Method statement generator.
Upload tender PDFs and Lucius drafts a structured method statement (methodology, RAMS, quality, H&S) with every section anchored back to the source clauses.
Free to use. The draft is written after you create a free account, and you land back on this page with your files still selected.
Drop your tender PDFs or click to browse
Multi-file (Part A Requirements + Part B Questions both work) · auto-deleted after generation
Example output
What a generated method statement looks like
Three of the sections from a sample pack: the replacement of an HVAC plant and building management system at a laboratory. The client and the pack are fictional; the structure, the clause anchors and the page references are exactly what the generator writes for a real one.
2. Methodology
The works are delivered in three phases so that laboratory pressure cascades are held within plus or minus 5 Pa throughout (Clause 4.2, p. 11). Phase 1 installs the temporary chiller and commissions the BMS bridge before any existing plant is isolated. Phase 2 replaces the two 450 kW chillers one at a time, each change-over scheduled inside an agreed shutdown window and recorded against the programme in MS Project format (Clause 6.4, p. 19). Phase 3 covers ductwork cleaning to BS EN 15780 and commissioning to CIBSE Code A and W (Clauses 4.7 and 8.3, pp. 12 and 24).
5. Risk assessment and method statement (RAMS)
Refrigerant handling is carried out only by F-Gas certified engineers, with recovery cylinders weighed and logged before and after each charge (Clause 4.8, p. 12). Loss of pressure cascade during change-over is rated high and controlled by the temporary plant in Phase 1, continuous differential-pressure logging and a stop-work trigger at plus or minus 4 Pa. Roof-top lifts are planned under a lift plan reviewed by the appointed person, with exclusion zones agreed with the laboratory manager (Clause 5.3, p. 15).
6. Health and safety
A construction phase plan under CDM 2015 is issued before mobilisation (Clause 5.1, p. 14). COSHH assessments cover refrigerants, flushing chemicals and duct-cleaning agents, and the site induction includes the laboratory's own containment rules. Employer's liability cover is held at GBP 10 million, matching the stated requirement (Clause 7.6, p. 22).
Every paragraph is anchored to the clause and page it answers, so a reviewer can check the claim against the pack. Sections the pack does not support are left as visible gaps for you to fill.
How the method statement generator works
Drop your tender PDFs (Part A requirements, Part B questions, both work) and Lucius reads them end to end, maps the requirements it finds to the evaluation criteria, and drafts a section-by-section method statement with the source clause cited next to each recommendation.
What you get back
- Methodology: step-by-step approach with milestones and deliverables.
- Resource plan: personnel, equipment, and supply chain.
- Quality & compliance: ISO-aligned procedures and KPIs.
- Risk: RAMS-format assessments with control measures.
- Health & Safety: CDM 2015 / COSHH / PPE requirements.
Built for construction, facilities, cleaning, and engineering teams responding to PQQ or ITT submissions. UK-HSE-aware. Output is an editable Word document: pick it up, refine the voice, submit.
Try Our Other Free Tools
All tools are free to use. The method statement generator asks for a free account before it writes.
Upload any RFP for instant AI risk analysis
Check your bid draft against the tender requirements
See how much AI tender review saves your team
Score your bid strength across key criteria
Estimate your chances before committing to bid
Check if your business is ready for public tenders