitting capacity and solvency documentation required in Annexes IV.1 to IV.3 for the items accredited therein.Compliance

    The submission of the certificate of registration in the Official Registry of Bidders and Classified Companies of the State shall exempt the bidder from submitting the documentation of capacity and solvency required in Annexes IV.1 to IV.3p. 15✓

    Spanish original

    La presentación del certificado de inscripción en el Registro Oficial de Licitadores y Empresas Clasificadas del Estado, eximirá al licitador de la presentación de la documentación de capacidad y solvencia exigida en los Anexos IV.1 a IV.3

    routine administrative exemption for registered bidders

  7. Low

    When submitting a ROLECE registration certificate, a sworn declaration of validity of its contents must also be provided using the Annex IV.2 template.Compliance

    In this case, along with the registration certificate, a responsible declaration of the validity of the data contained therein must be provided, according to the template shown as Annex IV.2 of these Specifications.p. 15✓

    Spanish original

    En este supuesto, junto con el certificado de inscripción, deberá aportarse declaración responsable de vigencia de los datos contenidos en el mismo, según el modelo que figura como Anexo IV.2 de este Pliego.

    routine supporting declaration for ROLECE proof

  8. Low

    Presentation of the ROLECE certificate shall have the legal effects established in Article 96 of the LCSP.Legal

    The submission of the ROLECE certificate shall have the effects provided for in article 96 of the LCSP.p. 15✓

    Spanish original

    La presentación del certificado ROLECE tendrá los efectos previstos en el artículo 96 LCSP.

    routine statutory recognition of registry certificate

  9. Low

    As an exception, all sworn declarations (declaraciones responsables) submitted by bidders must be originals.Compliance

    except for solemn declarations, which must be originals.p. 18✓

    Spanish original

    salvo las declaraciones responsables, que deberán ser originales.

    routine requirement for original sworn declarations

  10. Low

    Clause 9.1.1: Contractor classification certificate must be accompanied by a declaration of responsibility confirming circumstances have not changed.Compliance

    It must be accompanied by a responsible statement confirming that the circumstances certified therein have not changed.p. 23✓

    Spanish original

    Deberá acompañarse de una declaración responsable de que no han variado las circunstancias que en él se acreditan.

    routine declaration accompanying classification certificate

  11. Low

    Clause 9.2: ROLECE registration certificate (per Section I.3) carries the evidentiary effects of Article 96 LCSP.Compliance

    The submission of the certificate of registration in the ROLECE referred to in section I.3 of the schedule of characteristics of this specification shall have the effects provided for in article 96 LCSP.p. 23✓

    Spanish original

    La presentación del certificado de inscripción en el ROLECE al que se refiere el apartado I.3 del cuadro de características del presente pliego tendrá los efectos previstos en el artículo 96 LCSP.

    standard official registry certificate rule

  12. Low

    Clause 10.3: Bidders acting through an agent must be represented by a duly authorized representative.Legal

    on their own behalf or through a duly authorized representative,p. 24✓

    Spanish original

    por sí o por medio de representante, debidamente autorizado,

    routine power-of-attorney authorization requirement

  13. Low

    Supporting documentation for tie-breaker criteria must be submitted by bidders at the time the tie occurs.Compliance

    The documentation certifying the referred tie-breaking criteria shall be provided by the bidders at the time the tie occurs.p. 29✓

    Spanish original

    La documentación acreditativa de los criterios de desempate referidos será aportada por los licitadores en el momento en que se produzca el empate.

    conditional post-tie documentation rule, low risk